FAKTOR YANG MEMPENGARUHI PENGGUNA JASA DALAM MENENTUKAN PENYEDIA JASA KONSTRUKSI DENGAN SISTEM E-CATALOGUE (Studi Kasus: Bidang Bina Marga Pada Dinas BMCKTR Provinsi Sumatera Barat) Mardhatillah, Fitrawati; Hidayat, Benny; Ophiyandri, Taufika
Menara: Jurnal Teknik Sipil Vol. 21 No. 2 (2026): Menara : Jurnal Teknik Sipil
Publisher : Teknik Sipil, Fakultas Teknik Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/jmenara.v21i2.63266

Abstract

Pada tahun 2024, Dinas BMCKTR Provinsi Sumatera Barat mulai menerapkan sistem e-catalogue dalam proses pemilihan penyedia jasa konstruksi berdasarkan Surat Edaran Gubernur Sumatera Barat Nomor 516 Tahun 2023. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor yang memengaruhi keputusan pengguna jasa dalam memilih penyedia jasa konstruksi melalui sistem e-catalogue di Bidang Bina Marga serta menganalisis urutan faktor dan faktor yang paling dominan dalam proses tersebut. Studi dilakukan terhadap kegiatan pengadaan jasa konstruksi tahun anggaran 2024 di lingkungan Dinas BMCKTR dengan menggunakan pendekatan kualitatif melalui wawancara kepada sejumlah informan. Data dianalisis menggunakan metode thematic analysis dan relative importance index (RII). Hasil penelitian menunjukkan bahwa harga merupakan faktor utama yang memengaruhi pemilihan penyedia jasa, dengan nilai RII tertinggi sebesar 0,716. Harga yang kompetitif dan sesuai standar dianggap mampu menjaga kesesuaian anggaran, mendorong kelancaran pelaksanaan, serta meningkatkan transparansi dan stabilitas keuangan proyek. Faktor kedua yang berpengaruh adalah track record perusahaan, dengan nilai RII sebesar 0,552, yang menegaskan pentingnya pengalaman dan reputasi dalam menjamin kualitas hasil pekerjaan. Penelitian ini merekomendasikan pengembangan sistem penilaian digital terintegrasi serta peningkatan kapasitas PPTK/PPKom guna memperkuat objektivitas, efisiensi, dan akuntabilitas dalam proses seleksi penyedia jasa konstruksi melalui e-catalogue.
Analysis of Irrigation Network Operation and Maintenance Performance Improvement in Solok Regency Heaby Virginaldo Vielki Pratama; Benny Hidayat; Taufika Ophiyandri
JACEE (Journal of Advanced Civil and Environmental Engineering) Vol 9, No 1 (2026): April
Publisher : Universitas Islam Sultan Agung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30659/jacee.9.1.1-15

Abstract

Agricultural development is one of the main priorities in supporting sustainable food security, which requires integrated resource management and adequate infrastructure support. Solok Regency is one of the regions that plays a strategic role in supporting national food security; therefore, the performance of irrigation network operation and maintenance is a crucial factor in ensuring the sustainability of agricultural production. However, the implementation of irrigation network operation and maintenance in this region still faces various challenges that potentially reduce the reliability of irrigation services. This study aims to identify problems related to irrigation network operation and maintenance, evaluate their performance, and formulate strategies to improve irrigation network performance in Solok Regency. The urgency of this study is based on the importance of improving irrigation performance as a key support for agricultural productivity and regional food security. This study employs a descriptive qualitative approach, with data collected through field observations, interviews, and document analysis in several irrigation areas. Irrigation system performance was evaluated using the ePAKSI application to obtain the Irrigation System Performance Index (IKSI), while strategy formulation was conducted using SWOT analysis supported by IFAS and EFAS analyses. The results indicate that the operation and maintenance performance of irrigation networks in Solok Regency remains in the poor category, influenced by limited budgets, physical deterioration of irrigation infrastructure, insufficient human resources, suboptimal routine maintenance, and low participation of Water User Associations (P3A). The recommended strategy for performance improvement is the Weaknesses–Opportunities (W–O) strategy, which emphasizes leveraging external opportunities to address internal weaknesses in order to achieve sustainable improvements in irrigation performance.
A LEAN PERSPECTIVE ON POST-DISASTER HOUSING RECONSTRUCTION IMPLEMENTATION IN CIANJUR Dyla Midya Octavia; Taufika Ophiyandri; Akhmad Suraji; Benny Hidayat
Multidiciplinary Output Research For Actual and International Issue (MORFAI) Vol. 6 No. 4 (2026): Multidiciplinary Output Research For Actual and International Issue
Publisher : RADJA PUBLIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.5281/zenodo.21912275

