Claim Missing Document
Check
Articles

Perancangan Tata Letak Fasilitas Pabrik Pada Pt. Nagoya Untuk Meminimasi Waiting Time Dengan Metode Algoritma Aldep Putri Meira Nabilah; Pratya Poeri Suryadhini; Widia Juliani
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT. Nagoya adalah perusahaan yang bergerak di bidang industri karet, PVC, plastik. PT. Nagoya adalah salah satu perusahaan supplier sparepart. PT. Nagoya memproduksi sparepart otomotif berbasis rubber, seperti seal switch, seal pengungkit, pengaman regulator, seal tombol, R3, cover nut, cap water reservoir tank dan seal breket. Pada tahun 2018 PT. Nagoya sering mengalami keterlambatan pengiriman hingga 26 hari. Terlihat pada kondisi perusahaan saat ini, PT. Nagoya memiliki dua pabrik yang berbeda. Pabrik yang berada di Nanjung hanya untuk departemen produksi, dan departemen finishing berada di pabrik Cimahi. hal tersebut tentu saja berpengaruh terhadap lead time produksi dan besarnya jarak perpindahan material antar departemen. Perhitungan ini menggunakan algoritma ALDEP sebagai algoritma perbaikan tata letak fasilitas. Berdasarkan penelitian yang dilakukan, tata letak usulan dapat mereduksi total jarak perpindahan material sebesar 99.63% dan menghilangkan waiting time dari departemen produksi ke departemen finishing. Kata kunci: Tata letak, Algoritma ALDEP, Total Closeness Rating, lead time.
Penerapan Metode 5S Untuk Meminimasi Waste Motion Pada Proses Produksi Seal Brecket Di PT. Nagoya Dengan Pendekatan Lean Manufacturing Aqiilah Khoiriyyah Husnaa; Pratya Poeri Suryadhini; Widia Juliani
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT. Nagoya INA Engineering merupakan perusahaan yang bergerak di bidang industri karet, PVC, dan plastik. Hasil produksi dari perusahaan ini yaitu seal switch, seal pengungkit, seal brecket, cover nut, pengaman regulator, rubber disk, rubber molla, cap water reservoir tank, seal tombol, dan R3. Pada Januari 2018 – Juli 2018 seal brecket memiliki total produksi terbesar, yaitu sebanyak 777. 245 pcs atau 48,72% dari total produksi secara keseluruhan. Tetapi PT. Nagoya mengalami keterlambatan pengiriman produk, produk yang paling sering mengalami keterlambatan pengiriman adalah seal brecket. Untuk mengetahui penyebab keterlambatan pengiriman, dilakukan penelitian pada proses produksi seal brecket yang berlokasi di Nanjung dengan cara pemetaan aliran produksi menggunakan Value Stream Mapping dan Process Activity Mapping . Pada Value Stream Mapping ditemukan NVA time sebesar 88 detik dan lead time selama 1334 detik. Pada Process Activity Mapping didapatkan aktivitas NVA yang tergolong ke dalam waste motion. Berdasarkan waste motion yang ditemukan, dilakukan pencarian akar penyebab masalah menggunakan 5 Why’s. Waste motion diminimasi dengan melakukan usulan perbaikan menggunakan pendekatan lean manufacturing. Usulan perbaikan dirancang menggunakan metode 5S untuk mereduksi waste motion, sehingga dapat mempersingkat lead time. Untuk mencapai tujuan 5S di lakukan pengurangan waktu set up dengan merancang alat bantu produksi usulan. Dari perancangan usulan perbaikan, lead time berkurang sebanyak 32% atau sebesar 909 detik dengan penurunan NVA time sebesar 88 detik dan NNVA time sebesar 336 detik. Kata kunci: PT.Nagoya, Non Value Added Activity, Value Stream Mapping, Process Activity Mapping, Waste Motion, Lean Manufacturing, 5S
Optimalisasi Rak Penyimpanan Pada Gudang Work-in-process Untuk Mengatasi Kekurangan Kapasitas Rak Dan Penumpukkan Pallet Dengan Menggunakan Standardisasi Kerja Feiliana Feiliana; Pratya Poeri Suryadhini; Ayudita Oktafiani
eProceedings of Engineering Vol 7, No 2 (2020): Agustus 2020
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT XYZ Farma merupakan perusahaan yang bergerak di bidang farmasi dengan salah satu produksinya yaitu produk LVP. Dalam rangkaian proses produksi produk LVP perlu dilakukan proses penyimpanan WIP selama 14 hari sebagai salah satu syarat untuk memastikan kualitas produk yang sampai pada konsumen adalah kualitas yang baik. Pada proses penyimpanan yang dilakukan di Gudang WIP teridentifikasi bahwa terdapat penyimpanan yang tidak sesuai karena adanya kekurangan rak untuk penyimpanan pallet WIP sebanyak 54 pallet. Berdasarkan permasalahan tersebut, dilakukan penelian yang bertujuan untuk mengoptimalkan alokasi rak penyimpanan pada GWIP. Dengan menggunakan konsep lean manufacturing, identifikasi penyebab masalah dilakukan pada GWIP dengan menggunakan tools berupa VSM, PAM, dan 5Whys. Berdasarkan permasalahan yang teridentifikasi, yaitu terjadinya alokasi rak penyimpanan menjadi rak staging karena adanya proses staging, selanjutnya dilakukan perancangan standardisasi kerja pada GWIP dengan perhitungan waktu baku dan penyederhanaan kerja berupa perancangan aplikasi. Hasil dari usulan yang diberikan yaitu dengan adanya perancangan aplikasi dan perhitungan waktu baku, maka proses staging dapat dihilangkan dan 54 rak kembali fungsinya menjadi rak penyimpanan, sehingga tidak terjadi lagi penyimpanan pallet di luar rak penyimpanan. Hasil dari usulan ini digambarkan dalam simulasi dengan menggunakan software FlexSim. Berdasarkan simulasi yang dilakukan, didapat bahwa tidak terjadi tumpukan pada GWIP setelah perbaikan. Kata kunci : gudang, lean manufacturing, standardisasi kerja, FlexSim Abstract PT XYZ Farma is a pharmacy company with one of its product namely LVP products. In the series of LVP production processes, it is necessary to carry out a 14-day WIP storage process as one of the requirements to ensure that consumers can get the best quality of the product. In the storage process carried out at WIP Warehouse, it was identified that there was inappropriate storage due to lack of shelves for WIP pallet storage. Based on these problems, a study was conducted aimed at optimizing the allocation of storage shelves in GWIP. By using the concept of lean manufacturing, identification of the causes of the problem is done at GWIP by using tools such as VSM, PAM, and 5Whys. Based on the identified problems, namely the allocation of storage shelves into staging racks due to the staging process, then the work standardization design is carried out on GWIP by calculating standard time and simplifying the work in the form of application design. The result of the proposal given is that with the application design and standard time calculation, the staging process can be removed and the 54 returns to its normal functioning as a storage rack, so that pallet storage does not occur outside the storage rack again. The results of this proposal are illustrated in a simulation using FlexSim software. Based on the simulation conducted, it was found that there was no pile in the GWIP after improvement. Keywords: warehouse, lean manufacturing, work standardization, FlexSim
Perancangan Sistem Kanban untuk Mengurangi Keterlambatan Komponen Rear Spar Niken Ayu Pramudita; Prasetio, Murman Dwi; Suryadhini, Pratya Poeri
Jurnal Sistem Cerdas Vol. 6 No. 3 (2023)
Publisher : APIC

