Claim Missing Document
Check
Articles

Study of Technical Qualification Evaluation for Construction Work Tender on Under Bid Price Contract Adel Emir Fuadi Harahap; Benny Hidayat; Akhmad Suraji
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.716

Abstract

Based on data from LPSE Padang City for the 2021 and 2022 fiscal years, it was found that one third of the work packages in those fiscal year had an Under Bid Price Contract (UBPC) or an offer with less than 80% of the Owner’s Estimate (OE). The purpose of this study is to examine the conformity between field implementation and technical qualification documents in construction work tenders with less than 80% OE or under bid price contracts in Padang City and its impact on small qualifications. Qualitative analysis based on the results of interviews with implementing contractors from several institutions or agencies involved in the procurement process of goods/services in Padang City was used in this study. This study only focuses on the technical qualifications of construction work tenders on under bid price contracts in Padang City using the tender method and the one-envelope method with a small category Construction Services Business License for the 2023 Fiscal Year. The results of the study show that qualification documents and contract documents with HPS of less than 80% in the implementation in the field are still appropriate. The results of interviews with seven contractors showed that the main equipment and managerial personnel used were also still appropriate. The profit target has been achieved by 4 out of 7 respondents (57.14%) and the remaining 3 out of 7 respondents did not get any profit, this is known from the end of the contract period. 3 out of 7 respondents (42.86%) have minor disabilities and 4 out of 7 respondents do not have minor disabilities. 7 respondents (100%) also did not experience delays in work. 3 out of 7 respondents experienced one contract addendum and the remaining 4 out of 7 experienced two contract addendums.
Inhibiting Factors of the Acceleration of Irrigation Water Use Improvement Program Nadia Permata; Benny Hidayat; Taufika Ophiyandri
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.721

Abstract

Inhibiting Factors of the Acceleration of Irrigation Water Use Improvement Program (P3-TGAI) is a program for rehabilitation, improvement, or construction of irrigation networks based on the participation of farming communities which is carried out in a self-managed or non-contractual manner follow-up to the Ministry of PUPR Directorate General of Water Resources. Based on the evaluation results from Pambudi & Pramujo in 2023, the implementation of P3-TGAI activities at the basic level still encounters various problems, although in general many successes have been achieved. These problems are seen from the aspects of funding transparency, institutional readiness in the field, late determination of target locations, and less than optimal socialization at the farm level. These problems will hamper the aims, objectives, and goals of P3-TGAI activities. In order for the future implementation of this activity to run smoothly, research was conducted to find out what are the inhibiting factors that have the potential to hinder the success of this inhibiting activity in the preparation stage, planning stage, and implementation stage. The research was conducted using a quantitative descriptive method with a questionnaire instrument. The questionnaire was distributed to assistants. From the results of the study, it was found that there were 15 inhibiting factors with a very high influence on the implementation of P3-TGAI activities. 60% of them came from the preparation stage, 27% came from the implementation stage, and the rest (13.3%) came from the planning stage. Of all the inhibiting factors with a very high influence, there is one inhibiting factor with the highest score, namely communication with the community is not good. The solution to poor communication with the community is that the assistants build good emotional relationships with the community, ТPM must often go to the field, and assistants mingle with the community. In terms of general project objectives, inhibiting factors that hinder timeliness are lack of community participation and poor communication and coordination by the community. The inhibiting factors that hinder quality accuracy are the lack of knowledge and experience of the assistants and the lack of socialization to the village community. And the inhibiting factor that hinders cost accuracy is that the community is manipulated by other parties.
Risk Analysis of Project Owners As Actors in the Procurement of Government Goods and Services in Construction Work Arief Adrian; Benny Hidayat; Taufika Ophiyandri
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.725

Abstract

In the implementation of PBJP construction work, potential risks that can affect the achievement of PBJP goals, namely producing the right goods/services according to the budget, but this has still not been researched in the Agam Regency area. Therefore, this study aims to identify and analyze the risks that can occur to Project Owners/Owners (PBJP) in the implementation of construction in the area. The risk identification method was carried out through a pilot survey of project owners as well as previous literature studies. Meanwhile, the risk assessment was carried out using a questionnaire distributed to PBJP actors, referring to the Australian/New Zealand Risk Management standard (AS 4360). Risks are grouped based on their risk levels at various stages, namely planning, procurement, selection, election implementation, and handover. The results of the risk assessment showed that there were no risks with extreme categories, but there were 10 risks with high categories, 53 risks with medium categories, and 1 risk with low categories. The results of this study are expected to contribute to the development of construction risk management policies and practices in the Agam Regency area, as well as provide new insights in research related to PBJP in other areas that have similar characteristics.
Evaluation of Landslide Disaster Management in Sawahlunto Diana Dwi Syafira; Taufika Ophiyandri; Benny Hidayat
CIVED Vol. 12 No. 1 (2025): Regular Issue
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.737