Abstract

Post-disaster housing reconstruction is a critical recovery process that requires not only physical rebuilding but also effective coordination, administrative readiness, technical assistance, and community participation. However, reconstruction programmes often face delays, rework, quality problems, and low beneficiary satisfaction. This study aims to analyse the implementation of post-disaster housing reconstruction after the 2022 Cianjur earthquake from a Lean Construction perspective. A qualitative case study was conducted using institutional document analysis, semi-structured interviews, and field observations. The study involved 24 informants: 10 key informants from the central government, local government, technical actors, and local community leaders, and 14 beneficiary community members. The data were analysed through document review, thematic analysis, process analysis, and interpretation based on Lean Construction principles, including value, waste minimisation, flow, stakeholder coordination, and continuous improvement. The findings show that the reconstruction process in Cianjur was implemented through reimbursement, independent community-based reconstruction, and third-party implementation schemes. Four main implementation problems were identified: beneficiary data inconsistency, administrative complexity, limited technical knowledge and resources, and weak control of third-party implementation. From a lean perspective, these problems represent defects in information flow, overprocessing, resource bottlenecks, value leakage, and process interruptions that reduce value for beneficiaries. The study suggests that future post-disaster housing reconstruction should strengthen beneficiary data management, simplify administrative procedures, balance facilitator workloads, provide early technical education, and improve third-party monitoring to support more efficient, beneficiary-oriented reconstruction.
Kompetensi Tenaga Kerja Kontraktor terhadap Implementasi SMKK Proyek Pembangunan Gedung Fakultas Kedokteran Gigi Universitas Andalas Tahun 2025 Daniel Khaliq; Taufika Ophiyandri; Benny Hidayat
Jurnal Talenta Sipil Vol 9, No 1 (2026): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v9i1.1252

Abstract

The construction industry is recognized as a sector with a high risk of occupational accidents due to the complexity of work activities, the involvement of a large workforce, and the use of hazardous equipment and working methods. To control these risks, the Indonesian government mandates the implementation of the Construction Safety Management System (SMKK) through Regulation of the Minister of Public Works and Housing No. 10 of 2021. However, its implementation in the field is still strongly influenced by the competence of contractor workers, particularly in terms of knowledge, skills, and attitudes toward occupational safety. This study aims to analyze the competence of contractor workers in supporting the implementation of SMKK at the Integrated Skills Laboratory Building Project of the Faculty of Dentistry, Universitas Andalas, in 2025. A descriptive research design with a mixed-methods approach was employed, involving quantitative data collection through questionnaires and qualitative data obtained from observations and interviews. Descriptive analysis was conducted to assess workers’ levels of knowledge, skills, and attitudes toward SMKK implementation. The results indicate that workforce competence is generally categorized as moderate to good; however, weaknesses remain in the consistency of safe work procedure implementation and safety discipline on site. Based on these findings, this study recommends strengthening behavior-based safety training, improving supervisory practices, and implementing continuous workforce development to enhance the effectiveness of SMKK and promote a sustainable safety culture in construction projects.
Critical Factors in Determining the Success of Government Self-Management Projects: A Case Study Irrigation Water Use Acceleration Program/P3-TGAI Vero Gusri Vernando; Taufika Ophiyandri; Benny Hidayat; Micky Fetriani
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.569

Abstract

This research is motivated by the importance of predicting the implementation of a project in the construction field to achieve a success where a project is said to be successful if the project can be completed at a competitive cost, can be completed on time or even faster than the scheduled time, and the quality is achieved. The aim of this study is to determine the critical success factor of government self-management projects (Acceleration Program for Irrigation Water Use Improvement/P3TGAI), so that undesirable things such as cost swells, time delays and others can be predicted as early as possible. This research uses a descriptive method where the populations are community assistance staff (TPM) and Center Management Consultants (KMB) in the program of Acceleration Program for Irrigation Water Use Improvement (P3-TGAI) in the Sumatra V River Basin Center and questionnaires are used as data collection techniques. The results showed that there are 5 determinants of the success of the self-management project for P3-TGAI, such as good communication between parties involved in the project (95.95); appropriate/appropriate work planning (91.89); monitoring of the project by the parties involved (89.19); ability to solve project problems by the parties involved (83.78); proper cost management by the parties involved (83.78). Then, there are 10 aspects that determine the success of P3-TGAI self-management projects, these factors are formed from the highest index in each aspect surveyed.
Evaluation of the Implementation of Payments for Building Construction Projects using APBD Funds According to Contract Law Agil Resfani Mardhiyah; Benny Hidayat; Taufika Ophiyandri
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.683

