Claim Missing Document
Check
Articles

Re-Layout Layout of Material Warehouse Using Dedicated Storage Method at PT. A B C R. Erik Hidayat; Boy Isma Putra
PROZIMA (Productivity, Optimization and Manufacturing System Engineering) Vol 3 No 2 (2019): Desember
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/prozima.v3i2.1270

Abstract

PT. ABC is one of the companies that consentration in steel construction. The company has an extensive warehouse perfectly adequate. But the problems faced by PT. ABC in warehouse goods product company has no arrangements regarding the layout of raw materials, so at this time to adjust the position of the storage and preparation of raw materials, made by placing the material in an irregular position and randomly depending on the position of the empty warehouse. As a result, the time period of materials so long and the production becomes inhibited. The method used in this research is by using methods dedicated storage. This method is used to minimize time and comparing the activity mileage outgoing or incoming raw materials. From the analysis results obtained value is 8258.77 meter distance. Recommendations for improvement given that create a new layout for the arrangement of raw materials in PT. A B C
Analisis Manual Material Handling Pada Pekerja Borongan Di PT. JC dengan Metode NBM dan RWL Mochamad Nuri Affa; Boy Isma Putra
PROZIMA (Productivity, Optimization and Manufacturing System Engineering) Vol 1 No 1 (2017): June
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/prozima.v1i1.703

Abstract

PT. JC is a company that uses means of transporting goods to the manual process, or so-called Manual Materials Handling (MMH) is done by workers in the Department of Warehouse. In addition to the process of moving goods by using aids such as forklifts manual removal is still needed in this company because it has advantages compared to using the tool for material removal manually can be done in a limited space. In the process of manual material handling led to several complaints that arise and can be analyzed using a Nordic body map (NBM). The use of nordic body map is an appropriate method to use because by analyzing the map of the body aimed at any part of the body feels pain. Besides complaints can also be known value Recomended Weight Limit (RWL) as recommended by NIOSH (National Institute of Occupational Safety and Health) on estimates possibility of stretching further to the value of Lifting Index (LI) aims to determine the estimated value relative to the voltage level of physical processes manual material handling. From manual material handling processes that cause the symptoms of musculoskeletal disorder completion technically be done to minimize the effects on workers.
Tofu Cutting Tool Design Improvement With Value Engineering Approach Dani Budihamsyah; Boy Isma Putra
PROZIMA (Productivity, Optimization and Manufacturing System Engineering) Vol 1 No 2 (2017): December
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/prozima.v1i2.1341

Abstract

Tahu merupakan makanan olahan yang terbuat dari pemerahan gilingan kacang kedelai makanan yang tergolong mempunyai protein yang tinggi. Tingginya minat akan konsumsi tahu membuat para produsen tahu harus bekerja keras untuk memenuhi permintaan yang makin hari kian meningkat. Untuk menjaga komitmen kepada pelanggan maka harga, kualitas dan ketersediaan tahu harus dipertahankan. Kecacatan fisik dan keseragaman ukuran tahu menjadi faktor penting agar konsumen tidak merasa dirugikan. Untuk mengurangi kecacatan ukuran dan bentuk fisik tahu serta mempercepat waktu proses pemotongan tahu maka harus dibuatkan suatu alat yang dapat membantu proses pemotongan tahu. Metode value engineering menawarkan cara bagaimana proses pembuatan cetakan tahu dengan kualitas terbaik dengan harga yang paling terjangkau tetapi tetap mempertahankan kualitas, reliabilitas, performa dan tentunya dengan harga yang terbaik. Dengan pembuatan cetakan tahu menggunakan metode value engineering, akan menambah performa operator pemotongan tahu agar meningkatkan efisiensi waktu hingga 56,5% dan tingkat presisi serta mengurangi tingkat kecacatan pada tahu sebesar 88%. Metode VE ini juga membantu dalam pemilihan alternative yang terbaik dari segi biaya hingga 12%, tetapi performa, ketahanan, dan keandalan tetap terjaga sehingga akan meningkatkan produktivitas dan menambah keuntungan bagi perusahaan.
Inventory Control of Nalco Water Treatment Raw Materials Using the Lot Sizing Method Masad Hariyadi; Boy Isma Putra
PROZIMA (Productivity, Optimization and Manufacturing System Engineering) Vol 2 No 2 (2018): December
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/prozima.v2i2.2199

