Claim Missing Document
Check
Articles

Found 46 Documents
Search
Journal : Jurnal Teknik Sipil

ANALISIS KELAYAKAN EKONOMI PEMBANGUNAN JALAN KRUENG MANE - BUKETRATA DENGAN CONSUMER SURPLUS Amirullah Amirullah; Sofyan M. Saleh; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The national road in North Aceh District is very buzy, especially roads that pass through the Vital Project of Lhokseumawe and its surrounding areas are now called Special Economic Zones (SEZ) Lhokseumawe. Because it's built the way evasion from Krueng Mane to Buketrata along 32 Km, but this road  is not perfect yet, especially at the STA 14+750 to STA 21+400. The current reasearch aims to determine the value of time and the Vehicle Operating Costs (VOC); and economic feasibility in Benefit Cost Ratio (BCR), Net Present Value (NPV), and Economic Internal Rate of Return (EIRR) aspects. This study uses a productivity method to calculate the value of time, and the Pacific Consultant International method for calculating the VOC; and Bina Marga method was used to determine the economic feasibility in BCR, NPV, and EIRR aspects. The results of this research shown that   daily traffic volume of the annual average (LHRT) on alternative road obtained 9,583 vehicles /day in 2017; the difference in total time value was obtained Rp87,788.- /vehicle and the difference BOK is Rp3,289.- /vehicle; and economic feasibility of the alternative road construction in North Aceh Regency was obtained in 2026. EIRR’s value obtained was at a discount rate of 13.51%, this indicates that the alternative road construction was very feasible to develop with bank lending rates up to 13.51%.Abstract: The national road in North Aceh District is very buzy, especially roads that pass through the Vital Project of Lhokseumawe and its surrounding areas are now called Special Economic Zones (SEZ) Lhokseumawe. Because it's built the way evasion from Krueng Mane to Buketrata along 32 Km, but this road  is not perfect yet, especially at the STA 14+750 to STA 21+400. The current reasearch aims to determine the value of time and the Vehicle Operating Costs (VOC); and economic feasibility in Benefit Cost Ratio (BCR), Net Present Value (NPV), and Economic Internal Rate of Return (EIRR) aspects. This study uses a productivity method to calculate the value of time, and the Pacific Consultant International method for calculating the VOC; and Bina Marga method was used to determine the economic feasibility in BCR, NPV, and EIRR aspects. The results of this research shown that   daily traffic volume of the annual average (LHRT) on alternative road obtained 9,583 vehicles /day in 2017; the difference in total time value was obtained Rp87,788.- /vehicle and the difference BOK is Rp3,289.- /vehicle; and economic feasibility of the alternative road construction in North Aceh Regency was obtained in 2026. EIRR’s value obtained was at a discount rate of 13.51%, this indicates that the alternative road construction was very feasible to develop with bank lending rates up to 13.51%.
ANALISIS KELAYAKAN EKONOMI PADA PROYEK PEMBANGUNAN JALAN ALTERNATIF DI KOTA IDI PROVINSI ACEH Zubir Zubir; Sofyan M. Saleh; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 5, No 2 (2016): Volume 5, Nomor 2, Januari 2016
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Various efforts by the government in order to maintain the performance of the road in order to still be able to serve demand of the population that is increasingly larger. The effort could take the form improvement of road network and improvement in traffic management and system transportation and movement. In the regions outside of Java such as on the island of Sumatra, with a relatively low population density, the most common form of the actions carried out is the improvement of existing roads and construction of new road sections. Construction of alternative roads Idi city for the purpose to avoid the problem of congestion around the city idi, road construction has been started since 2010 with a length of 14.13 km, while the length of 13.35 km of existing roads. Construction will be implemented in 2017 to 2020, for 2015 is planned for completion at the stage of land acquisition.The purpose of this study was to evaluate of demand for an alternative way idi city based on the degree of saturation and predictive traffic flow. Calculating the Vehicle Operating Costs (VOC) and travel time savings. The results obtained for the evaluation of demand based on predictions of traffic that the vehicle growth rate reached 10,60 % every year, then the degree of saturation 2015 = 0,35, 2023 = 0,78, thus the alternative road Idi city is needed to be built in order to avoid capacity problems in the coming years on existing roads. Based on the evaluation of the benefits of saving Vehicle Operating Costs (VOC) of Rp 321 /veh/km for passenger cars, buses Rp. 2.017 /veh/km and trucks Rp. 1.925 /veh/km. Saving time value of Rp. 6.040 /veh, for vehicle passenger cars, Rp. 39.643 /veh, for buses, Rp. 4.303 /veh for trucks.Keywords : Evaluation of demand, degree of saturation, vehicle operating costsAbstrak: Berbagai usaha dilakukan pemerintah dalam rangka mempertahankan kinerja jalan