Estimated Flood Discharge in Downstream Krueng Meureubo of Pasi Pinang Section West Aceh Regency Ikhsan, Muhammad; Rinaldy, Rinaldy
International Journal of Engineering, Science and Information Technology Vol 1, No 1 (2021)
Publisher : Department of Information Technology, Universitas Malikussaleh, Aceh Utara, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (708.816 KB) | DOI: 10.52088/ijesty.v1i1.41

Abstract

The phenomenon of floods in Indonesia has become a routine thing that happens every year, almost all areas that are lowlands often flood when the rainy season arrives. Flooding is caused by high rainfall where the ability of the soil to absorb water decreases along with the rapid development of land that was once a rainwater catchment area, consequently surface runoff becomes high. Pasi Pinang Village can be categorized as a very flood prone village in Meureubo Subdistrict, due to the low condition of this village and directly borders the Meureubo river. Many adverse effects caused by floods and cause losses to the local community. The phenomenon of floods in Indonesia has become a routine thing that happens every year, almost all areas that are lowlands often flood when the rainy season arrives. Flooding is caused by high rainfall where the ability of the soil to absorb water decreases along with the rapid development of land that was once an area. In this case a study on flood discharge analysis needs to be done in order to reduce the incidence of flooding in the village of Pasi Pinang. The method used in this study is the Nakayasu HSS method, aim of this study is to determine the amount of flood discharge that occurred in the Krueng Meureubo River Basin in Pasi Pinang Village. Total hydrograph discharge calculated using the Nakayasu HSS method is the watershed area (A) = 1961.53 km, length of main river (L) = 157.02 km, time delay (tg) = 9.507 hours, duration of rain (Tr) = 7 , 13 hours, the time from the beginning of the flood to the peak of the flood hydrograph (tp) = 15.21 hours, the time of discharge 0.3 times the peak flood discharge (t0.3) = 19.01 hours and the peak flood discharge (Qp) = 23.109 m3 / sec then the total hydrograph discharge obtained by the Nakayasu method is equal to = 2040.26 m3/sec.
Analysis Of Project Success Inhibition Factors Zulyaden, Zulyaden; Rinaldy, Rinaldy
International Journal of Engineering, Science and Information Technology Vol 1, No 1 (2021)
Publisher : Department of Information Technology, Universitas Malikussaleh, Aceh Utara, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (799.272 KB) | DOI: 10.52088/ijesty.v1i1.208

Abstract

In the implementation of activities we often find what is called a project. The project is an activity that must be completed in accordance with the specified target and time, so that the project can be regarded as a success in project implementation. One of the projects in ques-tion is the construction project. Construction projects in their implementation we often encounter various kinds of problems that arise from the elements involved in them, so this can hamper the success of a project that is being implemented. One problem that arises from the contractor factor and contract specification. The purpose of this study is to find out one of the main inhibiting factors in the successful implementation of construction projects in Aceh Province. Classification of construction services for respondents is all construction ser-vices from the middle class (M) to large classes (B). The data obtained the total population of construction services as many as 508 con-tactors from observations of projects that have been completed from 2010-2015 with funds from the Aceh Budget (APBA). By using the Slovin formula a total sample of 84 contractors was found. The method used in this study is a combined method, namely qualitative and quantitative methods through questionnaires. The independent variables reviewed are the contractor factor and the contract specification factor while the dependent variable is the success of the project. For statistical analysis the data process is done by using validity and reliability tests, while analyzing the data is done by using multiple linear regression with the help of Product Solution and Service Statis-tics (SPSS) version 22. The results of the study indicate that the contractor factor is one of the main inhibiting factors in the successful implementation of the project in Aceh Province.
Determinant Analysis Of Conflict On Project Results In Aceh Province Rinaldy, Rinaldy; Ikhsan, Muhammad
International Journal of Engineering, Science and Information Technology Vol 1, No 1 (2021)
Publisher : Department of Information Technology, Universitas Malikussaleh, Aceh Utara, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (748.326 KB) | DOI: 10.52088/ijesty.v1i1.37

Abstract

The project is an activity with a target that must be completed within a certain period, where in its implementation often obstacles arise between the elements involved in it. Problems that arise must be immediately handled properly and appropriately so that the achievement of results is as expected.. Conflict is a condition of the oc-currence of discrepancies between values or goals to be achieved, both existing in individuals and in relationships with others. The purpose of this research is to find out one of the main factors causing conflict in project implementation. The method used in this study is a combined method, namely quantitative and qualitative methods through the distribution of questionnaires with the limitation of project observations from 2009-2011 that have been completed, with funding coming from the Aceh Budget (APBA). Designation of respondents for all classifications of construction services, from medium classification (M) to large classification (B). Population Construction executing services from the data obtained were 502 contractors, using the Slovin formula found a sample of 84 contractors. The independent variables reviewed are the owner factor and the project condition factor, while the dependent variable is the success of the project. To analyze data using multiple linear regression with the help of Product Solutions and Statistical Services (SPSS) version 22, while the statistical analysis performed in data processing is to test the validity and reliability. Based on research shows that the owner factor is one of the maint factors that cause conflict in project implementation in Aceh Province.