Claim Missing Document
Check
Articles

Analysis Quality Control in Project Development Warehouse PT Santos Jaya Abadi Sidoarjo Using the Process Decision Program Chart Method Yohanes Usman Nandyanto; Michella Beatrix; Masca Indra Triana
Indonesian Journal Of Civil Engineering Education Vol 9, No 2 (2023): Indonesian Journal of Civil Engineering Education
Publisher : Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20961/ijcee.v9i2.83614

Abstract

Abstract: The rapid development of the construction world today, competition in the construction world is also increasingly fierce so that assurance and control of quality are demanded higher. One form of realization in facing competition and meeting these demands is the preparation of quality control. The purpose of this study is to determine the implementation of quality control in warehouse construction projects and to determine the risk analysis of existing structural work so that quality control can be implemented better. This research begins with data collection through a questionnaire method distributed to construction project workers, with respondents being the project managers to workers. Furthermore, the collected questionnaire data was analyzed using BIM SPSS and the process decision program chart method. The results of the analysis show that the implementation of warehouse construction projects, especially in column and beam structure work, has a percentage of 76%, and in-floor plate work has a percentage of 72%. So that quality control is carried out effectively and level risk at a medium risk level.
Factors Affecting Project Performance and Project Control Measures for Road Construction Projects at PT. X Iriene Dewi Kristiani; Michella Beatrix; Mochamad Firmansyah
G-Tech: Jurnal Teknologi Terapan Vol 10 No 4 (2026): G-Tech, Vol. 10 No. 4 October 2026
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70609/gtech.v10i4.11336

Abstract

The performance of construction projects is a key factor in the success of modern infrastructure development, particularly in achieving cost, quality, and schedule targets. Road improvement projects at PT X face operational challenges, including delays in the delivery of prefabricated materials and extreme weather conditions, which may reduce daily work productivity. This study aims to identify the dominant factors affecting project performance, determine their relative importance using the Relative Importance Index (RII) method, and formulate appropriate control strategies. A quantitative approach was employed using questionnaires distributed to 30 project personnel, of which 28 valid responses were returned and analyzed. The questionnaire consisted of 15 variables related to factors affecting project performance. The RII values were classified into three importance levels: high, moderate, and low. Although three classification levels were used, the results showed that the analyzed variables fell only into the high and moderate categories. The two most dominant factors were the suboptimal internal quality management system, with an RII of 0.700, and the lack of coordination among parties in quality control, with an RII of 0.686. The proposed control strategies include conducting periodic quality audits, assigning dedicated supervisors at critical project stages, and strengthening integrated materials supply chain management. These strategies are expected to improve project implementation efficiency at PT X and provide a useful reference for future road infrastructure projects.
Challenges and Barriers to the Implementation of the Last Planner System in Construction Projects David Erland Aric Alfreda; Michella Beatrix
G-Tech: Jurnal Teknologi Terapan Vol 10 No 4 (2026): G-Tech, Vol. 10 No. 4 October 2026
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70609/gtech.v10i4.11348

Abstract

Construction projects are highly complex and uncertain, necessitating a planning system that enhances the reliability of project execution. One approach is the Last Planner System (LPS); however, its implementation still faces various challenges. This study investigates the extent to which Implementation Challenges and Barriers influence the Implementation of the Last Planner System among construction service providers. This study used a quantitative approach and collected primary data through a questionnaire distributed to 41 respondents. Before use, the researchers tested the instrument for validity and reliability. The study analyzed the data using IBM SPSS Statistics. The test results showed that all 23 statement items were valid and reliable, with Cronbach’s Alpha values of 0.962 for Variable X and 0.964 for Variable Y, respectively. Furthermore, challenges and obstacles positively and significantly influenced the implementation of LPS. This is evident from the path coefficient value of 0.454 with a p-value of 0.038 (p < 0.05), as well as a t-statistic value of 2.142 that exceeds the critical value. The R² value was recorded at 0.206. Thus, the Challenges and Barriers factor explains 20.6% of the variation in the LPS Implementation factor; the factors in this study do not account for the remaining 79.4%. These findings suggest focusing on management commitment, staff understanding, coordination, and team involvement to support more effective LPS implementation.
Barrier Factors to Smart Construction in the Gerbangkertosusila Metropolitan Area Using the Analytical Hierarchy Process (AHP) Method Moch Raffli Trio Romadhoni; Michella Beatrix
G-Tech: Jurnal Teknologi Terapan Vol 10 No 4 (2026): G-Tech, Vol. 10 No. 4 October 2026
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70609/gtech.v10i4.11423