agar tetap dapat melayani kebutuhan transportasi penduduk yang kian hari kian meningkat. Usaha tersebut bisa berbentuk perbaikan sistem jaringan jalan maupun perbaikan pada manajemen lalu lintas dan sistem perangkutan dan pergerakan. Pada wilayah-wilayah di luar pulau Jawa seperti di pulau Sumatera, dengan kepadatan penduduk yang relatif rendah maka bentuk tindakan yang paling umum dilakukan adalah dengan peningkatan jalan yang ada dan pembangunan ruas-ruas jalan baru. Pembangunan jalan alternatif kota Idi bertujuan untuk menghindari masalah kemacetan di sekitar kota idi, pembangunan jalan tersebut telah dimulai sejak tahun 2010 dengan panjang 14,13 Km, sedangkan panjang ruas jalan existing 13,35 Km.Konstruksi akan dilaksanakan pada tahun 2017 hingga tahun 2020, untuk tahun 2015 direncanakan selesai pada tahap pembebasan lahan.Tujuan penelitian ini untuk mengevaluasi kebutuhan jalan alternatif kota idi berdasarkan derajat kejenuhan, prediksi arus lalu lintas, menghitung Biaya Operasional Kendaraan (BOK) dan penghematan waktu perjalanan. Hasil penelitian yang diperoleh untuk evaluasi kebutuhan berdasarkan prediksi arus lalu lintas yaitu tingkat pertumbuhan kendaraan mencapai 10,60% per tahun, maka derajat kejenuhan pada tahun 2015 = 0,35, tahun 2023 = 0,78. Berdasarkan manfaat berupa penghematan Biaya Operasional Kendaraan (BOK) sebesar Rp 321 /kend/km untuk mobil penumpang, bus sebesar Rp. 2.017 /kend/km dan truk sebesar Rp. 1.925 /kend/km. Penghematan nilai waktu Rp.6.040/kend, untuk kendaraan mobil penumpang, Rp. 39.643 /kend, untuk kendaraan bus, Rp. 4.303 /kend untuk kendaraantruk.Kata kunci : Evaluasi kebutuhan, derajat kejenuhan, biaya operasional kendaraan
ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PEMILIHAN MODA MENUJU TEMPAT KERJA MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS Rahmad Saputra; Renni Anggraini; Muhammad Isya
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Transportation system serves to enhance the mobility of population and support economic growth in the region. The important role of transportation in providing the access for communities, it is necessary to study the transportation needs based on various criteria attached as well as alternative modes as the most appropriate by distance and easiness in reaching the destination. Although Jantho is the Capital of Aceh Besar District, which about 58 km from Banda Aceh, the workers of Jantho are preferred to live in Banda Aceh including employee of regional government. The objective of this study is to determine the ­perception of respondents, which is Jantho government employee, in transportation mode selection and factors influence respondent’s priorities in transportation mode selection. Questionnaire survey methods is used in this study and data will be processed and analyzed using the Analytic Hierarchy Process Methods (AHP) so it can determine the selected factors of each mode. The results showed that the factors influenced in mode selection to work are safety, comfort and travel time. For global mode selection, respondents would chose private car as a mode for work trips and followed by bus. Although the cost takes last ranks on the respondents priority, but the tendency to choose public transport as a means for work trip is high. Bus becomes superior in terms of safety and cost, also safety is essential for traveling in high-speed traffic in addition to other advantages in terms of cost.Abstrak: Sistem transportasi berfungsi untuk meningkatkan mobilitas penduduk serta mendukung pertumbuhan ekonomi pada suatu daerah. Pentingnya peranan transportasi dalam menyediakan akses bagi masyarakat, maka perlu dikaji kebutuhan transportasi jika ditinjau berdasarkan berbagai kriteria yang  menyertainya serta alternatif  moda apakah yang paling tepat berdasarkan jarak dan kemudahan untuk mencapai tujuan. Kota Jantho merupakan pusat pemerintahan Kabupaten Aceh Besar yang berjarak sekitar 58 KM dari Kota Banda Aceh. Walaupun merupakan ibu kota kabupaten, tetapi para pekerja di Kota Jantho lebih memilih untuk berdomisili di Kota Banda Aceh tanpa terkecuali para Pegawai Negeri Sipil Daerah. Tujuan dari penelitian ini adalah untuk mengetahui persepsi responden, yaitu Pegawai Negeri Sipil kota Jantho dalam pemilihan moda menuju tempat kerja dan untuk mengetahui faktor-faktor apa saja yang mempengaruhi prioritas responden dalam hal pemilihan moda. Penelitian ini menggunakan metode survei kuesioner, data akan diolah dan dianalisis dengan menggunakan metode Analytic Hierarchy Process (AHP) untuk mencari faktor terpilih dari masing-masing moda. Hasil penelitian menunjukkan bahwa faktor yang mempengaruhi pemilihan moda menuju tempat kerja adalah keamanan, kenyamanan dan waktu tempuh. Untuk pemilihan moda global, responden memilih mobil sebagai moda favorit untuk perjalanan kerja diikuti oleh bus kantor. Walaupun biaya menempati urutan terakhir dari prioritas responden, tetapi kecenderungan untuk memilih angkutan kantor sebagai sarana untuk perjalanan kerja termasuk tinggi. Bus kantor unggul dalam hal keamanan dan biaya, keamanan menjadi hal penting untuk perjalanan dengan lalu lintas berkecepatan tinggi disamping keunggulan lain dalam hal biaya.
