Bridge Condition Assessment (Case Study: Padang – Bukittinggi Route) Masza, Amelia; Hidayat, Benny; Ophiyandri, Taufika
CIVED Vol. 12 No. 1 (2025): March 2025
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.713

Abstract

Bridges are critical components of transportation infrastructure, ensuring smooth traffic flow and regional connectivity. However, their structural conditions are influenced by various factors, including traffic loads, material durability, and natural disasters such as earthquakes and floods. Despite existing bridge maintenance frameworks, a comprehensive condition assessment specifically tailored to the Padang-Bukittinggi route has not been thoroughly conducted. This study introduces a systematic evaluation using the Bridge Condition Rate (BCR) method to provide data-driven maintenance recommendations. A total of eight bridges along the Padang-Bukittinggi route were assessed through detailed and routine inspections, followed by cross-case analysis. The results indicate that 75% of the bridges (6 out of 8) require periodic maintenance (BCR=2), 12.5% (1 bridge) necessitates rehabilitation (BCR=3), and another 12.5% (1 bridge) demands immediate replacement (BCR=5) due to severe structural damage. These findings highlight the urgency of targeted maintenance strategies to enhance bridge longevity and operational safety. The study provides critical insights for policymakers and infrastructure authorities, emphasizing the need for proactive maintenance planning to ensure road network sustainability and public safety.
Inhibiting Factors of the Acceleration of Irrigation Water Use Improvement Program Permata, Nadia; Hidayat, Benny; Ophiyandri, Taufika
CIVED Vol. 12 No. 1 (2025): March 2025
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.721

Abstract

Inhibiting Factors of the Acceleration of Irrigation Water Use Improvement Program (P3-TGAI) is a program for rehabilitation, improvement, or construction of irrigation networks based on the participation of farming communities which is carried out in a self-managed or non-contractual manner follow-up to the Ministry of PUPR Directorate General of Water Resources. Based on the evaluation results from Pambudi & Pramujo in 2023, the implementation of P3-TGAI activities at the basic level still encounters various problems, although in general many successes have been achieved. These problems are seen from the aspects of funding transparency, institutional readiness in the field, late determination of target locations, and less than optimal socialization at the farm level. These problems will hamper the aims, objectives, and goals of P3-TGAI activities. In order for the future implementation of this activity to run smoothly, research was conducted to find out what are the inhibiting factors that have the potential to hinder the success of this inhibiting activity in the preparation stage, planning stage, and implementation stage. The research was conducted using a quantitative descriptive method with a questionnaire instrument. The questionnaire was distributed to assistants. From the results of the study, it was found that there were 15 inhibiting factors with a very high influence on the implementation of P3-TGAI activities. 60% of them came from the preparation stage, 27% came from the implementation stage, and the rest (13.3%) came from the planning stage. Of all the inhibiting factors with a very high influence, there is one inhibiting factor with the highest score, namely communication with the community is not good. The solution to poor communication with the community is that the assistants build good emotional relationships with the community, ТPM must often go to the field, and assistants mingle with the community. In terms of general project objectives, inhibiting factors that hinder timeliness are lack of community participation and poor communication and coordination by the community. The inhibiting factors that hinder quality accuracy are the lack of knowledge and experience of the assistants and the lack of socialization to the village community. And the inhibiting factor that hinders cost accuracy is that the community is manipulated by other parties.
Evaluation of Landslide Disaster Management in Sawahlunto Syafira, Diana Dwi; Ophiyandri, Taufika; Hidayat, Benny
CIVED Vol. 12 No. 1 (2025): March 2025
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.737

