Claim Missing Document
Check
Articles

Found 28 Documents
Search

Implementasi pendampingan suami terhadap istri yang mengalami kecemasan pada kehamilan trimester III di Klinik Barokah Medika Kemiling Bandar Lampung Ikhwanudin, Ikhwanudin; Nurhayati, Nurhayati; Wijayanti, Novida Prima
Borobudur Nursing Review Vol 5 No 1 (2025): Borobudur Nursing Review Vol 5 No 1 (January-June 2025)
Publisher : Universitas Muhammadiyah Magelang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31603/bnur.13861

Abstract

Pregnancy is a condition in which a woman has an embryo or fetus in her womb. Third trimester pregnancy is a pregnancy with an age of 28-40 weeks which is the time to prepare for birth and parenthood, and as a period of waiting. Anxiety is a vague and diffuse concern, which is related to feelings of uncertainty and helplessness. Husband assistance is a husband who accompanies or accompanies his wife in the labor process. This scientific paper aims to determine the characteristics of pregnant women who experience anxiety and determine the results of the implementation of husband assistance. The design of scientific papers is descriptive with a case study approach. The method used is the measurement of anxiety levels with HARS (Hamilton anxiety rating scale). The results of the implementation of husband assistance to mothers who experience anxiety are a decrease in the level of anxiety from the moderate to mild category. The conclusion of this scientific paper is that there is a decrease in anxiety, namely from the moderate category to the mild category.suggestion Pregnant women should know that the assistance of husbands, family and relatives is very important during the labor process because it can reduce anxiety.
Design of WWTP Anaerobic System at Tempe Factory JAMANTO, YOGA LESTIYANTO; Anggraini, Yossi Dewi; Rizani, Mohammad Debby; Ikhwanudin, Ikhwanudin
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 5, No 1 (2024)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v5i1.16337

Abstract

The tempe industry is a food industry that has the potential to pollute the environment from the liquid waste it produces. Liquid waste from the  tempe processing process if it is immediately disposed of without going through the  management process first will have an impact on environmental pollution. In Semarang City, precisely in Gunung Pati District, there is a medium-scale tempe processing factory. So far, the tempe factory's liquid waste is directly disposed of into a ditch behind  the  factory without processing the liquid waste first. This  research  is a quantitative research presented in the form of  numbers     and then explained in the form of descriptions. From the results of the wastewater quality test, the pollutant parameters BOD = 369 mg/L; COD = 28,000 mg/L; TSS  =  0.991 mg/L; and pH = 4.3. According to the Regional Regulation of the Province of Central Java Number 5 of 2012 concerning Amendments to the Regional Regulation of the Province of Central Java Number 10 of 2004, this value still does not meet the requirements. The wastewater treatment plant that the  researchers are planning is in the form of a holding tank;  Equalization Tub; Anaerobic Digesters; Gas Holder; Initial Settling Tub; Anaerobic Biofilter using bioball filter media and steel nets as a barrier for bioballs where bacteria are grown; and Final Settling Tank. With an estimated effluent from the processing of BOD, COD, and TSS of 7.47225 mg/L; 189mg/L; and 0.00669 mg/L which means it meets the quality standard. From the planning  results, it was obtained that the total budget plan for planning the tempe factory wastewater treatment plant was Rp. 111.280.021,49.
Pengembangan Media Pembelajaran Interaktif Fluida Statis dalam Perspektif Al-Qur’an Menggunakan Macromedia Flash Ikhwanudin, Ikhwanudin; Basith, Abdul
Indonesian Journal of Science and Mathematics Education Vol. 1 No. 3 (2018): Indonesian Journal of Science and Mathematics Education
Publisher : Universitas Islam Negeri Raden Intan Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24042/ijsme.v1i3.3596