ANALISIS KONDISI KEMANTAPAN JALAN DENGAN LALU LINTAS HARIAN RATA-RATA PADA JALAN ARTERI SEKUNDER Joly Srianty; Muhammad Isya; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Road as land transport insfrastructure is essential to provide a good traffic flow, and also to accelarate socio-economic growth within the region. Road damages faster than the design life often occur, especially in the arterial road. Rehabilitation and maintenance of  roads is an activity to maintain the stability of road condition until the end of serviaceability age as planned. This study aims to determine the stability condition of national road at arterial secondary network system in Banda Aceh and steadiness road condition relation with average daily traffic (ADT) in last 5 years period (2011-2015). The data used primary and secondary data obtained through road condition survey (RCS) and secondary data obtained from the institution national road planning and monitoring Aceh Province which are stability of roads and ADT data from 2011-2015. This study used descriptive method that comparing road stability condition data with ADT, while for road condition analyse refers to Bina Marga Methode with calculating Surface Distress Index (SDI) for Pavement road. The results of this study for road condition 2015 were in good condition with a value 100% solid, and for relation between steadiness with ADT known that the ADT increasing does not affect to steadiness road condition every year. Abstrak: Jalan merupakan prasarana angkutan darat yang sangat penting bagi kelancaran transportasi, dimana jalan dapat memperlancar pertumbuhan sosial ekonomi antar daerah. Kerusakan jalan lebih cepat dari umur rencana sering terjadi khususnya di jalan-jalan arteri. Rehabilitasi dan pemeliharaan jalan merupakan kegiatan yang dilakukan untuk mempertahankan kondisi jalan agar kondisi mantap jalan dapat terus dipertahankan hingga mencapai  umur layan sesuai yang direncanakan. Penelitian ini bertujuan untuk mengetahui kondisi kemantapan jalan nasional pada sistem jaringan arteri sekunder dalam kota Banda Aceh dan hubungan kondisi kemantapan jalan terhadap lalu lintas harian rata-rata (LHR) dalam kurun waktu 5 tahun terakhir (2011-2015). Data yang digunakan adalah data primer yang diperoleh dari Survei Kondisi Jalan dan data Sekunder diperoleh dari Instansi Perencanaan dan Pengawasan Jalan Nasional Provinsi Aceh yaitu data kemantapan jalan dan data LHR dari tahun 2011-2015. Metode yang digunakan dalam penelitian ini bersifat deskriptif yaitu membandingkan kondisi jalan dengan data LHR dan jenis penanganan sedangkan untuk analisis penilaian kondisi jalan mengacu pada metode Bina Marga dengan perhitungan Surface Distress Index (SDI) untuk jalan beraspal. Hasil penelitian ini adalah kondisi jalan pada tahun 2015 berada pada kondisi baik dengan nilai 100% mantap. Hubungan kondisi kemantapan jalan terhadap LHR diketahui bahwa LHR yang terus meningkat setiap tahunnya tidak mempengaruhi nilai kondisi mantap jalan yang tetap terjaga.