Abstract

Sawahlunto City had a high level of landslide vulnerability due to its hilly topography with steep slopes and clay-dominated sedimentary geological conditions. These characteristics made the area highly susceptible to prolonged heavy rainfall, which acted as the main trigger for landslides. In response, the Regional Disaster Management Agency (BPBD) of Sawahlunto implemented disaster management efforts in the pre-disaster, during-disaster, and post-disaster phases. To evaluate the effectiveness, strengths, and weaknesses of these efforts, an evaluation was conducted along with the formulation of alternative strategies for landslide disaster risk reduction. This study employed a qualitative approach, based on interviews with 26 respondents, including relevant agency representatives and affected community members. A SWOT analysis was used to evaluate disaster management activities by identifying internal (strengths and weaknesses) and external (opportunities and threats) factors. The data were analyzed using thematic analysis to identify key themes based on similarities in the respondents’ statements. The results indicated several strengths, including disaster education programs, the Sitaruna Darling initiative, hazard warning signs, risk assessment documents, community forums, and inter-agency collaboration. Weaknesses included limited structural mitigation, poor drainage management, unregulated development, uneven distribution of disaster education, gaps in the formation of Disaster Resilient Villages, damaged early warning systems, and limited financial and human resources of BPBD. Opportunities involved community interest in disaster education, village fund allocation, technological utilization, a strong local cooperation culture, and potential support from BNPB and local parliament programs Major threats included prolonged high-intensity rainfall, unstable topographic and geological conditions prone to landslides, and low public understanding of landslide disaster risks. The recommended strategies involved enhancing inter-agency synergy, optimizing structural mitigation, strengthening regulations, ensuring equal access to disaster education, developing Sitaruna Darling innovations, improving early warning systems, and utilizing BNPB grants for recovery efforts.
Making Biocarno Fertilizer from Marine Organic Waste to Increase the Income of the Abadi Fisherman Farmer Group in Kuala Indah Village Hidayat, Benny; Sibayang, Nur Ulina; Jamilah
ABDIMAS TALENTA: Jurnal Pengabdian Kepada Masyarakat Vol. 9 No. 1 (2024): ABDIMAS TALENTA: Jurnal Pengabdian Kepada Masyarakat
Publisher : Talenta Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32734/abdimastalenta.v9i1.14034

Abstract

Management of marine organic waste can also be used as a solution to reduce marine waste and prevent global warming considering that the sea has many roles in supporting the life of living creatures and maintaining the ecosystem. The organic fertilizer that will be produced will be called "Biocarno Fertilizer" with good quality. The aim of this activity is to form or develop the Abadi Fishermen Farmer Group which is economically and socially independent, helps create peace and comfort in social life, and increases the skills and income of Farmer Group members in producing Biocarno Fertilizer independently. The result of this activity is the completion of community service in the form of counseling and outreach carried out by the service team to partner farmer groups, namely making Biocarno fertilizer by mixing several raw materials such as marine organic waste, cow dung, rice straw, Azolla, EM4 and molasses as a bioactivator. composting process. The next planned stage that must be carried out is to monitor and evaluate the progress of compost maturation over the next month, then samples of the mature compost will be taken to be taken to the laboratory for nutrient analysis so that farmers can modify the compost raw materials to produce quality compost according to the standards determined by SNI 19-7030-2004.
Production of Black Garlic Assyifa made by the Utsman Bin Affan Islamic Boarding School, Pantai Labu District use Thermolysis Equipment Sebayang, Nur Ulina Warnisyah; Hidayat, Benny; Raju; Kirana Aulia Rahma; Suranti Pratiwi; Corrady Noveindo Tanwie; Muhammad Syahid Zidan
ABDIMAS TALENTA: Jurnal Pengabdian Kepada Masyarakat Vol. 9 No. 2 (2024): ABDIMAS TALENTA: Jurnal Pengabdian Kepada Masyarakat
Publisher : Talenta Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32734/abdimastalenta.v9i2.18126