Abstract

The limited supply of Nalco raw materials from producers has become a problem for PT ABC, this has led to the control of raw material inventory at PT ABC not including good management, because in the management of raw materials the company still records inventory with manual systems and in ordering raw materials only based on estimates. From the results of the study, the forecasting method used is the Double Exponential Smoothing Holt's, Brown, and Holt Winters Additive Algorithm methods, from the three methods that are most suitable is the Double Exponential Smoothing Brown method with the smallest Mean Square Error of 256.2. Calculation of Sizing Lot by using Economic Order Quantity method, Least Unit Cost method, and Silver Meal method, of the three methods the most optimal is the Economic Order Quantity method because it has the lowest cost of Rp. 12,651,145. The calculation of Safety Stock gets 17 Pail results. and for Reorder Points for Nalco Water Treatment raw material, which is 29 Pail.
Perencanaan Jumlah Material yang Minimal dengan Metode Material Requirement Planning (Studi Kasus PT. Z) Aska Putra Pamungkas; Boy Isma Putra
Jurnal SENOPATI : Sustainability, Ergonomics, Optimization, and Application of Industrial Engineering Vol 2, No 2 (2021): Jurnal SENOPATI Vol.2 No.2
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.senopati.2021.v2i2.1702

Abstract

PT. Z merupakan perusahaan yang bergerak dibidang manufaktur yang memproduksi berbagai jenis perhiasan. Proses produksi perhiasan merupakan proses produksi make to order yang berpolakan fluktuatif. Perusahaan sering kali tidak dapat memperkirakan jumkah bahan baku yang dibeli beserta biaya minimum yang dikeluarkan untuk memenuhi permintaan. Tujuan penelitian yaitu memenuhi jumlah bahan baku pembuatan kalung yang diproduksi dengan biaya minimum. Metode yang digunakan dalam penelitian adalah metode Material Reguirement Planning (MRP). MRP merupakan metode yang dapat membantu penyelesaian persoalan yang kemudian diuraikan secara detail dengan melakukan beberapa tahap penyelesaian sampai pada yang optimum. Dari hasil perhitungan bahan baku tahun 2019 yang dilakukan menggunakan metode perusahaan sebesar Rp 25.839.584.100 lebih besar dari metode MRP yaitu sebesar Rp. 25.807.204.800,- dengan metode MRP perusahaan dapat mengurangi biaya hingga Rp. 32.409.800,- atau penghematan sebesar 0,13%. dan interval pemesanan dari 12 kali menjadi 6 kali selama setahun.
Analisa Beban Kerja Pada Pekerja Konveksi Menggunakan Work Load Analysis Titik Nur Damayanti; Boy Isma Putra
Jurnal SENOPATI : Sustainability, Ergonomics, Optimization, and Application of Industrial Engineering Vol 2, No 1 (2020): Jurnal SENOPATI Vol.2 No.1
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.senopati.2020.v2i1.1123

Abstract

untuk mengetahui beban kerja dan mengoptimalkan beban kerja yang sesuai
Identifikasi Waste Kritis Pada Proses Produksi Pallet Plastik Menggunakan Metode WAM (Waste Assessment Model) Di PT. XYZ Atok Irawan; Boy Isma Putra
Jurnal SENOPATI : Sustainability, Ergonomics, Optimization, and Application of Industrial Engineering Vol 3, No 1 (2021): Jurnal SENOPATI Vol.3 No.1
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.senopati.2021.v3i1.2098