PEMODELAN KEBUTUHAN PERGERAKAN BERBASIS AKTIVITAS DARI KOMPLEK PERUMAHAN DI KECAMATAN DARUL IMARAH KABUPATEN ACEH BESAR Gumala Ashari; Renni Anggraini; Nurlely Nurlely
JURNAL TEKNIK SIPIL Vol 1, No 3 (2012): Volume 1, Nomor 2, Mei 2012
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Population growth to increase the demand for housing, urban and transportation facilities. The more increasing number of people residing in one area will the more problem occurr. This study aimed to obtain the activity-based models of trip generation and identify the factors that influence the trip by residential complex in the District of Darul Imarah which can be done by anticipated problem that will happen in the future. Primary survey conducted by filling out the questionnaire on 250 families that residing in the three residential areas, namely: Meusara Agung Residence, Rahmi Permai Residence and Aron Residence. The results of the questionnaire will be tabulated into independent dependent variable, and then analyzed by using SPSS-18 program. The equations of regression will used to model the rise of the trip based on the activities of the Darul Imarah District. The results of this study expected to obtain three models of trip activities, namely: mandatory activity  that consist of work activity (Y1) and school activity (Y2) with regression model equation : (Y1) = -0,133 + 0,108 X1 + 0,495 X3 + 0,061 X5 + 0,096 X6 + 0,328 X8 ; (Y2) = -0,125 + 0,656 X2 + 0,040 X5 + 0,279 X6,  maintenance Activity that consist of shopping activity (Y3) dan escorting (Y4) with regression equation : (Y3) =  0,267 + 0,480 X6 + 0,291 X9 ; (Y4) = 0,306 + 0,337 X6 + 0,230 X7 + 0,247 X5 + 0,124 X3 and discretionary activity that consist of happy Activity (Y5), activity of social visit (Y6), recreation  activity(Y7) with regression equation: (Y5) = -0,235 + 0,421 X6 + 0,335 X4 ; (Y6) = 0,268 + 0,410 X6 + 0,30 X8 + 0,778 X9 ; (Y7) = 0,571 + 0,571 X4 + 0,285 X6 + 0,369 X9.Keywords : trip demand modeling, mandatory activities, maintenance activities, discretionary activities.Abstrak: Pertambahan penduduk meningkatkan kebutuhan akan perumahan, sarana kota dan transportasi. Semakin banyaknya jumlah penduduk yang bertempat tinggal dalam suatu wilayah akan menimbulkan masalah baru. Penelitian ini bertujuan untuk mendapatkan model kebutuhan pergerakan berbasis aktivitas dan mengidentifikasi faktor-faktor yang mempengaruhi terjadinya pergerakan oleh penghuni komplek perumahan di Kecamatan Darul Imarah yang nantinya dapat dilakukan ramalan untuk mengantisipasi permasalahan yang akan terjadi dimasa yang akan datang. Survei primer dilakukan melalui pengisian kuesioner pada 250 keluarga yang bertempat tinggal di ketiga kawasan perumahan yaitu : Perumahan Meusara Agung, Perumahan Rahmi Permai dan Perumahan Arun. Hasil dari kuesioner ditabulasikan menjadi variabel bebas dan variabel terikat, kemudian dianalisis menggunakan program SPSS-18. Persamaan regresi digunakan untuk memodelkan kebutuhan pergerakan berdasarkan aktivitas pada komplek perumahan Kecamatan Darul Imarah. Hasil dari penelitian ini diharapkan diperoleh tiga kelompok model aktivitas pergerakan yaitu : aktivitas mandatory yang terdiri dari aktivitas bekerja (Y1) dan aktivitas sekolah (Y2) dengan persamaan model regresi : (Y1) = -0,133 + 0,108 X1 + 0,495 X3 + 0,061 X5 + 0,096 X6 + 0,328 X8 ; (Y2) = -0,125 + 0,656 X2 + 0,040 X5 + 0,279 X6,  aktivitas maintenance yang terdiri dari aktivitas belanja (Y3) dan escorting (Y4) dengan persamaan regresi : (Y3) =  0,267 + 0,480 X6 + 0,291 X9 ; (Y4) = 0,306 + 0,337 X6 + 0,230 X7 + 0,247 X5 + 0,124 X3 dan aktivitas discretionary yang terdiri dari aktivitas refresing (Y5), aktivitas kunjungan sosial (Y6), aktifias rekreasi (Y7) dengan persamaan regresi : (Y5) = -0,235 + 0,421 X6 + 0,335 X4 ; (Y6) = 0,268 + 0,410 X6 + 0,30 X8 + 0,778 X9 ; (Y7) = 0,571 + 0,571 X4 + 0,285 X6 + 0,369 X9.Kata kunci : Model kebutuhan pergerakan, aktivitas mandatory, aktivitas maintenance, aktivitas discretionary.