Abstract

Late payment is a common problem that often occurs in construction projects and can hinder project completion. Previous studies have stated that factors that influence late payment include the financial condition of the project owner and poor business management as well as delays in payment by the project owner and others. Previous studies only discussed the factors that cause late payment. This study aims to identify factors that influence late payment and find solutions to overcome them. The research method used is qualitative with in-depth interviews with parties involved in construction projects, such as PPK and Contractors. Data were processed using interview transcripts and analyzed with thematic analysis to identify emerging patterns or themes. The results of the study indicate that the procedures for implementing payments have been regulated in contracts and related regulations. Factors that cause late payment include poor communication, administrative negligence, empty regional treasury, and unclear regulations. The proposed solution is to conduct training for HR and hold daily or weekly meetings involving all related parties. This research is expected to contribute to increasing payment efficiency in construction projects. This study has limitations, namely the lack of quantitative data and local context, limited samples, focusing on internal factors.
Identifying and Analyzing Risks of Under Bid Price Contracts on Government Construction Projects in West Sumatra Amy Rahmadian Puteri; Akhmad Suraji; Benny Hidayat
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.702

Abstract

This study analyzes the risks associated with under bid price contracts on construction projects in West Sumatra, a phenomenon that shows a significant increase from 7.28% in 2015 to 32% in 2020. This study is focused on the local context of West Sumatra, providing new insights into competitive dynamics and business practices that may be unique to this region, in contrast to previous studies that may be general or regional in nature. The research objective is to identify and analyze the risk factors that arise from this under bidding practice. Through a specially designed questionnaire survey distributed to 30 local contractors in West Sumatra, and data processing using the SIRISPRO application, this study quantified and identified three main risks: specification deviations and design changes, contract criticism, and price increases during execution. The results showed that contractors responded to these risks by conducting evaluation and inspection of specifications, correction of deviations, and evaluation of personnel and acceleration of work. The implication of these findings is the need to evaluate government project contract management policies, particularly related to bidding regulations and more comprehensive bid evaluation, to mitigate the risk of under bidding and ensure the sustainability of quality construction projects in West Sumatra.
Public Knowledge of Simple Earthquake-Resistant Houses after the 2022 Pasaman Earthquake Rezi Aulia Febriani; Taufika Ophiyandri; Benny Hidayat
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.712

Abstract

The 2022 Pasaman earthquake caused significant infrastructure damage, including widespread housing losses. To mitigate future risks, constructing earthquake-resistant homes is crucial. While previous studies by Hariyanto in 2020 examined public awareness of such structures, they did not analyze behavioral changes after major disasters. This study addresses that gap by assessing how the earthquake influenced attitudes and construction practices in Nagari Kajai and Nagari Malampah. Using a quantitative approach, data were collected via a structured questionnaire, adapted from the 2021 BSPS Home Building Construction Guidebook. The survey covered five aspects: building materials, main structure, structural connections, construction quality, and post-earthquake behavioral changes. Accidental sampling was used, with 60 respondents from the two affected areas. Findings show that 60% of respondents have fair knowledge of earthquake-resistant housing, while 20% demonstrate good knowledge and 20% have poor knowledge. Pearson Correlation analysis indicates a weak but significant relationship between knowledge levels and gender (p = 0.002) and age (p = 0.034), while education and occupation showed no significant correlation (p = 0.168 and p = 0.141). Post-earthquake, a shift toward semi-permanent housing structures was observed, highlighting the need for standardized, affordable building regulations. Policymakers should collaborate with local builders to ensure effective knowledge transfer on earthquake-resistant construction. Future reconstruction efforts should integrate post-earthquake evaluations to assess long-term housing resilience.
Bridge Condition Assessment (Case Study: Padang – Bukittinggi Route) Amelia Masza; Benny Hidayat; Taufika Ophiyandri
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.713

Abstract

Bridges are critical components of transportation infrastructure, ensuring smooth traffic flow and regional connectivity. However, their structural conditions are influenced by various factors, including traffic loads, material durability, and natural disasters such as earthquakes and floods. Despite existing bridge maintenance frameworks, a comprehensive condition assessment specifically tailored to the Padang-Bukittinggi route has not been thoroughly conducted. This study introduces a systematic evaluation using the Bridge Condition Rate (BCR) method to provide data-driven maintenance recommendations. A total of eight bridges along the Padang-Bukittinggi route were assessed through detailed and routine inspections, followed by cross-case analysis. The results indicate that 75% of the bridges (6 out of 8) require periodic maintenance (BCR=2), 12.5% (1 bridge) necessitates rehabilitation (BCR=3), and another 12.5% (1 bridge) demands immediate replacement (BCR=5) due to severe structural damage. These findings highlight the urgency of targeted maintenance strategies to enhance bridge longevity and operational safety. The study provides critical insights for policymakers and infrastructure authorities, emphasizing the need for proactive maintenance planning to ensure road network sustainability and public safety.
Analysis of Fulfillment Security, Safety, Health, and Sustainability (K4) Standards Building Construction in Padang City Irvan Guswandi; Akhmad Suraji; Benny Hidayat
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.715

