PENERAPAN VALUE ENGINEERING PADA PEKERJAAN PONDASI PROYEK REHAB PASAR PAGI PROVINSI KALIMANTAN TIMUR A. Joni Patila; Kartono Wibowo; Faiqun Ni'am
Journal of Innovation Research and Knowledge Vol. 4 No. 8: Januari 2025
Publisher : Bajang Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53625/jirk.v4i8.9491

Abstract

Pasar Pagi Samarinda, located in Gajah Mada, Samarinda, East Kalimantan, is a staple food market that is planned to be upgraded to a Type A market through a development project outlined in the Detail Engineering Design (DED). According to the DED document prepared by the consultant, the total project value is estimated to be IDR 364,459,686,000. To improve financing efficiency while maintaining construction quality, a Value Engineering (VE) analysis is required. The goal of Value Engineering is to analyze the construction design to achieve the desired function at a lower cost without compromising quality. This study aims to identify design components that can be replaced with more cost-effective alternatives while still being effective. The research method used is descriptive, both qualitative and quantitative, with analysis stages according to Value Engineering standards. The first stage involves gathering information about the initial project design. Next, a functional analysis is carried out to determine the needs of each component. During the creativity stage, alternative, more cost-efficient designs are proposed. The evaluation phase compares the alternatives based on cost and benefits, and finally, the recommendation phase provides the most cost-efficient design solution. The results show that replacing the bored pile foundation design with a pile foundation can significantly reduce construction costs. Using the pile foundation reduces the total project cost to IDR 379,536,168,000, lower than the initial design with a bored pile foundation valued at IDR 371,486,210,000. The cost savings of IDR 8,049,958,000, or about 2.12% of the total project value, indicate that the pile foundation alternative is an effective solution for reducing costs without compromising the construction quality of Pasar Pagi Samarinda
Analisis Tenaga Kerja dalam Meningkatkan Produktivitas Pekerjaan pada Pembangunan Perumahan Palm Vista Residence Naimatul Fikriyah; Kartono Wibowo; Abdul Rochim
JURAL RISET RUMPUN ILMU TEKNIK Vol. 5 No. 1 (2026): April: Jurnal Riset Rumpun Ilmu Teknik
Publisher : Pusat riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jurritek.v5i1.8246

Abstract

Labor productivity is a critical factor in construction project success as it directly affects time, cost, and work quality. In the Palm Vista Residence housing development project, delays in ground floor structural works indicate suboptimal human resource performance. This study aims to analyze labor productivity levels, identify factors influencing productivity, and formulate strategies to improve productivity in sloof beams, columns, and floor slab works. The research employs a quantitative approach with descriptive-analytical methods through field observations, questionnaires, and interviews. Labor productivity is measured using the work sampling method and the Labour Utilization Rate (LUR), while influencing factors are analyzed using multiple linear regression. Strategy prioritization for productivity improvement is determined using the Analytical Hierarchy Process (AHP). The results show that labor productivity is at a moderate level and is significantly influenced by work experience, managerial aspects, and coordination and planning. The priority strategies include improving worker competence and strengthening project management practices. These findings are expected to provide practical guidance for construction labor management to enhance efficiency and ensure timely project completion.
Analisis Value Engineering Pekerjaan Atap Rumah Sakit Rodliyah Achid Moga Pemalang Hanida Isna Reza Pahlevi; Kartono Wibowo; Rachmat Mudiyono
Journal of Innovative and Creativity Vol. 6 No. 1 (2026)
Publisher : Fakultas Ilmu Pendidikan Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Roofing work plays an important role in hospital building construction because it affects costs, time, comfort, and structural performance. In the Muhammadiyah Rodliyah Achid Moga Pemalang Hospital Building Construction Project, the existing Kliplok zincalume roofing system was costly and had low productivity. This study aims to obtain more efficient roof design alternatives through Value Engineering (VE) based on SAVE International standards, including information gathering, FAST function analysis, creative stage, evaluation, and development. Two alternatives were developed: Alternative 1 uses SDS tapping screws with 3.0 mm CNP purlins, and Alternative 2 uses 2.3 mm CNP purlins. Both alternatives fulfill the main function with a value index >1.0. Alternative 1 provides the highest cost savings of 27.96%, increases productivity from 25 to 35 m²/person-day, and reduces the implementation duration by four days. A 10-year Life Cycle Cost analysis shows the lowest cost in Alternative 1. Value Engineering has proven to be effective in improving the cost efficiency and performance of hospital roof work.
MANAJEMEN PENGENDALIAN BIAYA DAN WAKTU PEMBANGUNAN GEDUNG (STUDI KASUS: PROYEK PEMBANGUNAN GEDUNG KANTOR PENGADILAN TINGGI AGAMA BALI) Arneta Fatika Sari; Kartono Wibowo; M. Faiqun Ni’am
Journal of Scientech Research and Development Vol 7 No 2 (2025): JSRD, December 2025
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v7i2.972