TINJAUAN BLACK SPOT JALAN NASIONAL LINTAS TIMUR PROVINSI ACEH Herman Herman; Sofyan M. Saleh; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 6, No 1 (2016): Volume 6, Nomor 1, September 2016
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The existence of national road status in east coast of Aceh Province plays important role in triggering evonomic growth in Aceh. However, there are myriads of challenges especially in North Aceh District corridor that somehow caused traffic accident. This study aimed to determine the characteristics and causes of traffic accidents by identifying and analyzing the treatment to reduce traffic accidents. The study was conducted on national road in East Coast Aceh Province traffic approximately near Kr. Mane bend, bend of Iskandar Muda Fertilizer company, and bend of Panton Labu Bridge. Results showed that the geometrical condition round the corner of Kr. Mane has type 2 lanes 2-way street which is undivided (2/2 UD) with a lane width of 2.0 x 3.5 m and shoulders width of 2.0 m. The cause of traffic accidents identified succesfully near the curve with a small radius. Furthermore, around the corner of the two roads into the village there are no such traffic lights and the distance of the poor in a corner because of some planted trees. Meanwhile, the bend of Iskandar Muda Fertilizer company has type 2 lanes 2-way street which is undivided (2/2 UD) with a lane width of 2.0 x 8.0 m and shoulders width of 0.5 m The cause of traffic accidents identified succesfully near the corner of the railway bridge and highway bridges. Additionally, lack of or lack of traffic signs and bend their driveway the village, and there are no traffic lights completed the traffice accident factors. Lastly, the corner of Panton Labu Bridge type of road has type 2 lanes 2-way street which is undivided (2/2 UD) with a lane width of 2.0 x 3.8 m and shoulders width of 2.0 m and the causes of traffic accidents is poor visibility on bends, the building closest to the road, 800 m from the intersection there is a bridge frame, the head of the bridge is only 20 m from the bend, the entrance to the village, banners attract attention and distract the driver, the vehicle parked haphazardly. This research is expected to provide information about the location of the accident-prone spots to reduce the risk of accidents.Keywords : traffic, accidents, geometric, bend, black spotAbstrak: Jalan nasional pada lintas timur memiliki nilai yang sangat strategis dalam mendukung perkembangan dan pertumbuhan ekonomi di Provinsi Aceh. Pada jalan nasional lintas timur di Kabupaten Aceh Utara terdapat beberapa lokasi yang menjadi lokasi titik rawan kecelakaan. Penelitian dilakukan pada ruas jalan nasional lintas timur yaitu pada tikungan Kr. Mane, tikungan depan Perusahaan Pupuk Iskandar Muda, tikungan Jembatan Panton Labu. Hasil dari penelitian bahwa kondisi geometrik di tikungan Kr. Mane mempunyai tipe jalan 2 lajur 2 arah tidak terbagi (2/2 UD) dengan lebar lajur 2,0 x 3,5 m dan lebar bahu 2,0 m dan faktor penyebab terjadinya kecelakaan lalu lintas yaitu adanya tikungan dengan radius kecil, di tikungan adanya dua jalan masuk ke desa, tidak ada lampu jalan dan jarak pandang buruk pada tikungan karena adanya pepohonan. Tikungan depan Perusahaan Pupuk Iskandar Muda mempunyai tipe jalan 2 lajur 2 arah tidak terbagi (2/2 UD) dengan lebar lajur 2,0 x 8,0 m dan lebar bahu 0,5 m dan faktor penyebab terjadinya kecelakaan lalu lintas yaitu tikungan dekat jembatan kereta api dan jembatan jalan raya, kurang atau minimnya rambu lalu lintas dan di tikungan adanya jalan masuk ke desa, dan tidak ada lampu jalan. Tikungan Jembatan Panton Labu mempunyai tipe jalan 2 lajur 2 arah tidak terbagi (2/2 UD) dengan lebar lajur 2,0 x 3,8 m dan lebar bahu 2,0 m dan faktor penyebab terjadinya kecelakaan lalu lintas yaitu jarak pandang buruk pada tikungan, bangunan dekat dengan jalan, 800 m dari simpang terdapat jembatan rangka, kepala jembatan hanya 20 m dari tikungan, adanya jalan masuk ke desa, spanduk yang menarik perhatian dan mengganggu konsentrasi pengendara, parkir kendaraan sembarangan. Penelitian ini diharapkan dapat memberikan informasi tentang lokasi titik rawan kecelakaan untuk mengurangi resiko kecelakaan.Kata kunci : lalu lintas, kecelakaan, geometrik, tikungan, black spot
EVALUASI KELAYAKAN EKONOMI PEMBANGUNAN FLYOVER SIMPANG SURABAYA - KOTA BANDA ACEH Ruslan Ruslan; Muhammad Isya; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 6, No 1 (2016): Volume 6, Nomor 1, September 2016