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37396/jsc.v6i3.339

Abstract

Kanban literally means a visual note that usually takes the form of a card placed in a rectangular vinyl envelope and containing part information sent from one process to the previous process. The application of kanban is believed to optimize the production process. In this study, the kanban system was designed to reduce delays in Rear Spar components at PT. XYZ, a manufacturing company that produces aircraft, such as NC212 aircraft. The Rear Spar component on NC212 aircraft is often delayed. The main cause of Rear Spar delays is the unclear information and material flow so that operators on the Fabrication Line do not know when parts must be in the Assembly Line so that there is no priority for part work and some parts are late to be delivered to the Assembly Line. The design of the kanban system is carried out using the Constant-Quantity Withdrawal System method which consists of four stages, namely: calculating the lead time, calculating the necessary number of parts during the lead time, calculating safety inventory, and calculating the number of kanban cards. After calculating the number of kanban cards, the number of Assembly Line kanban cards to the Assembly Store is one sheet of production kanban and one sheet of withdrawal kanban. As for the number of Assembly Store kanban cards to the Fabrication Line is one sheet of production kanban for each part. The design of the kanban system is continued with the design of the kanban card, kanban mechanism, and kanban post position. The results obtained after simulating the design results using the simulation scenario made by the author are that the part making process is reduced by 41 minutes.
Flow Shop Scheduling Using a Combination of Ant Colony Optimization Algorithm and Tabu Search Algorithm to Minimize Total Tardiness Bestari, Hana Merlina Hesti; Suryadhini, Pratya Poeri; Nopendri, Nopendri
JTI: Jurnal Teknik Industri Vol 10, No 2 (2024): December 2024
Publisher : Universitas Islam Negeri Sultan Syarif Kasim Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24014/jti.v10i2.32320