Abstract

Black Garlic is a product resulting from the thermolysis of garlic which is highly nutritious and has many benefits for the health of the human body. The problem that occurs is that black onion products are very rare and the price is very expensive. Limitations regarding equipment and from marketing and social aspects of the community include knowledge in producing black garlic, as well as marketing it to be able to increase partners' income sources. So far, partners have only used a simple method, namely an electronic rice cooker (Rice Cooker). The solution is to increase public understanding about the properties of black garlic and increase awareness of production so that it can get added value in the form of income if sold to the Utsman Bin Affan Islamic Boarding School. By using a thermolysis device with a capacity of 30 kg, it is possible to increase the quality and production of black garlic. The aim of the PkM implementation activities for the DRTPM Community Based Empowerment scheme in 2024 is to improve the quality of Black Garlic made by Pondok Tahfizh Utsman Bin Affan Pantai Labu by utilizing a thermolysis tool so that it can increase the level of income for partners. This service activity resulted in the production of 30 kg of black garlic on the 12th day of thermolysis with visualization results such as a slightly chewy texture, an even black color throughout, and a distinctive black garlic smell. The organoleptic results of black garlic have a taste that is dominated by sweetness and is slightly sour. The next plan in this service is to help partners in the packaging and marketing process using social media technology.
Identifikasi Tingkat Penggunaan Laporan Harian Pada Proyek Konstruksi Hidayat, Benny; Syahra, Regina Amanda
Jurnal Bangunan, Konstruksi & Desain Vol 1 No 1 (2023): Mei 2023
Publisher : Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jbkd.1.1.1-10.2023

Abstract

Manajemen proyek memerlukan alat untuk mencatat kegiatan proyek sehingga dalam pelaksanaan pekerjaan proyek bisa dipantau dan dievaluasi. Salah satu alat yang dipakai adalah laporan harian, yang kemudian dikembangkan menjadi laporan mingguan dan laporan bulanan. Namun laporan harian ini terkadang dianggap sebagai sesuatu yang kecil dan hanya sebagai syarat administratif pelaksanaan proyek. Tujuan penelitian ini adalah untuk mengidentifikasi fungsi atau kegunaan laporan harian pada proyek konstruksi dan mengevaluasi prosedur pelaporan dan isi laporan harian proyek berdasarkan regulasi yang dikeluarkan oleh Departemen PUPR. Penelitian ini menggunakan purposive sampling dengan metode wawancara dan studi dokumentasi terhadap 12 proyek di Sumatera Barat yang terdiri dari 3 proyek skala besar, 5 proyek skala menengah, 4 proyek dengan skala kecil. Total informan dalam penelitian ini sebanyak 30 orang dengan berbagai jabatan dalam proyek konstruksi. Hasil penelitian memperlihatkan laporan harian digunakan sebagai salah satu laporan kepada pemilik proyek atas kemajuan konstruksi, memudahkan monitoring atau pemantauan pekerjaan oleh kontraktor, dan untuk mengawasi aktivitas atau biaya. Prosedur pembuatan laporan harian sudah sesuai dengan regulasi yang ada. Dari segi isi laporan harian, masih terdapat kekurangan dalam mencatat kualitas bahan, kondisi peralatan, hambatan dan kendala, informasi keselamatan konstruksi dan rencana kerja hari selanjutnya.
Penilaian Kondisi Jembatan di Kabupaten Sijunjung Hidayat, Benny; Kamil, Insannul
Jurnal Bangunan, Konstruksi & Desain Vol 1 No 2 (2023): Agustus 2023
Publisher : Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jbkd.1.2.99-108.2023

Abstract

A bridge is a construction structure whose role is to connect one place to another by crossing a natural or artificial obstacle. Bridge conditions can be caused by many factors such as the influence of weather, traffic loads, the environment, material durability, and so on. Good bridge conditions can be achieved if maintenance is carried out regularly. Therefore, assessing or checking the condition of the bridge is very necessary so that disturbances caused by the factors above can be avoided before an accident occurs. From the results of the field survey, it was found that 52.11% of bridges were in Good condition, 27.46% in Lightly Damaged Condition, 16.90% in Damaged Condition, 2.82% in Severely Damaged Condition and 0.70% in Critical Condition. . The bridge condition assessment was carried out for 2 weeks by carrying out inventory checks, detailed surveys and routine surveys on each bridge.
Pemodelan 3D Jembatan Lengkung, Studi Kasus Jembatan Bukit Sulap, Menggunakan Software Autodesk Revit Kharimah, Muhammad Ihsanul; Hidayat, Benny
Jurnal Bangunan, Konstruksi & Desain Vol 1 No 3 (2023): Desember 2023
Publisher : Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jbkd.1.3.133-140.2023