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Surabaya intersection is one of the intersections with traffic levels are quite large. The poor condition of the intersection marked by the performance value on the circumstances existing at the level of service is very bad. On this basis, the government will build a flyover along the 900 meters. The purpose of this study is to see how big the cost savings of time and vehicle operating costs after the flyover and the extent of its economic feasibility. The method used to calculate the economic feasibility is a Cost Benefit Analysis (BCA). As for calculating the Vehicle Operating Cost (VOC) used a model developed by Pacific Consultants International (PCI). Based on the results of economic evaluation of the flyover in the 25th (2040) already meet the standards of the economic feasibility with a discount rate of 15% obtained BCR value = 1.23, NPV = Rp41.031.699.871 and at a discount rate of 18% obtained value BCR = 0.96, NPV = Rp-6.502.646.207 while the IRR obtained at a discount rate of 17.5%. While the amount of savings BOK if passing a flyover of Rp1.883 / vehicles for passenger cars, Rp6.041 / vehicles to buses and Rp5.158 / vehicles to trucks. Saving time value if passing a flyover of Rp3.998 / vehicles for passenger cars, Rp39.675 / vehicles to buses and Rp4.134 / vehicles to trucks.Keywords: Vehicle Operating Cost, value of time, flyovers, economic feasibility, Surabaya intersection.Abstrak: Simpang Surabaya merupakan salah satu persimpangan dengan tingkat kepadatan lalu lintas yang cukup besar. Buruknya kondisi tersebut ditandai dengan nilai kinerja simpang pada keadaan eksisting berada pada tingkat pelayanan sangat buruk. Atas dasar ini maka pemerintah akan membangun flyover sepanjang 900 meter. Tujuan penelitian ini adalah untuk melihat seberapa besar penghematan biaya waktu dan biaya operasional kendaraan setelah pembangunan flyover dan sejauh mana kelayakan ekonominya. Metode yang digunakan untuk menghitung kelayakan ekonomi adalah Benefit Cost Analysis (BCA). Sementara untuk menghitung Biaya Operasi Kendaraan (BOK) digunakan model yang dikembangkan oleh Pacific Consultan Internationnal (PCI). Berdasarkan hasil penelitian evaluasi ekonomi terhadap pembangunan flyover pada tahun ke- 25 (tahun 2040) sudah memenuhi standar kelayakan ekonomi dengan discount rate 15% didapat nilai BCR=1,23, NPV=Rp41.031.699.871 dan pada discount rate 18% didapat nilai BCR=0,96, NPV=Rp-6.502.646.207 sementara nilai IRR diperoleh pada discount rate 17,5%. Sedangkan besaran penghematan BOK jika melewati flyover sebesar Rp1.883/kendaraan untuk mobil penumpang, Rp6.041/kendaraan untuk bus dan Rp5.158/kendaraan untuk truk. Penghematan nilai waktu jika melewati flyover sebesar Rp3.998/kendaraan untuk mobil penumpang, Rp39.675/kendaraan untuk bus dan Rp4.134/kendaraan untuk truk.Kata kunci : BOK, nilai waktu, flyover, kelayakan ekonomi, simpang surabaya.
KAJIAN NILAI WAKTU PERJALANAN UNTUK MOBIL PENUMPANG (STUDI KASUS JALAN TEUKU UMAR BANDA ACEH) Nazariani Nazariani; Renni Anggraini; Muhammad Isya
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Travel’s efficiency is the amount of money that had to be prepared alocated in order to economize one unit travel time. Reduction for travel time can change profit large enough. Therefore, it used efficiency approach to convert the profit into money. The observation is on Teuku Umar road Banda Aceh, start from Simpang Gunongan (KM.1+101) to Simpang 3 PU (KM.3+113). The purpose of this study was to evaluate vehicle operation cost (VOC) and value travel’s efficiency for light vehicle on Teuku Umar road. The methods that used to calculate travel’s efficiency is income approach method and running speed approach method. The result show that traffic volume at max for light vehicle (LV) from Simpang Gunongan to Simpang 3 PU direction is 1193 vehicle/hour, heavy vehicle (HV) is 13 vehicle/hour and motor cycle (MC) is 3438 vehicle/hour. The average speed for LV to direction head Simpang 3 PU is 37,09 km/hour. The VOC to LV for direction head Simpang 3 PU is Rp. 5.223/km. The travel’s efficiency that obtain from income approach method for partial population in Banda Aceh city is Rp. 24.018,11/hour/people and Rp. 35.346,74/hour/people to partial population in Aceh Besar regency. From running speed approach method obtain travel’s efficiency  for LV to direction head Simpang 3 PU is Rp. 52.928/vehicle/hour.Abstrak: Nilai waktu perjalanan adalah jumlah uang yang disiapkan seseorang untuk dibelanjakan agar menghemat satu unit waktu perjalanan. Pengurangan waktu perjalanan dapat mengubah porsi keuntungan yang cukup besar. Oleh karena itu, digunakan pendekatan nilai waktu untuk mengkonversi keuntungan tersebut dalam bentuk uang. Penelitian ini dilakukan pada ruas Jalan Teuku Umar Banda Aceh yang dimulai dari Simpang Gunongan (KM.1+101) s/d Simpang 3 PU (KM.3+113). Penelitian ini bertujuan untuk mengetahui nilai biaya operasional kendaraan (BOK) untuk mobil penumpang serta mengetahui nilai waktu perjalanan di ruas Jalan Teuku Umar. Metode yang digunakan untuk menghitung nilai waktu perjalanan adalah metode income approach dan running speed approach. Berdasarkan hasil pengolahan data diperoleh volume lalu-lintas puncak mobil penumpang (LV) untuk arah menuju Simpang 3 PU sebesar 1193 kend/jam, kendaraan berat (HV) sebesar 13 kend/jam dan sepeda motor (MC) sebesar 3438 kend/jam. Kecepatan rata-rata LV untuk arah menuju Simpang 3 PU diperoleh sebesar 37,09 km/jam. Nilai BOK untuk LV pada arah pengamatan menuju Simpang 3 PU sebesar Rp. 5.223/km. Nilai waktu perjalanan yang diperoleh dengan metode income approach untuk sebagian penduduk di Kota Banda Aceh yaitu Rp. 24.018,11/jam/orang dan Rp. 35.346,74/jam/orang untuk sebagian penduduk yang berdomisili di Kabupaten Aceh Besar. Adapun metode running speed approach menghasilkan nilai waktu perjalanan LV untuk arah menuju Simpang 3 PU sebesar Rp. 52.928/kend/jam.