Abstract

This paper addresses the problem of production tardiness on five parallel production floors at PT Garmen X, each with an identical machine arrangement. The proposed method combines Ant Colony Optimization (ACO) and Tabu Search (TS) algorithms for flow shop scheduling problems.  ACO acts as the primary method for finding the optimal solution. At the same time, the Tabu Search algorithm is applied as a local search to improve the quality of the solution found by ACO. The results show significant performance improvement, with a decrease in total tardiness by 88.09% and a reduction in total makespan by 5.08% compared to the existing method. Keywords: Garment, Flow shop, Ant Colony Optimization, Tabu Search, Total Tardiness
Perancangan Rute Optimal Distribusi Kargo Bahan Bakar Minyak dengan Metode Brute - Force Untuk Meminimasi Biaya Konsumsi Bahan Bakar Minyak Perusahaan Pelayaran PT XYZ Tiodora, Brissa; Poeri Suryadhini, Pratya; Nopendri, Nopendri
Ranah Research : Journal of Multidisciplinary Research and Development Vol. 6 No. 6 (2024): Ranah Research : Journal Of Multidisciplinary Research and Development (Septemb
Publisher : Dinasti Research

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38035/rrj.v6i6.1127

Abstract

TSP of fuel oil distribution using tankers, the projected route search often does not contain the most minimal mileage, which can lead to adverse results such as significant additional costs. This research analyzes four different routes using several iterative proposals to reduce travel distance, time, and fuel costs compared to actual conditions. Problem solving is carried out using the Brute-Force method which enumerates all permutation results. The analysis results show that all proposed iterations were able to provide significant reductions in all three aspects. The four research routes achieved optimization results of 21,7% compared to the actual route modeling. This optimization proves that the iterative methods applied can substantially improve operational efficiency. Therefore, the determination of the tanker route must consider all the possibilities required in determining the route. The optimal route created is expected to have a new model with the aim of minimizing fuel costs based on the smallest distance and time calculations.
Perancangan Tempat Penyimpanan WIP untuk Meminimasi Cacat Size Mismatching pada Kaus dengan Menggunakan Metode NIDA (Need, Ideas, Decision, Action) Pada PT Fluxdev Global Industry Puspitasari, Indah; Andias Anugraha, Rino; Poeri Suryadhini, Pratya
Ranah Research : Journal of Multidisciplinary Research and Development Vol. 6 No. 6 (2024): Ranah Research : Journal Of Multidisciplinary Research and Development (Septemb
Publisher : Dinasti Research