Abstract

The shift toward Construction 5.0 is driving the construction sector to adopt the concept of Smart Construction. However, adoption in the Gerbangkertosusila (GKS) Metropolitan Area remains limited by structural barriers that have not been systematically ranked in previous studies. This study identifies and prioritizes the main inhibiting factors—Cost (X1), Labor (X2), and Government (X3)—using the Analytical Hierarchy Process (AHP). Primary data were collected through purposive sampling based on specific criteria, using pairwise comparison questionnaires from 61 expert respondents from small, medium, and large construction companies in Gresik, Bangkalan, Mojokerto, Surabaya, Sidoarjo, and Lamongan. The consistency ratios across all criteria (CR < 0.10) confirm the consistency of the respondents' judgments, indicating that the judgments are consistent enough to be processed. The results show that the Labor factor ranks first as the main barrier (weight 0.434/43.4%), driven mainly by Resistance to Change/Old Work Habits (X2.2) (weight 0.164), followed by Cost (0.331/33.1%) and Labor (0.235/23.5%). This study provides empirical evidence and a prioritized barrier framework specific to the Gerbangkertosusila Metropolitan Area, offering practical guidance for policymakers to focus on labor in order to strengthen human resource capacity, which can allocate resources more strategically in accelerating the adoption of Smart Construction.
TANTANGAN DAN HAMBATAN TERHADAP IMPLEMENTASI LEAN CONSTRUCTION PADA PROYEK KONSTRUKSI : CHALLENGES AND OBSTACLES TO THE IMPLEMENTATION OF LEAN CONSTRUCTION IN CONSTRUCTION PROJECTS Stefania Sombo Djata; Michella Beatrix
Jurnal Teknik Sipil : Rancang Bangun Vol. 12 No. 02 (2026): Oktoer 2026
Publisher : Universitas Muhammadiyah Sorong

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Proyek konstruksi menghadapi pemborosan sumber daya yang dapat menghambat efisiensi pelaksanaan. Penelitian ini menganalisis hubungan antara persepsi tantangan dan hambatan dengan faktor implementasi lean construction pada tenaga profesional jasa konstruksi di Surabaya. Penelitian menggunakan survei kuantitatif cross-sectional. Kuesioner disebarkan kepada 88 profesional yang ditetapkan berdasarkan kriteria jabatan dan pengalaman proyek, dan 41 kuesioner lengkap dianalisis (tingkat pengembalian 46,6%). Dua konstruk, yaitu Faktor Implementasi Lean Construction (X) dan Tantangan dan Hambatan (Y), masing-masing diukur menggunakan tujuh butir skala Likert. Uji korelasi butir dan reliabilitas dilakukan dengan SPSS, dilanjutkan regresi linier sederhana dengan Y sebagai prediktor dan X sebagai respons. Seluruh 14 butir memiliki korelasi di atas nilai acuan 0,308. Nilai Cronbach’s Alpha sebesar 0,867 pada X dan 0,934 pada Y. Persamaan regresi yang diperoleh adalah X = 18,990 + 0,320Y, dengan R² = 0,169; uji koefisien menunjukkan t = 2,815 dan p = 0,008. Skor persepsi hambatan yang lebih tinggi berasosiasi dengan skor implementasi lean yang lebih tinggi, tetapi model hanya menjelaskan 16,9% variasi X. Hubungan ini bersifat korelasional, bukan bukti sebab-akibat. Korelasi butir tertinggi pada Y7 (0,911) tidak membuktikan bahwa Y7 merupakan hambatan paling dominan. Temuan dibatasi oleh jumlah respons dan potensi bias pengukuran.
Co-Authors Abdul Jawad Aditya Pradana, Aditya Aditya Yudhistira Adzim, M. Fatkhul Affrilia Khusnul Khotimah Affrilia Khusnul Khotimah Alifiandi Varian Jaya Anggraeni, Kharisma Dewi Ardiansyah, Ilmam Ari Wibowo Ari Wibowo Arifin, Moch.Ali Assidiqi, Widinanta Emir Athallah Prawira Bima Nursandah Bantot Sutriono Bantot Sutriono, Bantot Cristina Widya Ningrum David Erland Aric Alfreda Dew Pertiwi Dewi Pertiwi Dimas Febrianto Pratama Dwijayanto, Pebru Fahreza Irghi Budi Saputra Fatmawati, Laily Endah Fatmawati, Laily Endah Firmansyah, Mochamad FIRMANSYAH, MOCHAMMAD Gede Sarya Gede Sarya, Gede Herry Widhiarto, Herry Indirani, Dwi Novita Intan Nur Anggrayni Iriene Dewi Kristiani Jamila, Rika Lathifia Qolbina Lintang Sinipat M. Roudlloh Nur Kusuma putra Mahendra, Reyga Aditya Malik, Ariansyah Maria Fransiska Trinity Juraman Masca Indra Triana Masca Indra Triana Mathias, Leonardo Milo, Febriyanti Moch Raffli Trio Romadhoni Mochamad Firmansyah Mochamad Firmansyah Mohammad Rizal Mantovani Mubin, Muhammad Fadhul Muhammad Fa&#039;is Hidayatulloh Muhammad Rafli Nurabidin Muhammad Rizky Ashar Nadlif, Dimas Amrun Nainggolan, Boyke Mangaratua Nalindri, Intan Rizqi Ninda Qurmaulia Dhani Ninda Qurmaulia Dhani Nurani Hartatik Nurul Rochmah Nurul Rochmah Oetomo, Wateno Permana, Alung Nanda Puspitaningrum, Hilda Putra, Fanji Indrajaya Putri Suci Mawariza Ramadhina, Wandasari Reyga Aditya Mahendra Riyanti, Intan Yuli Rosyid, Rizal Saves, Faradlillah Stefania Sombo Djata Sulistyo, Wanda Ardhani Suryanto, Kelik Tia Herlina Sugiharto Tiara Retnali Putri Angguningtyas Wahyu Tri Sutrisno Wateno Oetomo Wateno Oetomo Yahya, Fandy Ahmad Amiruddin Yohanes Usman Nandyanto Yohanes Usman Nandyanto Yohanes Usman Nandyanto Yulianto, M Rizky Eko Zahroh, Alyatus