Claim Missing Document
Check
Articles

Found 34 Documents
Search

Evaluasi Pelaksanaan Dan Produktivitas Alat-Alat Berat Terhadap Waktu Pelaksanaan Proyek Pembangunan Jalan Ruas Prambanan-Gayamharjo Segmen B6 Tahun Anggaran 2024 Nugroho Wisudawantoro; Muhammad Nur Sahid; Tsulis Iqbal Khairul Amar; Budi Priyanto
Prosiding Seminar Nasional Teknik Sipil UMS 2026: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pelaksanaan proyek Jalan Ruas Prambanan-Gayamharjo segmen B6 belum sesuai rencana, dengan deviasi pada pekerjaan galian 21%, timbunan -22%, struktur beton 16%, dan lapis fondasi agregat kelas A -30%. Penelitian ini bertujuan mengevaluasi kesesuaian rencana dan realisasi serta menganalisis produktivitas alat berat di lapangan. Metode yang digunakan berupa analisis data primer dan sekunder dengan membandingkan produktivitas rencana dan aktual serta mengidentifikasi faktor-faktor yang mempengaruhi. Hasil menunjukkan produktivitas aktual lebih rendah akibat kondisi medan, cuaca, dan waktu kerja yang kurang efektif. Optimalisasi penggunaan dan kombinasi alat berat serta peningkatan manajemen pelaksanaan diperlukan agar progres pekerjaan dapat ditingkatkan dan target proyek tetap tercapai.
Kajian Kebutuhan untuk Meningkatkan Pertumbuhan dan Perencanaan Investasi Pembangunan Ruko Muhammad Syamsuddin Allamsyah; Muh. Nur Sahid; Budi Priyanto; Tsulis Iqbal Khairul Amar
Prosiding Seminar Nasional Teknik Sipil UMS 2026: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kelurahan Pandeyan, Kecamatan Grogol, merupakan kawasan strategis yang memiliki potensi tinggi untuk pengembangan ruko, namun belum didukung oleh kajian kelayakan investasi yang komprehensif. Penelitian ini bertujuan untuk menganalisis kebutuhan pasar ruko, menghitung total rencana anggaran biaya investasi, serta menilai kelayakan ekonomi pembangunan ruko di wilayah tersebut. Metode penelitian yang digunakan adalah metode kuantitatif dengan pengumpulan data primer melalui kuesioner dan wawancara, serta data sekunder dari instansi terkait. Analisis kebutuhan pasar dilakukan menggunakan uji kecukupan data, uji validitas, uji reliabilitas, dan uji korelasi dengan bantuan perangkat lunak SPSS. Kajian ekonomi dianalisis menggunakan indikator NPV, IRR, PP, ROI, BEP, BCR, dan IP. Hasil penelitian menunjukkan bahwa kebutuhan pasar ruko didominasi oleh ruko tipe 1 (150/75 m²) sebesar 70% dan tipe 2 (288/96 m²) sebesar 30%. Total biaya investasi yang dibutuhkan untuk pembangunan kawasan ruko sebesar Rp15.501.492.267,31. Hasil analisis kelayakan ekonomi menunjukkan nilai NPV sebesar Rp1.414.311.729,40 yang bernilai positif, IRR sebesar 18,33% per tahun, PP selama 23,72 bulan, dan ROI sebesar 48,89% per tahun. Titik impas proyek tercapai pada penjualan 11 unit ruko, dengan BCR sebesar 1,10 serta IP sebesar 1,08-1,10 yang lebih besar dari satu. Berdasarkan seluruh indikator tersebut, proyek pembangunan ruko di Kelurahan Pandeyan dinyatakan layak dan menguntungkan secara finansial serta direkomendasikan untuk direalisasikan.
Life Cycle Assessment of Reinforced Concrete Beam Work for Environmental Hotspot Identification and Mitigation Tsulis Iq'bal Khairul Amar; Alfia Magfirona; Nabil Belantara Kusuma; Aditya Restu Hapriyanto
Jurnal Linears Vol. 9 No. 2 (2026): Jurnal LINEARS
Publisher : Universitas Muhammadiyah Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26618/wvfqy095

Abstract

Reinforced concrete structural work requires substantial materials, energy, and transportation, which may generate environmental burdens throughout construction-related processes. This study identifies environmental hotspots in reinforced-concrete beam work and establishes mitigation priorities using Life Cycle Assessment (LCA). A case study was conducted on Project X in Magelang Regency by aggregating two beam groups into one beam-work system comprising 1,935.78 kg of reinforcing steel, 42.805 m² of formwork, and 4.290 m³ of ready-mix concrete. The functional unit was defined as 1 m³ of installed reinforced-concrete beam work, while the system boundary covered material production, transportation to the construction site, and construction activities. Modelling used SimaPro-derived inventory data and ecoinvent datasets with ReCiPe 2008 Midpoint (H) v1.13. The climate-change impact was approximately 5.62 × 10³ kg CO₂ eq, equivalent to about 1.31 × 10³ kg CO₂ eq/m³. Reinforcing steel was the principal hotspot, contributing approximately 69.6%, followed by cement at 21.5% and plywood at 4.3%. Sensitivity analyses of concrete composition, steel representation, formwork reuse, and transportation confirmed that reinforcing steel remained the dominant hotspot. Literature-based validation indicates that mitigation should prioritize reinforcement efficiency, fabrication-waste reduction, lower-impact steel procurement, cement efficiency, formwork reuse, and logistics optimization.      
Analisis Tingkat Risiko Bencana Kebakaran di Kecamatan Demak Menggunakan Metode Analytical Hierarchy Process (AHP) Syifa' Aulia Ratna Dewi; Budi Priyanto; Tsulis Iq'bal Khairul Amar; Syakir Maghfuri
Jurnal Teknik Sipil Vol 22 No 2 (2026): Jurnal Teknik Sipil
Publisher : Universitas Kristen Maranatha

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28932/jts.v22i2.12419

Abstract

Demak District in Demak Regency is a city central area that has a high number of fire incidents compared to other districts. Many causes of fires occur due to electrical short circuits, gas leaks, and illegal waste burning. It is necessary to create a map of the fire risk level of Demak District as one of the efforts to overcome fire disasters. There are three parameters in the process of determining the level of fire risk, namely hazard, vulnerability and capacity. Data processing is carried out using the Analytical Hierarchy Process (AHP) method to determine the weight of each variable and utilizes ArcGIS software to create the map by using Overlay tools. Based on the analysis, the variable with the highest weight of each parameter namely the variable of open fire use from the hazard parameter with a weight of 63.33%, building density from the vulnerability with a weight of 49.09%, and fire training and outreach from the capacity with a weight of 61.94%. From the results of data processing on hazard, vulnerability, and capacity parameters, the fire risk level in Demak District shows that there is 1 high-risk area, namely Mulyorejo Village, 8 moderate-risk villages/sub-districts, and 10 other villages with low risk. Therefore, Demak District needs the design or improvement of regional and urban spatial planning systems, as well as the need for the addition of hydrant points or water sources is very important for fire prevention and handling.