Abstract

Infrastructure is an essential sector in a country, and infrastructure development reflects the country's progress. Infrastructure development is a priority, but the implementation of infrastructure projects needs to pay attention to time, costs and quality. Building Information Modeling (BIM) has the potential to minimize errors and increase efficiency. BIM is a method that was originally applied to the AEC (Architecture, Engineering and Construction) industry. BIM technology makes it possible to create 3D building models that contain information, analysis of work volume calculations, scheduling, and cost calculations. There is several software that applies BIM technology such as Autodesk Revit, Autodesk Advanced Steel, Tekla Structures and Navisworks. BIM technology has been widely applied in construction projects in Indonesia, be it buildings, roads or bridges. In this research, modelling of a steel truss bridge with an arch type was carried out using Autodesk Revit software. This research was conducted to determine the capabilities and limitations of Autodesk Revit software in modelling arch-type steel frame bridge structures. The modelling in this research uses DED (Detailed Engineering Design) image sources for the Bukit Sulap Bridge project, which were obtained from the PUPR Department of Lubuklinggau City. The modelling carried out is in the form of steel frames, bracing, girder beams and bridge connections.
Biochar and Azolla Effects on Soil Chemical Properties, Lead Content and Growth of Paddy Mayly, Syarifa; Hidayat, Benny
Agro Bali : Agricultural Journal Vol 7, No 1 (2024)
Publisher : Universitas Panji Sakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37637/ab.v7i1.1647

Abstract

The objective of the study was to determine the influences of biochar amendments and Azolla sp application on soil chemical value, lead (Pb) content,  and growth of paddy. The research was conducted in Growth Centre LLDIKTI I, Medan, Sumatera Utara, Indonesia, from April to July 2014. The research design used a factorial randomized block design with three replications. The first factor was Azolla sp application: without Azolla (A0); Azolla pinnata (A1); Azolla mikropilla (A2)] and the second factor was biochar amendment without biochar (B0); RSB-Rice straw biochar (B1),  RHB-Rice husk biochar (B2), CPB-coconut peat biochar (B3), OPB-Oil Palm Empty Bunch biochar (B4)]. The result showed that the biochar amendment treatments had significant differences (P<0.05) in all soil chemical values and growth parameters of paddy. The Azolla application showed significant differences (P<0.05) in plant height, number of tillers, shoot dry weight, root dry weight, and Pb content in the root. The interaction among the Azolla sp and the biochar amendments showed significant differences (P<0.05) in a number of the tillers. It was concluded that the application of rice husk biochar and Azolla microphylla was able to increase soil chemical properties, increase the growth of paddy, and also increase the Pb content in soil, leaves, and roots.
IDENTIFIKASI FAKTOR PENTING DALAM MANAJEMEN MATERIAL PELAKSANAAN PEKERJAAN KONSTRUKSI JALAN Lidya, Vivi Nalty; Ophiyandri, Taufika; Hidayat, Benny
RADIAL : Jurnal Peradaban Sains, Rekayasa dan Teknologi Vol. 12 No. 1 (2024): RADIAL : Jurnal Peradaban Sains, Rekayasa dan Teknologi
Publisher : Universitas Bina Taruna Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37971/radial.v12i1.453

