ANALISIS PENERAPAN RE – ENGINEERING PADA PROYEK JARINGAN IRIGASI SALURAN SEKUNDER (STUDI KASUS: PROYEK REHABILITASI D.I GLAPAN TIMUR) Dedi Tri Setiawan; Kartono Wibowo; Moh. Faiqun Ni’am
Journal of Scientech Research and Development Vol 8 No 2 (2026): JSRD, December 2026
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v8i2.1687

Abstract

Sistem irigasi yang baik merupakan syarat mutlak sebuah negara untuk menjaga sistem pangan nasional yang kuat. Sistem irigasi merupakan usaha yang dilakukan agar lahan pertanian dapat dialiri air dengan menerapkan bangunan serta jaringan saluran buatan. Suatu proyek dikategorikan sukses apabila tepat biaya, tepat mutu, dan tepat waktu. Ketiga kendala tersebut merupakan tolak ukur keberhasilan suatu proyek konstruksi (Imam, 2021). Untuk meminimalisir resiko kegagalan, perlu dilakukan beberapa alternatif yang dibuat sebagai dasar melaksanakan suatu kajian bersifat tidak mengoreksi perhitungan dan mencari kesalahan yang dibuat oleh perencana, tetapi mengarah untuk lebih menghemat biaya dan waktu tanpa mengurangi kualitas bangunan, sehingga penerapan rekayasa ulang dapat digunakan sebagai opsi dalam permasalahan tersebut (Noviyanti, 2021). Dalam penelitian ini menggunakan metode kuantitatif yaitu data-data yang digunakan dalam bentuk sesuatu yang dapat dihitung dengan memperhatikan pengumpulan dan analisis data dalam bentuk numerik. Metode pengumpulan data berupa data primer dan data sekunder. Kemudian dilakukan perhitungan analisis terkait dengan durasi pekerjaan dan biaya yang diperlukan untuk menyelesaikan pekerjaan sehingga dapat ditentukan metode yang efektif dan efisien. Pada metode pekerjaan kisdam jumbo bag menghabiskan biaya yang lebih tinggi daripada metode kisdam portadam, tetapi waktu pekerjaan kisdam jumbo bag lebih singkat daripada metode kisdam portadam. Hal ini disebabkan karena proses pengisian pasir ke dalam karung dilakukan di area kering dadan proses perpindahan material kisdam jumbo bag menggunakan excavator. Menghitung Rencana Anggaran Biaya (RAB) baik menggunakan kisdam jumbo bag maupun kisdam portadam dibuat berdasarkan volume kegiatan yang akan dilaksanakan dikalikan dengan analisa harga satuan pekerjaan yang ada, baik analisa dari Kementrian Pekerjaan Umum (Kemen PU) maupun dari SNI tahun 2020. Waktu pelaksanaan pekerjaan kisdam jumbo bag berdasarkan hasil analisa dalam penelitian ini memiliki waktu yang lebih singkat dibandingkan apabila pelaksanaan pekerjaan kisdam menggunakan kisdam portadam. Pekerjaan kisdam yang paling efektif pada pekerjaan saluran irigasi DI Glampan Timur adalah kisdam jumbo bag. Meski pekerjaan kisdam jumbo bag dari segi analisa biaya lebih mahal daripada kisdam portadam tetapi berdasarkan analisa waktu kisdam jumbo bag lebih cepat dibandingkan dengan kisdam portadam.
Analisis Optimalisasi Waktu dan Biaya Menggunakan Metode Gabungan Crashing-Overlapping pada Proyek Jaringan Utilitas Kawasan Industri Terpadu Batang Wahyu Hadi Utami; Kartono Wibowo; Abdul Rochim
Jurnal Teknik Sipil Vol. 19 No. 1 (2026): Juni 2026
Publisher : Faculty Of Engineering University 17 August 1945 Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56444/jts.v19i1.3699