Abstract

PT. XYZ merupakan perusahaan manufaktur yang bergerak di bidang industri plastik dengan produk utama pallet plastik. Dalam menjalankan proses produksinya masih ditemukan banyak kendala, salah satunya masih banyaknya produk cacat yang dihasilkan. Berdasarkan data perusahaan pada tahun 2020, produk cacat yang dihasilkan rata-rata sebesar 7,1% perbulan melebihi batas toleransi perusahaan sebesar 5%. Produk cacat tersebut mengindikasikan adanya waste dalam proses produksi, sehingga perusahaan akan mengalamai kerugian jika hal ini terjadi secara terus menerus. Maka perlu dilakukan perbaikan segera atas permasalahan waste yang ada. Sebagai upaya penanganan permasalahan waste yang efisien dalam waktu dekat, perlu dilakukan identifikasi waste kritis untuk mengetahui waste yang paling dominan yang membutuhkan perbaikan segera. Langkah awal penelitian ini yaitu dengan memetakan aliran fisik dan informasi yang terjadi pada proses produksi untuk mengidentifikasi waste apa saja yang terjadi selama proses produksi. Kemudian dilakukan pembobotan waste kritis menggunakan metode WAM (Waste Assessment Model). Berdasarkan pembobotan waste kritis didapatkan hasil waste defect dengan presentase terbesar yaitu 21,54%. Berdasarkan waste kritis yang telah teridentifikasi, dilakukan analisa akar penyebab terjadinya waste kritis tersebut menggunakan metode 5W + 1H. Sehingga dapat dilakukan perbaikan segera sesuai akar penyebab terjadinya waste kritis tersebut.
ANALISIS MODEL KREATIFITAS DAN MOTIFASI BELAJAR TERHADAP PRESTASI AKADEMIK DAN KECERDASAN ENTERPRENEURIAL PADA MAHASISWA TEKNIK INDUSTRI Boy Isma Putra; Wiwik Sumarmi
Industri Inovatif : Jurnal Teknik Industri Vol 2 No 2 (2012): inovatif Vol. 2 No. 2
Publisher : Prodi Teknik Industri S1 Institut Teknologi Nasional Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dalam lingkup dunia kerja ditemukan bahwa kebutuhan untuk belajar atau motivasi belajar mutlak diperlukan untuk melakukan usaha pengembangan diri yang akan menciptakan tenaga kerja yang berkualitas. Bagi mahasiswa, salah satu bentuk kualitas dan motivasi belajar dapat dilihat dari indeks prestasi (IPK) yang diliki. Mahasiswa yang berprestasi diharapkan mempunyai jiwa enterpreneurship yang tinggi, sehingga dengan mengkombinasikan bakat, skill dan kreativitas, mahasiswa diharapkan dapat menciptakan pekerjaan sendiri. Tujuan dari penelitian ini adalah untuk menganalis model kreativitas dan motivasi belajar terhadap prestasi akademik dan kecerdasan enterpreneur.Data yang digunakan dalam penelitian ini adalah data primer dalam bentuk kuesioner dengan skala like. Adapun resposdennya adalah mahasiswa TI UMSIDA (Universitas Muhammadiyah Sidoarjo) dengan jumlah sampel sebanyak 110 sampel. Teknik analisis yang digunakan dari kualitatif di kuantitatifkan dengan menggunakan skala 5 (Lima), analisis SEM yang akan mempermudah untuk melihat hubungan kausalitas secara tersusun yang akan diuji.Berdasarkan model yang dimodifikasi didapatkan Motivasi Belajar berpengaruh terhadap Prestasi Akademik dan Prestasi Akademik berpengaruh positif namun tidak signifikan terhadap Kecerdasan Enterpreneurial. Modifikasi menjadikan model menjadi bagus dengan nilai Goodness of Fit dan Cut off Value, nilai Chi-square 17.880; probabilitas 0.657; CMIN/DF 0.851; RMSEA 0.000; GFI 0.969; AGFI 0.918; TLI 1.009; dan CFI1.00. dimana nilai – nilai tersebut telah memenuhi nilai kritis yang telah ditentukan.
Repair Design of Packing Tube Operator Work Aids in the Packaging Industry with Nordic Body Map and Anthropometry Methods: Rancangan Perbaikan Alat Bantu Kerja Operator Packing Tube pada Industri Packaging dengan Metode Nordic Body Map dan Antropometri Melisa Novitasari; Boy Isma Putra
Indonesian Journal of Innovation Studies Vol. 13 (2021): January
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (272.417 KB) | DOI: 10.21070/ijins.v13i.535