Abstract

Abstrak: Identifikasi Faktor Penting dalam Manajemen Material Pelaksanaan Pekerjaan Konstruksi Jalan. Penelitian ini bertujuan untuk mengindentifikasi proses dan menyusun hirarki fakto penting manajemen material untuk pekerjaan konstruksi jalan. Proyek jalan berbeda dengan proyek gedung, salah satu yang membedakan proyek jalan adalah jumlah material yang dibutuhkan sangat besar, material terbesar berada pada item pekerjaan timbunan. Sehingga dibutuhkan manajemen material dalam konstruksi jalan yang memegang peranan penting dalam menjamin kelancaran dan kualitas proyek. Penelitian ini menggunakan metode kualitatif yang dipakai dengan wawancara mendalam dan untuk pengolahan data menggunakan content analisis serta kuantitatif menggunakan kuesioner yang diolah dengan analytical hierarchy process. Hasil penelitian menunjukan pemilihan material yang ditunjukkan oleh nilai bobot sebesar 31%, hal ini menunjukkan faktor pemilihan material berpengaruh penting dalam proses manajemen material yang juga berdampak terhadap keberhasilan proyek konstruksi sebesar 56%,= berpengaruh terhadap keberhasilan pelaksanaan pekerjaan konstruksi jalan. Selanjutnya faktor penting kedua pada proses manejemen material adalah menjaga persediaan material 16% menunjukan proyek konstruksi yang tepat waktu. Faktor penting ketiga hasil penelitian ini adalah pemilihan pemasok material sebesar 13% menunjukan biaya yang murah dengan mutu yang bagus dengan mempertimbangkan pemasok material yang akan dipilih. Dapat disimpulkan bahwa manajemen material yang efektif dapat meningkatkan kualitas dan hasil akhir proyek konstruksi jalan Kata kunci: Pekerjaan Jalan; AHP; Faktor Penting Manajemen Material
Co-Authors Adrian, Arief Akhmad Suraji Akhmad Suraji, Akhmad Akhyar Jamil Nurman Alra, Yofaldri Anestri, Dhea Riesta Anggraini Rasadi Annisa Utami Arbi, Rustian Ari Septayuda Aziz, Hafid Azrita, Nada Milani Bambang Istijono, Bambang Barasa, Larsen Budi Agus Kombino Budi Agus Kombino Corrady Noveindo Tanwie Daoed, Darwizal Daoed, Darwizal Denny Helard Ella Nurhayati Elsanema, Oktri Erwin, Suendi Faozun, Irfan Fauzi Fauzi Febiana Maulani Febrian, Atharika Yosa Febriani, Rezi Aulia Ferial, Rudy Fetriani, Micky Firdaus Firdaus Firdaus Firdaus Guswandi, Irvan Hadri, Ferdian Al Hafid Aziz Harahap, Adel Emir Fuadi Helmi, Yusvina Heru Tri Saksena Ilham Halich Ilham Hidayat Indra Yustian Indri Miswar Insannul Kamil, Insannul Irwan Yuhesdi JAMILAH Jasmin, Feby Wucika Jayawarsa, A.A. Ketut Khaliq, Daniel Kharimah, Muhammad Ihsanul Kirana Aulia Rahma Lidya, Vivi Nalty Mardhatillah, Fitrawati Mardhiyah, Agil Resfani Mareta, Yanolla Masza, Amelia Meilizar, Meilizar Melinda Noer Miswar, Indri Muhammad Syahid Zidan Mulya, Ayu Marta Novi Hazriyanti Novia, Rika Nur Ulina Warnisyah S Sebayang, Nur Ulina Warnisyah S Ophiyandri, Taufika Ophiyandri, Taufika Ophyandri, Taufika Permata, Nadia Pesela, Regi Citra Purnama, Chanra Purwono, Eko Puteri, Amy Rahmadian Putra, Rifano Putranesia Thaha Putri, Dinda Rahmi Rahmat Fauzan Raju Ramadhan, Farhan Kurnia Regi Citra Pesela Ridwan, Alex Ringga Rahmi Prima Safira, Alya Dara Satria Suwanda Shindy Meuthia Sibayang, Nur Ulina Sudiro, Hari Suranti Pratiwi Syafira, Diana Dwi Syahra, Regina Amanda Syauki, Ilham Ahmad Syofyan, Irfan Andika SYUKRIA, ALFI Taufika Ophyandri Travolindra, Yoga Tri Cahyadi Utama, Yusuf Pria Utami, Fadhillah Rizky Vernando, Vero Gusri Viana, Nazella Putri Wellia, Diana Vanda Widiawan, Aswad Ari Yanni, Rahma Yanolla Mareta Yervi Hesna Yosritzal, Yosritzal Yossyafra Yossyafra Yulinda, Azra Yunita, Azdharizka Yusmarizal, Yusmarizal Zamzamy, Ary ‘Ainaqi, Qorri