Abstract

Pengendalian proyek memiliki tiga factor penting yaotu, biaya, waktu dan mutu. Salah satu dari factor yang harus diperhatikan dalam memperhitungkan yaitu waktu dan biaya untuk dapat menjadikan proyek menjadi efektif dan efisien. Peneliti ini memiliki tujuan untuk mengukur kinerja proyek, membuat reschedule yang optimal, efektifitas waktu dan efisiensi biaya pada proyek Pembangunan Gedung Kantor Pengadilan Tinggi Agama Bali. Pada penelitian ini menggunakan Metode Earned Value Management (EVM) dan Crash Program dengan data yang dibutuhkan untuk Analisa yaitu data primer dan data sekunder. Data yang sudah terkumpul selanjutnya analisis kinerja waktu dan biaya proyek serta Analisa efisiensi biaya terhadap alternatif jam kerja lembur dan penambahan tenaga kerja. Hasil kinerja proyek pada Metode Earned Value Management (EVM) secara biaya surplus mulai pada Minggu ke 3 hingga minggu ke 37 dan minggu ke 42 hingga Minggu ke 47. Namun mengalami minus biaya pada minggu ke 38 hingg minggu ke 41, serta secara kinerja waktu penyelesaian sesuai dengan rencana time schedule. Sedangkan untuk reschedule dan Crash Program yang bisa dikatakan optimal, dengan memperhitungkan nilai penambahan tenaga kerja dengan efisiensi biaya sebesar 2,73% terhadap total cost dengan durasi normal dan efektifitas waktu selama 21 hari kalender lebih cepat dari rencana.
Evaluation of The Implementation of Quality Management, Costs and Time in The Process of Self-Managed Project Development (Study on House Building Projects Muhammadiyah University Semarang Hospital) M Martomo; Henny Pratiwi Adi; Kartono Wibowo
JACEE (Journal of Advanced Civil and Environmental Engineering) Vol 7, No 2 (2024): October
Publisher : Universitas Islam Sultan Agung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30659/jacee.7.2.184-198

Abstract

The construction of Universitas Muhammadiyah Semarang (Unimus) Hospital employs a self-management approach. During the construction phase, delays and a decline in building quality that did not align with the planning phase were observed. Therefore, a review of the management approach is necessary to ensure timely completion, maintained quality, and cost efficiency. This study evaluates the effectiveness of time, cost, and quality management in the construction project. The analysis method used is the interactive data analysis paradigm, involving data reduction, storage, and analysis using IBM SPSS 20. The analysis results indicate that time and cost management have been effective, with the construction work being completed within the set schedule and the costs not exceeding the Budget Plan. Quality management is rated very good with a score of 4.35, indicating that the construction process is strictly carried out according to specified materials and work procedures. Cost savings are also rated very good with a score of 3.89, indicating effective cost control. Time efficiency is rated good with a score of 4.06, showing that the project can run the schedule efficiently. Based on the research results, the researcher recommends enhancing leadership aspects and increasing active involvement of top management in supervision and strategic decision-making. This study also shows that self-management can promote transparency, efficiency, and high-quality outcomes in construction projects.
Rekayasa Ulang Metode Pekerjaan Pengecoran dan Bekisting untuk Meningkatkan Kinerja Waktu dan Biaya Proyek Gedung Bertingkat Dedi Achyadi; Kartono Wibowo; Soedarsono Soedarsono
JURAL RISET RUMPUN ILMU TEKNIK Vol. 5 No. 2 (2026): : Jurnal Riset Rumpun Ilmu Teknik
Publisher : Pusat riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jurritek.v5i2.8363

Abstract

Time delays and cost overruns remain major problems in building construction projects, particularly in concrete structural works that dominate project duration and cost. This study aims to evaluate the application of re-engineering in concrete structural work methods on the time and cost performance of multi-storey building projects. A quantitative approach using a case study method was employed through comparative analysis between the existing method and alternative methods. The analyzed alternatives include ready-mix concrete with Sika Viscocrete 8007 admixture and semi-system formwork as Alternative I, ready-mix concrete with system formwork as Alternative II, and ready-mix concrete with Sika Viscocrete 8007 admixture combined with system formwork as Alternative III. The results show that all alternatives perform better than the existing method with a duration of 243 days. Alternative I reduced the duration to 208 days with cost efficiency of IDR 55,781,730 or 0.214 percent. Alternative II reduced the duration to 203 days with cost efficiency of IDR 187,553,261 or 0.724 percent. Alternative III achieved the best performance with a duration of 168 days, accelerating 75 days and providing the highest cost efficiency of IDR 243,334,991 or 0.941 percent. The study concludes that re-engineering effectively improves project time and cost performance, with Alternative III as the optimal method.
Evaluasi dan Peningkatan Kinerja Proyek menggunakan Metode Earned Value Analysis dan Metode Crashing Rishi Mardiningsih; Shafira Cournnyus Dwi Arta Gracia; Eko Muliawan Satrio; Kartono Wibowo
JURAL RISET RUMPUN ILMU TEKNIK Vol. 5 No. 2 (2026): : Jurnal Riset Rumpun Ilmu Teknik
Publisher : Pusat riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jurritek.v5i2.9029

Abstract

Construction project control requires careful planning to avoid delays and cost overruns. This study aims to evaluate the performance of the CBT Laboratory Building construction project at the Faculty of Medicine, Wahid Hasyim University, Semarang, in terms of cost and time using the Earned Value Analysis (EVA) method, and to analyze acceleration alternatives using the crashing method. The method used is a quantitative approach with a case study, based on project data such as the Budget Plan (RAB), S-curve, and work progress reports. The analysis was carried out using the Earned Value Analysis (EVA) method to assess project performance in terms of cost and time through indicators such as CV, SV, CPI, and SPI. Furthermore, an acceleration analysis was conducted using the crashing method to determine the optimal alternative for overcoming project delays by considering time and cost efficiency. The results of the Earned Value Analysis indicate that the project experienced delays and cost overruns, as shown by SPI < 1 and CPI < 1. The estimated project completion time increased to 227 days, longer than the initial plan of 217 days, while the estimated final cost reached RP 5,451,241,064.85, exceeding the initial budget. Acceleration efforts using the crashing method show that adding adding labor is more efficient than working hours (overtime), resulting in a project duration of 212 days with lower costs of RP 5,658,221,364.08. Thus, the Earned Value Analysis method is effective for evaluating project performance, while crashing can be a solution for acceleration by considering time and cost efficiency.