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38035/rrj.v6i6.1142

Abstract

A small and medium-sized company in the t-shirt manufacturing industry, PT Fluxdev Global Industry, is having trouble achieving its production goals. The primary issue is that the components of the socks that are made don't match in size. The fact that the chopped materials are not sorted by size is one of the contributing reasons, since it makes it challenging for the operator to determine the size of the materials to be processed. According to the Lean Six Sigma methodology, the company's process capability index (Cp) only reached 1.30 as a result of the inability to satisfy production targets. Even if the production method is very competent, more advancements are still required to increase this index in order to meet the company's goals. In order to minimize product defects, the proposed improvement in this Final Project is to design a tool that can address these issues. The focus of this improvement is to avoid the accumulation of materials after cutting by separating the materials based on size. The design of the assistive device is carried out using the NIDA method. (Needs, Ideas, Decision, Action). The designed aid is a trolley with dividers to separate the sizes of garment components such as S, M, L, and XXXL. This trolley comes in two sizes, 100 x 71 cm and 110 x 71 cm, and is designed to facilitate operators in sorting and identifying the sizes of body and sleeve components according to the cutting patterns.
Analisis Efektivitas Proses Inspeksi Genting dengan Sistem Integrasi Conveyor dan Operator Manusia Menggunakan Metode Overall Equipment Effectiveness (OEE) pada PT XYZ Purnomo, Anggie Shefira Novian; Prasetio, Murman Dwi; Suryadhini , Pratya Poeri
eProceedings of Engineering Vol. 12 No. 1 (2025): Februari 2025
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak— PT XYZ merupakan salah satu industrimanufaktur genting di Jatiwangi, Majalengka. Dalam prosesproduksi genting mengalami penurunan jumlah pekerja setiaptahun, yang berdampak pada kemampuan perusahaan dalammemenuhi permintaan pasar. Karena proses produksi rata-ratamasih dilakukan secara manual, maka diberikan solusi yaitumelakukan otomatisasi. Otomatisasi yang dilakukan yaitudengan membuat perancangan sistem integrasi conveyor yangdiharapkan dapat mengatasi permasalahan kekurangan tenagakerja dalam perusahaan. Sistem ini diterapkan dalam prosesinspeksi genting karena proses ini merupakan yang palingpenting untuk menilai kualitas genting. Oleh karena itu,dilakukan perhitungan efektivitas dalam inspeksi genting padakondisi awal dan kondisi usulan. Pada kondisi awal, inspeksidilakukan secara manual oleh operator menggunakan tenagamanusia, sementara dalam kondisi usulan, digunakan sistemintegrasi conveyor dengan tiga kecepatan berbeda: 420 rpm,600 rpm, dan 750 rpm. Perbandingan efektivitas antara kondisiawal dan usulan dilakukan menggunakan metode OverallEquipment Effectiveness (OEE), dengan hasil OEE kondisi awal84% dan OEE kondisi usulan masing-masing 41,17%, 42,62%,dan 41,78%. Selain itu, dilakukan juga perhitungan biayamenggunakan metode Life Cycle Cost (LCC) mencakup biayapembuatan alat, biaya operasional, dan biaya pemeliharaanalat. Hasil analisis OEE dan LCC ini akan digunakan olehstakeholder untuk pengambilan keputusan lebih lanjut. Kata kunci—Overall Equipment Effectiveness (OEE), LifeCycle Cost (LCC), Sistem Integrasi Conveyor, Tenaga Kerja, Kualitas
Perancangan Aktivitas 5s Untuk Meminimasi Waste Motion Pada Proses Produksi Hijab Instan Cv Xyz Dengan Pendekatan Lean Manufacturing Anugrah, Betty Mellyana; Suryadhini, Pratya Poeri; Nopendri, Nopendri
eProceedings of Engineering Vol. 12 No. 1 (2025): Februari 2025
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak - CV XYZ merupakan salah satu UMKM yangbergerak dibidang idnustri tekstil dan fashion. Salah satuproduk yang dihasilkan oleh CV XYZ yaitu hijab instan.Perusahaan ini sering mengabaikan peluang untukmendapatkan profit seperti pada pembatasan produk defect,efisiensi jam kerja, serta sering kali melewati bataspengiriman produk ke pelanggan. Hal ini tidak dapatdibiarkan dalam jangka waktu yang lama dikarenakandapat memberikan dampak yang buruk. Untuk ituperusahaan melakukan identifikasi terkait terhadappermasalahan yang ada. Identifikasi ini dapat dilakukandengan mencari akar penyebab permasalahan menggunakanfishbone diagram. . Perancangan usulan yang akandilakukan yaitu untuk mengurangi aktivitas yang tidakbernilai tambah pada proses produksi hijab instan denganpenerapan