Abstract

Construction services play a crucial role in national development, and providing Safety, Health, and Sustainability (K4) standards is an important aspect in its implementation. This study aims to channel the level of provision of K4 standards in building construction in Padang City from the perspective of stakeholders (Project Owners, Supervising Consultants, and Contractors), and identify areas that need improvement. This research method uses a qualitative approach with semi-structured interview techniques. Interviews were conducted in depth with representatives from each stakeholder to explore information on the understanding, implementation, and challenges related to K4 standards. Data analysis was carried out descriptively qualitatively by identifying themes that emerged from the interviews and comparing them with the applicable K4 standards. The results of the study indicate that the level of provision of K4 standards in building construction in Padang City is not yet optimal. Of the eight criteria containing K4 standards, there are three standards that have been 100% met (material quality standards, quality standards for the results of construction service implementation, and social protection guidelines for workers). However, there are five standards that still need to be improved, namely equipment quality standards (87.50%), occupational health and safety standards (84.37%), construction service implementation procedure standards (97.22%), operational and maintenance standards (66.67%), and environmental management standards (91.20%). The novelty of this study lies in its focus on the stakeholder perspective in evaluating K4 standards. Previous studies tend to view K4 standards from only one perspective, so this study provides a more comprehensive picture. In addition, this study also specifically identifies areas that need to be improved, so that they can be the basis for implementing more effective construction policies. The practical implications of this study are recommendations for more comprehensive construction policies to improve the provision of K4 standards. Local governments and construction associations can use the results of this study to develop more effective training, socialization, and supervision programs. In addition, this study can also be a reference for construction actors to increase awareness and compliance with K4 standards.
Co-Authors Adel Emir Fuadi Harahap Agil Resfani Mardhiyah Akhmad Suraji Akhmad Suraji, Akhmad Akhyar Jamil Nurman Alra, Yofaldri Amelia Masza Amy Rahmadian Puteri Anestri, Dhea Riesta Anggraini Rasadi Annisa Utami Arbi, Rustian Ari Septayuda Arief Adrian Aziz, Hafid Azrita, Nada Milani Bambang Istijono, Bambang Budi Agus Kombino Budi Agus Kombino Chanra Purnama Corrady Noveindo Tanwie Daniel Khaliq Daoed, Darwizal Daoed, Darwizal Denny Helard Diana Dwi Syafira Dyla Midya Octavia Ella Nurhayati Elsanema, Oktri Erwin, Suendi Faozun, Irfan Fauzi Fauzi Febiana Maulani Febrian, Atharika Yosa Ferial, Rudy Firdaus Firdaus Firdaus Firdaus Hadri, Ferdian Al Hafid Aziz Heaby Virginaldo Vielki Pratama Helmi, Yusvina Heru Tri Saksena Ilham Halich Ilham Hidayat Indra Yustian Indri Miswar Insannul Kamil, Insannul Irvan Guswandi Irwan Yuhesdi JAMILAH Jasmin, Feby Wucika Jayawarsa, A.A. Ketut Kharimah, Muhammad Ihsanul Kirana Aulia Rahma Larsen Barasa Lidya, Vivi Nalty Mardhatillah, Fitrawati Mareta, Yanolla Meilizar, Meilizar Melinda Noer Micky Fetriani Miswar, Indri Muhammad Syahid Zidan Mulya, Ayu Marta Nadia Permata Novi Hazriyanti Novia, Rika Nur Ulina Warnisyah S Sebayang, Nur Ulina Warnisyah S Ophiyandri, Taufika Ophiyandri, Taufika Ophyandri, Taufika Pesela, Regi Citra Purwono, Eko Putra, Rifano Putranesia Thaha Putri, Dinda Rahmi Rahmat Fauzan Raju Ramadhan, Farhan Kurnia Regi Citra Pesela Rezi Aulia Febriani Rida Rahim Ridwan, Alex Ringga Rahmi Prima Safira, Alya Dara Satria Suwanda Shindy Meuthia Sibayang, Nur Ulina Sudiro, Hari Suranti Pratiwi Syahra, Regina Amanda Syarifa Mayly Syauki, Ilham Ahmad Syofyan, Irfan Andika SYUKRIA, ALFI Taufika Ophyandri Travolindra, Yoga Tri Cahyadi Utama, Yusuf Pria Utami, Fadhillah Rizky Vero Gusri Vernando Viana, Nazella Putri Wellia, Diana Vanda Widiawan, Aswad Ari Yanni, Rahma Yanolla Mareta Yervi Hesna Yosritzal, Yosritzal Yossyafra Yossyafra Yulinda, Azra Yunita, Azdharizka Yusmarizal, Yusmarizal Zamzamy, Ary ‘Ainaqi, Qorri