ANALISIS KINERJA JALAN DAN KECEPATAN PERJALANAN KENDARAAN PADA JALAN POCUT BAREN KOTA BANDA ACEH Sofi Marlinda; Sofyan M. Saleh; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The region of Pocut Baren Street in Banda Aceh has varied land use along the street consisting of office, residential, shopping and school areas. The increase in traffic volume on Pocut Baren Street causes traffic congestion along the street and finally lead to decrease in vehicle speed which influence the increase in fuel consumption level. This study aimed to evaluate the road performance and journey speed of vehicle on Pocut Baren Street during peak hours. Data observation of traffic volume conducted to calculate the total of traffic that passed through the observational street by using the Indonesian Highway Capacity Manual (MKJI) 1997.  Data observation of traffic speeds were calculated by using floating car method that would be obtained the total of journey speed. From the result of the calculation and evaluation obtained the road performance at peak volume occurred in Monday morning from 7:00 to 08:00 am. It was obtained Q- value of 994.20 smp/ hour with a degree of saturation (DS) of 0.85 that was in category-D of service level that was unstable current, decreased speed. Average maximum journey speed was 59.7015 km/hour and average minimum speed was 25.0696 km /hour.Abstrak: Kawasan Jalan Pocut Baren kota Banda Aceh memiliki tata guna lahan yang berbeda-beda di sepanjang jalan yang terdiri dari kawasan perkantoran, pemukiman, pertokoan dan sekolah. Peningkatan volume lalu lintas di Jalan Pocut Baren menyebabkan terjadinya kemacetan di sepanjang jalan dan pada akhirnya menimbulkan penurunan kecepatan kendaraan yang berpengaruh pada tingkat konsumsi BBM yang meningkat. Penelitian ini bertujuan untuk mengevaluasi kinerja jalan dan kecepatan perjalanan kendaraan di jalan Pocut Baren pada saat jam puncak. Pengamatan data volume lalu lintas dilakukan untuk menghitung jumlah lalu lintas yang melewati jalan tinjauan dengan menggunakan metode Manual Kapasitas Jalan Indonesia (MKJI) 1997. Pengamatan data kecepatan lalu lintas dilakukan dengan menggunakan metode kendaran contoh (floating car method) yang nantinya akan diperoleh kecepatan perjalanan (journey speed) total. Hasil perhitungan dan evaluasi diperoleh kinerja jalan pada volume puncak terjadi pada hari senin pagi arah menuju kota jam 07.00-08.00 wib. diperoleh nilai Q sebesar 994,20 smp/jam dengan derajat kejenuhan (DS) sebesar 0,85 berada di tingkat pelayanan jalan kategori D yaitu arus tidak stabil, kecepatan menurun. Kecepatan perjalanan rata-rata maksimum sebesar 59,7015 km/jam dan kecepatan rata-rata minimum sebesar  25,0696 km/jam.