aktivitas 5S yaitu seiri, seiton, seiso, seiketsu, danshitsuke. Perancangan pada seiri dapat berupa pemasanganred tag dan logister, perancangan seiton dapat berupatempat penyimpanan barang serta pemberian labelling,perancangan seiso dapat berupa perancangan tempatpenyediaan kebersihan serta dibuat checklist aktivitaskebersihan, perancangan seiketsu dapat berupa pembuatanjadwal piket serta peraturan kerja para operator tentang 5S,serta yang terakhir yaitu perancangan shitsuke dapat berupaperancangan display, checklist kebersihan sertapembiasaan aktivitas 5S. Dengan adanya aktivitas 5S ini,dapat membuat para operator lebih produktif dan lebihdisiplin dalam melakukan kegiatan proses produksi. Kata kunci— Lean Manufacturing, 5S, Value StreamMapping, Process Activity Mapping, Waste Motion
Perancangan Sistem Integrasi Conveyor Dengan Sensor Kualitas Pada Pt Xyz Untuk Menghitung Kuantitas Produksi Genting Dengan Pendekatan Multi Layer Rizaldi, Muhammad Yusuf; Prasetio, Murman Dwi; Suryadhini, Pratya Poeri
eProceedings of Engineering Vol. 12 No. 1 (2025): Februari 2025
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak — PT XYZ merupakan perusahan yangmemproduksi genting yang terletak di Jatiwangi, Majalengka,Jawa Barat. Pada proses perpindahan genting dari prosespembakaran ke proses inspeksi hingga ke tempat penyimpananpada proses produksi dilakukan secara manual oleh operatoryang bisa mengakibatkan genting jatuh. Pada saat perpindahangenting tersebut terdapat genting yang jatuh mengakibatkangenting tersebut mengalami defect. Selain itu Pada PT XYZterjadi perbedaan data hasil produksi genting yang berada diaktual lapangan dengan yang ada di pencatatan pembukuanhasil produksi. Dalam menyelesaikan permasalahan yangterdapat pada PT XYZ tersebut pada Tugas Akhir inimenggunakan pendekatan multi-layer pada digital Twin. Prosesperancangan sistem integrasi conveyor dengan sensor kualitas inidirancang dengan berdasarkan tiga lapisan utama dalampendekatan multi-layer pada digital twin yaitu model, signal, daninterfaces. Setelah dilakukan perancangan sistem integrasiconveyor dengan sesor kualitas dengan pendekata multi-layerpada digital twin maka diperoleh hasil kekakuratan dataproduksi genting menjadi 100%. Selain itu dengan melakukanperancangan ini proses perpeindahan genting dari prosespembakaran ke proses inspeksi hingga ke tempat penyimpananbisa dilakukan secara otomatis menggunakan conveyor sehinggamenurunkan defect genting yang diakibatkan jatuhnya gentingpada proses perpindahan. Kata kunci — [Digital Twin, Multi-layer, Akurasi Data, Proses Perpindahan, Defect ]
Co-Authors Adin Yusti Yulian Agus Alex Yanuar Akma Septia Viady Al Rasyid, Fakhri Harun Alip, Muhammad Yusuf Andry Reza Anggara Anugrah, Betty Mellyana Aqiilah Khoiriyyah Husnaa Argari Alpharianto Ario Dwi Wrahatnolo Assidiq, 1stMuhammad Rezki Auliya , Gita Fitri Ayren Tantri Sofan Ayren Tantri Sofan, Ayren Tantri Ayu Arista Lamato Ayudita Oktafian Ayudita Oktafiani Ayulia Fitriane Setiawan Azzam Nadhifta Ahmady Bestari, Hana Merlina Hesti Corrie Susanto1 Damayanti, Dida Diyah Debby Syavira Anesia Dida Diah Damayanti Dira Putri Januarti Dita, Nabiilah Rahmah Dwi Intan Aprimuna Fahriandoni, Syafiq Kemal Febrina Indri Rumondang Febrina Indri Rumondang, Febrina Indri Feiliana Feiliana Fitra, Puput Auditya Fransiskus Tatas Dwi Atmaji Gita Ayu Dinar Pramesti Ilma Mufidah INDAH PUSPITASARI Laras Shinta Cahya Putri Lellyta Nurani P Lintong Tarnama Lumbantoruan Maria Dellarosawati Idawicaksakti Marina Yustiana Lubis Maulina Dwiwanti Maya Anestasia Maya Anestasia, Maya Mega Fitriana Rosa Meldi Rendra Mira Rahayu Mohamad Ilyas Faturrakhman Muhammad Iqbal Muhammad Iqbal Muhammad Rizqi Fauzan Munawaroh, Diela Qoriatul Murazky Hengki Riaja Murman Dwi Prasetio Murni Astuti Murni Dwi Astuti Nada, Khulya Luthfia Niken Ayu Pramudita Nopendri Nopendri Nopendri Pahlevi, Sinta Prasetio, Eng Murman Dwi Purnomo, Anggie Shefira Novian Putri Meira Nabilah Putri, Icha Ebtiana Putrifa Wirahayu Adi Muslima Qolli Kusuma Qolli Kusuma, Qolli Raden Muhamad Marjan Faisal Rahayu Novita Tanzil Rahman, Nada Mufida Ramdhan Pragustian Ratih Larasati Ridzky Utomo Rinda Rieswien Rinda Rieswien, Rinda Rino Andias Anugraha Riska Safira Permatasari Rizaldi Darmawan Rizaldi, Muhammad Yusuf Salsabila, Diana Salsabila, Rahmi Sarah Ni'ma Shafira Shiela Azmy Sinambela, Hizkia Michael Parulian Sri Widaningrum Syafrizal, Teddy Tiodora, Brissa Wicaksono, Fahry Widia Juliani Wita Anggraita Puspita Yanuar, Ramdhani Yudistira, Shafa Samira Yulinda Uswatun Kasanah Yusha Rahman Adiguna