Abstract

Abstract: This study aims to develop interactive static fluid learning media in the Al-Qur'an perspective using macromedia flash and find out the responses of students to the use of static fluid interactive learning media in the Al-Qur'an perspective using macromedia. This research is an R and D study that adopted the development of Borg and Gall. The subjects in this study were students of class X MA AL-HIKMAH Bandar Lampung. The results of this study are products in the form of static fluid interactive learning media in the Al-Qur'an perspective using macromedia flash with a percentage of material expert ratings of 84.02%, 82% media experts, 85.56% physics teachers with very feasible categories, and percentage 75.83% by media experts with a decent category. The response of class X students on static fluid interactive learning media in the Al-Qur'an perspective uses macromedia flash with a percentage of 85.08% in MA AL-HIKMAH Bandar Lampung.  Abstrak: Penelitian ini bertujuan untuk melakukan pengembangan media pembelajaran interaktif fluida statis dalam perspektif Al-Qur’an menggunakan macromedia flash dan mengetahui respon peserta didik terhadap penggunaan media pembelajaran interaktif fluida statis dalam perspektif Al-Qur’an menggunakan macromedia. Penelitian ini merupakan penelitian R and D yang mengadopsi pengembangan dari Borg and Gall. Subjek dalam penelitian ini adalah peserta didik kelas X MA AL-HIKMAH Bandar Lampung. Hasil penelitian ini adalah produk berupa media pembelajaran interaktif fluida statis dalam perspektif  Al-Qur’an menggunakan macromedia flash dengan persentasi penilaian ahli materi sebesar 84,02%, ahli media 82%,  guru fisika 85,56% dengan kategori sangat layak, dan persentasi 75,83% oleh ahli media dengan kategori layak. Respon peserta didik kelas X pada media pembelajaran interaktif fluida static dalam perspektif Al-Qur’an menggunakan macromedia flash dengan persentase 85,08% di MA AL-HIKMAH Bandar Lampung.
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH PADA INDUSTRI TAHU (Studi Kasus Pabrik Tahu WD Lamper Lor Semarang Selatan) Rizani, Mohammad Debby; Ikhwanudin, Ikhwanudin; Iffah, Khilya Milkhatul; Prayogi, Gilar Maynalda
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 1: Juni 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i1.18028

Abstract

In the production process, the tofu industry produces solid and liquid waste. The waste contains organic matter with high levels of BOD, COD, and TSS and does not meet quality standards. If the waste is directly discharged into the environment, it will reduce the carrying capacity of the environment. This research was conducted at the WD Lamper Lor Tofu Factory, with the aim of planning the design and RAB for the construction of the wastewater treatment plant at the Tofu Factory. This research uses quantitative analysis methods which are presented in the form of numbers which are then explained and interpreted in the form of descriptions. The quality of BOD, COD, TSS, and pH were 144 mg/L, respectively; 380 mg/L; 98 mg/L; and 4.34. Based on the quality standards, the wastewater does not meet the requirements, so it is necessary to plan a wastewater treatment plant. Researchers plan the processing stages, namely Reservoir, Equalization, Anaerobic Digester, Gas Storage, Presettlement Tub, Anaerobic Biofilter, and Final Sedimentation Tub. The estimated effluent from the processing of BOD, COD, and TSS is 2,916 mg/L, respectively; 7.695 mg/L; 2.116 mg/L. In addition to processing it into water that is fit for reuse, the design of this wastewater treatment plant produces methane gas that can be used for the tofu-making process or can be used on a household scale. The total budget plan for the planning of the Wastewater Treatment Plant at the WD Tofu Factory is 31,106,117.05.
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) PABRIK TEMPE DENGAN DIGESTER ANAEROBIK DAN BIOFILTER ANAEROBIK DI WILAYAH SEMARANG (Studi Kasus Pabrik Tempe Dampyak Gunung Pati Kota Semarang) Rizani, Mohammad Debby; Ikhwanudin, Ikhwanudin; Lestiyanto, Yoga; Anggraeni, Yossi Dewi
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18130