Abstract

Keterlambatan proyek konstruksi masih menjadi permasalahan dominan dalam industri konstruksi, yang secara signifikan berkontribusi terhadap peningkatan biaya tidak langsung, penurunan produktivitas, serta potensi klaim kontraktual. Pada proyek infrastruktur utilitas, seperti jaringan air bersih dan air limbah, kompleksitas koordinasi antar aktivitas serta keterbatasan ruang kerja memperbesar risiko keterlambatan dibandingkan proyek konvensional. Penelitian ini bertujuan untuk: (1) menganalisis durasi dan biaya proyek pada kondisi normal,(2) mengevaluasi efektivitas metode crashing, (3) mengevaluasi metode overlapping, dan (4) menentukan alternatif percepatan yang paling optimal berdasarkan analisis time–cost trade-off. Analisis dilakukan melalui identifikasi aktivitas pada jalur kritis menggunakan Precedence Diagram Method (PDM), yang kemudian dilanjutkan dengan simulasi percepatan pada aktivitas kritis tersebut. Hasil penelitian menunjukkan bahwa durasi proyek pada kondisi normal adalah 180 hari dengan total biaya sebesar Rp50.630.500.000,00. Penerapan metode crashing (lembur 3 jam dan tambahan 15 tenaga kerja) mempercepat durasi menjadi 133 hari dengan efisiensi biaya sebesar 1,92%. Metode overlapping mempercepat durasi menjadi 167 hari dengan efisiensi biaya 0,60%. Alternatif paling optimal diperoleh melalui metode gabungan crashing dan overlapping yang mampu mereduksi durasi menjadi 120 hari (lebih cepat 60 hari) dan menurunkan total biaya menjadi Rp49.354.711.414,95 atau hemat sebesar 2,52% dibandingkan kondisi normal. Penelitian ini menyimpulkan bahwa strategi gabungan merupakan metode paling efisien dalam mengoptimalkan waktu dan biaya pada proyek infrastruktur utilitas kawasan industri.
ANALISIS PERBANDINGAN EFISIENSI SISTEM RUSPIN DAN METODE KONVENSIONAL PADA PEMBANGUNAN RUMAH BERBASIS KOMUNITAS DAN SWADAYA DI KABUPATEN BREBES Irfanuddin Irfanuddin; Kartono Wibowo; Soedarsono Soedarsono
Jurnal Teknik Indonesia Vol 7, No 2 (2026): JTI (Jurnal Teknik Indonesia)
Publisher : Universitas Darul Ulum Islamic Centre Sudirman GUPPI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61689/jti.v7i2.1250

Abstract

This study aims to analyze the efficiency level of the Instant Panel Superior House System (RUSPIN) and conventional construction methods in house construction and to determine the efficiency differences between the two methods in terms of cost, time, work quality, labor productivity, and ease of implementation. The study employed a quantitative comparative approach involving 80 respondents, consisting of 40 respondents from the RUSPIN group and 40 respondents from the conventional group. Data were collected using a Likert-scale questionnaire and analyzed through descriptive analysis, validity testing, reliability testing, Shapiro–Wilk normality testing, and the Mann–Whitney U test. The descriptive analysis showed that the RUSPIN system had a higher efficiency level than the conventional method for all research variables, namely cost efficiency (4.4000; 3.2375), time efficiency (4.4375; 3.2875), work quality (4.1525; 3.9062), labor productivity (4.4250; 3.8563), and ease of implementation (4.4812; 2.5000). The Mann–Whitney U test results indicated that all variables had Asymp. Sig. (2-tailed) values < 0.001, indicating significant differences between the RUSPIN system and conventional construction methods. The mean rank values of the RUSPIN group were higher than those of the conventional group for all research variables. Based on the findings, it can be concluded that the RUSPIN system is descriptively and statistically more efficient than conventional construction methods in terms of cost, time, work quality, labor productivity, and ease of implementation in house construction. Therefore, the RUSPIN system has the potential to become a more effective and efficient alternative construction method for public housing development.
SISTEM PENDUKUNG KEPUTUSAN PENILAIAN KINERJA PROYEK KONSTRUKSI DENGAN METODE ANALYTICAL HIERARCHY PROSES (AHP) Muhammad Rizki Ashari; Kartono Wibowo; Idi Namara
Structure Vol. 8 No. 2 (2026): STRUCTURE (JURNAL SIPIL)
Publisher : University of Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/87ty7257