ANALISIS KEMAMPUAN PELAYANAN JARINGAN JALAN LINTAS TIMUR PROVINSI ACEH BERDASARKAN INDIKATOR INDEKS PRASARANA JALAN (IPJ) Liza Karmina; Renni Anggraini; Muhammad Isya
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The national road section of East Aceh Province is the primary road network that connects between the North Sumatra Province and Aceh provincial capital. As the access of Acehnese people to North Sumatra Province is Increasing during the time. Bireuen and Aceh Utara districts are the two districts that crossed by the national roads, this road section is the busiest streets from East section road. To be related with the important role of the national road network of Aceh province, it’s led to the issues of how the road network service capabilities using an indicator of Road Infrastructure Index (IPJ). The purpose of this study is to analyze the ability of the network service by using IPJ indicator. Data collection for indicators of IPJ is by interview to some key informant. Analysis of the IPJ is using four (4) variables: availability of road (Ktj), the performance of the road (Knj), the traffic load (Bln), and the road serviceability (Pyp). The results of analysis IPJ value in 2014 in the district of Bireuen is 1.01 and for North Aceh regency is 0.54, which is the value it’s below the national average score, the score for national is 5.68. The observation from both districts was obtained that total length of the national road network is very poor in serving the number of vehicles and population, but the availability of the national roads in the district has been able to service the administration areas, although the level of the service of road network is very lacking in serve for the daily activities of the population. Abstrak: Ruas jalan nasional Lintas Timur (Lintim) Provinsi Aceh merupakan jaringan jalan primer yang menghubungkan antar ibukota Propinsi Aceh dan Sumatera Utara. Akses pergerakan masyarakat Aceh menuju Provinsi Sumatera Utara semakin hari semakin meningkat. Kabupaten Bireuen dan Aceh Utara adalah dua kabupaten yang dilintasi oleh jalan nasional yang merupakan ruas jalan dengan aktivitas yang cukup padat. Berkaitan dengan pentingnya peranan jaringan jalan nasional Lintim Provinsi Aceh ini, maka muncul permasalahan bagaimana kemampuan pelayanan jaringan jalan Lintim dengan menggunakan indikator Indeks Prasarana Jalan (IPJ). Tujuan dari penelitian ini yaitu menganalisa kemampuan pelayanan jaringan jalan dengan menggunakan indikator IPJ. Pengumpulan data untuk indikator IPJ dilakukan dengan cara wawancara kepada beberapa responden. Analisa terhadap IPJ menggunakan 4 (empat) variabel yaitu ketersediaan jalan (Ktj),kinerja prasarana jalan(Knj),beban lalu lintas(Bln),dan pelayanan prasarana jalan (Pyp).  Dari hasil analisis diperoleh nilai IPJ pada tahun 2014 di Kabupaten Bireuen = 1,01 dan Kabupaten Aceh Utara = 0,54 dimana nilai tersebut jauh dibawah skor rata-rata nasional yaitu 5,68. Pada kedua kabupaten yang diamati diperoleh panjang total jaringan jalan nasional masih sangat kurang dalam melayani jumlah kenderaan dan jumlah penduduk, namun ketersedian jalan nasional yang ada di kabupaten ini sudah mampu memberi akses untuk melayani daerah adminitrasinya, walaupun dengan tingkat pelayanan jaringan jalan masih sangat kurang dalam melayani aktivitas penduduk sehari-hari.
Co-Authors . Azmeri, . Agusmaniza, Roni Ahlan, Muhammad Ahmad Suriansyah Akbar, Amanda Raju Alvisyahri Alvisyahri Amirullah Amirullah Antony, Ahmad Irvan Arlia, Leni arnanda, herri Ayuni, Zafara Quratul Azmi, Rajul Baihaqi Baihaqi Bambang Yulianto Bulba, Alfa Taras Cut Mutiawati Deddy Riad Defry Basin Dewi Suswati Didik Nurhadi EDI SAPUTRA Fadhlullah Apriandy Fadli Idris Fadli Idris Farah Fadillah Fitria Phonna Fitrika Mita Suryani Fuad Hasan Fuad Hasan Gumala Ashari Herman Herman Hermansyah . Hervia Yudistira Hesty Aquina, Hesty Ina Marlia Intan Wirnanda Irfan Irfan Irfan Irfan Irin Caisarina Izziah Izziah Jalil, Erlinawati Joly Srianty Khuzaifah Khuzaifah Lela Kusuma Leni Arlia Liza Karmina Lufthie, Muhammad M. Khair Jauhari, M. Khair Mahendra, Yusril Mirza Sofyan Mochammad Afifuddin Mufazzil Yusra Muhammad Ahlan Muhammad Isya Mukhlis Ramli Muksalmina Muksalmina Muttaqin Muttaqin Najwan, Nurul Nazariani Nazariani Noer Fadhly Nova Viyantimala Novitawati Novitawati Novriza, Ferdiansyah Nura Usrina Nurlely Nurlely Pramanda, Heru Purnawati Purnawati Putri, Aqlima Rahma Dani Rahmad Saputra Rahmani, Dhuyufur Rais, Faisal Riza Ofansha riza, Fakhrur Ruslan Ruslan Salmannur, Alfi Satria Mandaraira Sofi Marlinda Sofyan M. Saleh Sofyan M. Saleh Sofyan M. Saleh Sofyan M. Saleh Sri Budiani Sugiarto S Sugiarto Sugiarto Sugiarto Sugiarto Sugiarto Sugiarto Sumarni Sumarni Suriyadi Suriyadi Suryani*, Fitrika Mita Syafriana ., Syafriana Taqwadin, Abda Syakura Tasya Kumala Taufiq, Luthfi Chaliqi Teuku Fadrial Mahfud Teuku Zulhadi Tri Handayani Wahyu Rianda Wirnanda, Intan Yusria Darma Zafara Quratul Ayuni Zubir Zubir