Abstract

The tempe industry is a food industry that has the potential to pollute the environment from the liquid waste it produces. Liquid waste from the tempe processing process if it is immediately disposed of without going through the management process first will have an impact on environmental pollution. In Semarang City, precisely in Gunung Pati District, there is a medium-scale tempe processing factory. So far, the tempe factory's liquid waste is directly disposed of into a ditch behind the factory without processing the liquid waste first.This research is a quantitative research presented in the form of numbers and then explained in the form of descriptions. From the results of the wastewater quality test, the pollutant parameters BOD = 369 mg/L; COD = 28,000 mg/L; TSS = 0.991 mg/L; and pH = 4,3. According to the Regional Regulation of the Province of Central Java Number 5 of 2012 concerning Amendments to the Regional Regulation of the Province of Central Java Number 10 of 2004 this value still does not meet the requirements. The wastewater treatment plant that the researchers are planning is in the form of a holding tank; Equalization Tub; Anaerobic Digesters; Gas Holder; Initial Settling Tub; Anaerobic Biofilter using bioball filter media and steel nets as a barrier for bioballs where bacteria are grown; and Final Settling Tank. With an estimated effluent from the processing of BOD, COD, and TSS of 7.47225 mg/L; 189mg/L; and 0.00669 mg/L which means it meets the quality standard. From the planning results, it was obtained that the total budget plan for planning the tempe factory wastewater treatment plant was Rp. 111.280.021,49.
PENANGANAN BANJIR DAERAH ALIRAN SUNGAI BABON KOTA SEMARANG Ikhwanudin, ikhwanudin; Yudaningrum, Farida; Wardani, Agustina
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 1: Juni 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v1i1.19456

Abstract

Floods are natural disasters that we often encounter during the rainy season. Apart from there are also tidal floods which are caused by global warming, this problem occurs in the city of Semarang, especially North Semarang, specifically the north coast of the Java Sea. Floods that occurred in 2021 in the city of Semarang include Starting from Genuk, Kaligawe, Satsiun Tawang, Tanjungmas, Karangayu, the flood disaster was caused by high rainfall, while tidal floods caused high tides and inundated roads and houses of residents on the north coast of Semarang city. To handle this problem, the government Currently we have made embankments, namely making embankments including the Sringin River which is equipped with a ponpa, Tenggang River, Babon River, Semarang River, Banger River, and others. These embankments are equipped with pumps so that when the water from upstream to downstream is high, the water is pumped. to the sea, the aim is to find out one of the annual discharges of the river, namely the Babon, and to find out the tamping capacity of the Babon River Longstorage. Apart from that, there is a method for handling tidal floods, namely using the Babon River Longstorage which is equipped with a pump, if there is high tide which inundates roads and houses. residents then the pump is turned on, whereas if the water recedes and does not inundate residential areas then the pump is turned off. Flood control analysis is calculated using the HEC-RAS program simulation using a return period of 50 years. Based on calculations using the HEC-HMS program. The flood discharge is 2,529 m3/sec. The high tide elevation is + 1.67 m, while the normal water level is -0.5 m.
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH PADA INDUSTRI TAHU (Studi Kasus Pabrik Tahu WD Lamper Lor Semarang Selatan) Rizani, Mohammad Debby; Ikhwanudin, Ikhwanudin; Iffah, Khilya Milkhatul; Prayogi, Gilar Maynalda
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 1: Juni 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i1.16193

Abstract

In the production process, the tofu industry produces solid and liquid waste. The waste contains organic matter with high levels of BOD, COD, and TSS and does not meet quality standards. If the waste is directly discharged into the environment, it will reduce the carrying capacity of the environment. This research was conducted at the WD Lamper Lor Tofu Factory, with the aim of planning the design and RAB for the construction of the wastewater treatment plant at the Tofu Factory. This research uses quantitative analysis methods which are presented in the form of numbers which are then explained and interpreted in the form of descriptions. The quality of BOD, COD, TSS, and pH were 144 mg/L, respectively; 380 mg/L; 98 mg/L; and 4.34. Based on the quality standards, the wastewater does not meet the requirements, so it is necessary to plan a wastewater treatment plant. Researchers plan the processing stages, namely Reservoir, Equalization, Anaerobic Digester, Gas Storage, Presettlement Tub, Anaerobic Biofilter, and Final Sedimentation Tub. The estimated effluent from the processing of BOD, COD, and TSS is 2,916 mg/L, respectively; 7.695 mg/L; 2.116 mg/L. In addition to processing it into water that is fit for reuse, the design of this wastewater treatment plant produces methane gas that can be used for the tofu-making process or can be used on a household scale. The total budget plan for the planning of the Wastewater Treatment Plant at the WD Tofu Factory is 31,106,117.05.
ANALISIS KESEIMBANGAN AIR DAERAH IRIGASI DOLOK BENDUNG BARANG KAB. DEMAK Yudaningrum, Farida; Ikhwanudin, Ikhwanudin; Kusmiawati, Siti; Solikhah, Sena Zaimatus
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 1: Juni 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i1.16189