Abstract

Betts Indonesia a company engaged in manufacturing tube manufacture. This study aims to determine a comfortable working posture to optimize performance and be able to minimize injuries to body parts. Data processing was carried out by measuring body dimensions and distributing research questionnaires to 40 respondents. The method used to see how severe the level of risk of injury is using REBA. Based on the initial calculation process at the packing tube work station using the REBA method, it has an average risk level of 11 which is included in the high risk level and needs to be repaired immediately. After repairing the work aids, the REBA score was 6 which was included in the medium level. The work aids that have been made can help improve the operator's work posture so as to minimize the risk of injury and make it easier to check the product and reduce the level of defects in the product.
Community Dedication on General Facilities Using Solar Cell System in Kalialo Village, Kupang, Jabon, Sidoarjo Boy Isma Putra; Jamaaluddin Jamaaluddin; Shazana Dhiya Ayuni
Kontribusia : Research Dissemination for Community Development Vol 4 No 2 (2021): Kontribusia (Research Dissemination for Community Development)
Publisher : OJS Universitas Muhammadiyah Gresik

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (335.448 KB) | DOI: 10.30587/kontribusia.v4i2.2529

Abstract

In essence, road access to Kalialo Village is still very difficult due to the dark terrain and street lighting (PJU), this is because the PJU electricity in the village has been cut off since the last 6 months. Kalialo Village has provided information to PLN regarding the cut off of public street lighting but has not received any response to date.To help and facilitate this access, we as the Center for Engineering and Energy Studies feel the need for a Solar Power Plant (PLTS) or Solar Cel. Which will be installed at certain vital points or locations on the road access to Kalialo Village.
Co-Authors Achmad Nuzul Amri Affandi , Ghozali Rusyid Aldy Tasandy Andriansyah Alfian Fajar Gunawan Ali Akbar Ardana, Muhammad Rizky Aska Putra Pamungkas Athika Sidhi Cahyana Atikha Sidhi Cahyana Atok Irawan Cholifah Cholifah, Cholifah Damayanti, Titik Nur Dani Budihamsyah Dewi Andriyani Diwanti Faradiba, Nabila Edi Widodo, Edi Faizal Mega Hardiansyah Fajar Alifka Hadi Fandra Prastyo Al Havish Fazrur Suman Prambahan Felly Denia Rochman Ghozali Rusyid Affandi Hana Catur Wahyuni Ifan Wahyu Pranata Dewantara Indah Apriliana Sari Irawan, Atok Irma Dwi Setyowati iswanto Iswanto Iswanto Jakaria, Ribangun B Jamaaluddin Kharisma, Aditya Nur Lazuardani, Zidan Rasyidi Luhur Arif Santoso Marodiyah, Inggit Marzuki Ibrahim Masad Hariyadi Melisa Novitasari Misbaghi, Yoni Fajar Mochamad Andre Firdiansyah Mochamad Nuri Affa Mochamad Sofwan Agil Mochammad Imam Mashuri Mohammad Reza Khatamy Much Syafiudin Muchammad Ikbal Pratama Muhammad Alfin Afiyanto Muhammad Bayu Aji Saputra Muhammad Kelvin Alfindo Muhammad Rifqi Maulana Nasoik, M. Kholisun Pamungkas, Aska Putra Prayoga Dwi Firmansyah Puspista Handayani Putri, Natasya Kurniawan R. Erik Hidayat Ramadhani, Satria Ribangun Bamban Jakaria Rohman, Ahmad Fathur Romi, Mochammad Sari, Indah Apriliana Satria Ramadhani Seftiardiyah, Yenni Setiyono, Wisnu Panggah Setya Adi Pratama Setya Adi Pratama Setya Budi Shazana Dhiya Ayuni Siti Wachidatul Bahiyyah Sultan Afli Tedjo Sukmono Thurmudhi, Moch Ibad Titik Nur Damayanti Wafika Urfa Maulidah Wiwik Sulistiyowati Wiwik Sumarmi Wulandari, Indah Apriliana Sari Yulianto, Rizky Zahara Sofillauny