Abstract

Pengukuran kinerja proyek konstruksi yang semakin kompleks menuntut evaluasi komprehensif yang tidak hanya berfokus pada biaya, waktu, dan mutu, tetapi juga mengintegrasikan aspek Keselamatan dan Kesehatan Kerja (K3). Penelitian ini bertujuan untuk merancang sistem pendukung keputusan penilaian kinerja proyek pada tahap pelaksanaan menggunakan metode Analytical Hierarchy Process (AHP) guna menentukan bobot prioritas dari Indikator Kinerja Kunci (KPI). Penelitian berlokasi di DKI Jakarta dengan melibatkan 20 ahli konstruksi sebagai responden. KPI disaring melalui metode Delphi, kemudian dievaluasi menggunakan kuesioner perbandingan berpasangan berskala Saaty. Hasil perhitungan bobot AHP menunjukkan prioritas kriteria berturut-turut: Biaya sebesar 37,16%, Waktu 29,28%, Mutu 20,53%, dan K3 13,03%. Seluruh hasil analisis menghasilkan nilai Consistency Ratio (CR) ≤ 0,1, yang membuktikan bahwa penilaian para pakar sangat konsisten dan logis. Sebagai kesimpulan, bobot KPI yang dihasilkan terbukti valid dan siap diimplementasikan ke dalam basis data sistem terkomputerisasi untuk mendukung pengambilan keputusan manajerial yang lebih proaktif dan terukur.Kata kunci:  Kinerja Proyek, KPI, Analytical Hierarchy Process (AHP), Sistem Pendukung Keputusan, Konstruksi
PERAN KEPEMIMPINAN DAN SISTEM MANAJEMEN MUTU LSP TERHADAP KEPERCAYAAN DAN PERSEPSI PERTUMBUHAN SERTIFIKASI KOMPETENSI KONSTRUKSI Sutoyo Hutagalung; Kartono Wibowo; Desiderius Viby Indrayana
Structure Vol. 8 No. 2 (2026): STRUCTURE (JURNAL SIPIL)
Publisher : University of Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/y9xd9749

Abstract

Penelitian ini menganalisis pengaruh efektivitas kepemimpinan dan efektivitas sistem manajemen mutu Lembaga Sertifikasi Profesi (LSP) terhadap kepercayaan pemangku kepentingan dan persepsi pertumbuhan aktivitas sertifikasi kompetensi konstruksi. Penelitian menggunakan desain kuantitatif eksplanatori dengan data survei dari 70 responden yang memenuhi kriteria dan data tahunan jumlah Sertifikat Kompetensi Kerja (SKK) konstruksi yang bersumber dari LPJK tahun 2021-2025. Hubungan struktural diuji menggunakan PLS-SEM dengan bootstrap 5.000 subsampel, sedangkan data jumlah SKK dianalisis secara deskriptif. Efektivitas kepemimpinan berpengaruh signifikan terhadap kepercayaan pemangku kepentingan (β=0,459; p<0,001) dan persepsi pertumbuhan sertifikasi (β=0,368; p=0,011). Efektivitas sistem manajemen mutu berpengaruh signifikan terhadap kepercayaan (β=0,331; p=0,001), tetapi pengaruh langsungnya terhadap persepsi pertumbuhan sertifikasi belum signifikan pada taraf 5% (β=0,249; p=0,055). Kepercayaan tidak berpengaruh signifikan terhadap persepsi pertumbuhan sertifikasi dan tidak memediasi kedua hubungan tersebut. Data LPJK menunjukkan jumlah SKK meningkat dari 2.791 pada 2021 menjadi 247.136 pada 2023, kemudian menurun menjadi 237.189 pada 2024 dan 207.393 pada 2025. Kebaruan penelitian terletak pada integrasi kepemimpinan, sistem manajemen mutu, kepercayaan, dan persepsi pertumbuhan sertifikasi dalam satu model struktural yang dikontekstualisasikan dengan tren aktual jumlah SKK tahunan.