Abstract

Indonesia as an agricultural country is very interested in the availability of water to support the agricultural sector. One of the efforts to maximize agricultural production results is the utilization of water resources through proper and efficient management of water allocation. D.I Dolok has a large enough land area and of course requires quite a lot of water, so it is necessary to analyze the needs and availability regarding the control of irrigation water for optimal agricultural land. The purpose of this study is to determine the availability of water and the need for irrigation water in D.I Dolok. In this study using Dr. method. FJ. Mock, after we have calculated the data we got from the results of the field survey, the results obtained for the total discharge that can enter the Barang Weir is 51.058 m3/s, and for the amount of water availability in Barang Weir it increases in the rainy season and decreases in the dry season with the largest discharge occurred in January, namely 4,800 m3/sec and the smallest discharge occurred in August, namely 0,160 m3/sec. As for the irrigation water needs of the Barangay Dam, it was obtained 32,967 m³/s with an area of 1296 Ha. Then for the calculation of the water balance by comparing the value of the mainstay discharge with the need for irrigation water with the selected cropping pattern, it can be concluded that the need for irrigation water can be fulfilled from the available mainstay discharge.
Banger Retention Pool As Alternative Control Flood Yudaningrum, Farida; Ikhwanudin, Ikhwanudin
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 1, No 1 (2020)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v1i1.19893

Abstract

Abstract. Semarang Utara is a lowland where the water level is approximately 2m above sea level so that if the weather is bad, waves or tidal waves occur, sea water will intrude onto the land . This happens almost every day, so a barrier is needed to prevent sea water intrusion into land . Before there was handling then It would be best to create an alternative retention pool simulation in the Banger chatment area . The method used uses primary data and secondary data taken from rainfall data closest to the B anger location, namely BMKG Mariti m. Retention pool simulation results and alternative pump capacities 1 with a pond area of 3.8 ha, input volume 1,199,070 m3 and output volume 432,000 m3, alternative 2 with a pond area of 4.7 ha, input volume 1,198,800 m3 and output volume 432,000 m3, alternative 3 with extensive 5 ha pond, input volume 1,199,070 m3 and output volume 432,000 m3 .Keyword : Pool Retention, Pumps, Channels
Planning Weir Jeruk Gulung In Troso Village, Pecangaan district, Jepara Regency Ikhwanudin, Ikhwanudin
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 2, No 1 (2021)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v2i1.8254

Abstract

Lack of water availability for agricultural land during the dry season results in less optimal agricultural productivity, This is what happened in Troso Lor village, Pecangaan sub-district, Jepara Regency. In order to meet water needs continuously and maintain the availability of water sources, efforts are needed in the framework of protecting, developing, controlling and utilizing water resources.  For this reason, a construction plan for the Jeruk Gulung Dam on the Jeruk Gulung River will be planned as an effort to utilize water sources for irrigation in the Troso village area, Pecangaan sub-district, Jepara regency.  Meanwhile, the results of the analysis of irrigation water requirements are used for channel hydrological analysis. After planning the weir construction, the weir stability control is carried out against rolling, shear, eccentricity and soil bearing capacity . Meanwhile, the results of the analysis of irrigation water requirements are used for channel hydrological analysis. After planning the weir construction, the weir stability control is carried out against rolling, shear, eccentricity and soil bearing. Based on the results of the analysis and planning of the Jeruk Gulung Dam, the data obtained for the area of rice fields is 16 Ha with a requirement of 0.019 m3 / s of irrigation water with a fixed weir type with 100.1347 m3 / sec flood discharge. The width of the weir is 19.2 m with an effective width of 17.7 m and a width of 1 m for rinsing.