Abstract

Sawahlunto City had a high level of landslide vulnerability due to its hilly topography with steep slopes and clay-dominated sedimentary geological conditions. These characteristics made the area highly susceptible to prolonged heavy rainfall, which acted as the main trigger for landslides. In response, the Regional Disaster Management Agency (BPBD) of Sawahlunto implemented disaster management efforts in the pre-disaster, during-disaster, and post-disaster phases. To evaluate the effectiveness, strengths, and weaknesses of these efforts, an evaluation was conducted along with the formulation of alternative strategies for landslide disaster risk reduction. This study employed a qualitative approach, based on interviews with 26 respondents, including relevant agency representatives and affected community members. A SWOT analysis was used to evaluate disaster management activities by identifying internal (strengths and weaknesses) and external (opportunities and threats) factors. The data were analyzed using thematic analysis to identify key themes based on similarities in the respondents’ statements. The results indicated several strengths, including disaster education programs, the Sitaruna Darling initiative, hazard warning signs, risk assessment documents, community forums, and inter-agency collaboration. Weaknesses included limited structural mitigation, poor drainage management, unregulated development, uneven distribution of disaster education, gaps in the formation of Disaster Resilient Villages, damaged early warning systems, and limited financial and human resources of BPBD. Opportunities involved community interest in disaster education, village fund allocation, technological utilization, a strong local cooperation culture, and potential support from BNPB and local parliament programs Major threats included prolonged high-intensity rainfall, unstable topographic and geological conditions prone to landslides, and low public understanding of landslide disaster risks. The recommended strategies involved enhancing inter-agency synergy, optimizing structural mitigation, strengthening regulations, ensuring equal access to disaster education, developing Sitaruna Darling innovations, improving early warning systems, and utilizing BNPB grants for recovery efforts.
Analisis Kebutuhan Asrama Mahasiswa Dan Konsep Site Plan Kawasan Kampus Universitas Andalas Benny Hidayat; Rida Rahim; Taufika Ophiyandri; Putranesia Thaha
Jurnal Bangunan, Konstruksi & Desain Vol 4 No 1 (2026): Maret 2026
Publisher : Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jbkd.4.1.45-53.2026

Abstract

Penyediaan asrama mahasiswa merupakan salah satu aspek penting dalam mendukung kegiatan akademik dan kehidupan kampus di perguruan tinggi. Seiring dengan peningkatan jumlah mahasiswa, keterbatasan kapasitas asrama yang tersedia di Universitas Andalas menimbulkan kebutuhan akan perencanaan penambahan hunian mahasiswa yang terarah dan terintegrasi dengan pengembangan kawasan kampus. Penelitian ini bertujuan untuk menganalisis kebutuhan penambahan asrama mahasiswa Universitas Andalas serta menyusun konsep site plan kawasan asrama sebagai dasar perencanaan dan pengambilan keputusan institusional terkait student housing. Penelitian ini menggunakan pendekatan deskriptif–analitis dengan memadukan data primer dan sekunder. Data primer diperoleh melalui observasi lapangan, pemetaan lokasi menggunakan foto udara, pengukuran langsung di kawasan asrama, serta dokumentasi kondisi fisik kawasan Kampus Universitas Andalas Limau Manis. Data sekunder meliputi data jumlah mahasiswa, kapasitas asrama eksisting, serta dokumen perencanaan dan kebijakan universitas. Analisis dilakukan dengan membandingkan kebutuhan hunian mahasiswa dan daya tampung asrama yang tersedia, serta mengkaji potensi dan kendala pengembangan kawasan secara spasial dan fungsional. Hasil penelitian menunjukkan adanya kesenjangan antara kebutuhan hunian mahasiswa dan kapasitas asrama eksisting, yang mengindikasikan perlunya penambahan asrama mahasiswa secara bertahap dan terencana. Konsep site plan kawasan asrama yang dihasilkan memberikan arahan pengembangan kawasan yang mempertimbangkan kondisi fisik lahan, keterpaduan fungsi hunian, aksesibilitas, dan hubungan dengan fasilitas akademik kampus. Penelitian ini memberikan kontribusi berupa dasar analitis dan konseptual yang aplikatif untuk mendukung perumusan kebijakan dan perencanaan pengembangan asrama mahasiswa Universitas Andalas.
Co-Authors Adel Emir Fuadi Harahap Agil Resfani Mardhiyah Akhmad Suraji Akhmad Suraji, Akhmad Akhyar Jamil Nurman Alra, Yofaldri Amelia Masza Amy Rahmadian Puteri Anestri, Dhea Riesta Anggraini Rasadi Annisa Utami Arbi, Rustian Ari Septayuda Arief Adrian Aziz, Hafid Azrita, Nada Milani Bambang Istijono, Bambang Budi Agus Kombino Budi Agus Kombino Chanra Purnama Corrady Noveindo Tanwie Daniel Khaliq Daoed, Darwizal Daoed, Darwizal Denny Helard Diana Dwi Syafira Dyla Midya Octavia Ella Nurhayati Elsanema, Oktri Erwin, Suendi Faozun, Irfan Fauzi Fauzi Febiana Maulani Febrian, Atharika Yosa Ferial, Rudy Firdaus Firdaus Firdaus Firdaus Hadri, Ferdian Al Hafid Aziz Heaby Virginaldo Vielki Pratama Helmi, Yusvina Heru Tri Saksena Ilham Halich Ilham Hidayat Indra Yustian Indri Miswar Insannul Kamil, Insannul Irvan Guswandi Irwan Yuhesdi JAMILAH Jasmin, Feby Wucika Jayawarsa, A.A. Ketut Kharimah, Muhammad Ihsanul Kirana Aulia Rahma Larsen Barasa Lidya, Vivi Nalty Mardhatillah, Fitrawati Mareta, Yanolla Meilizar, Meilizar Melinda Noer Micky Fetriani Miswar, Indri Muhammad Syahid Zidan Mulya, Ayu Marta Nadia Permata Novi Hazriyanti Novia, Rika Nur Ulina Warnisyah S Sebayang, Nur Ulina Warnisyah S Ophiyandri, Taufika Ophiyandri, Taufika Ophyandri, Taufika Pesela, Regi Citra Purwono, Eko Putra, Rifano Putranesia Thaha Putri, Dinda Rahmi Rahmat Fauzan Raju Ramadhan, Farhan Kurnia Regi Citra Pesela Rezi Aulia Febriani Rida Rahim Ridwan, Alex Ringga Rahmi Prima Safira, Alya Dara Satria Suwanda Shindy Meuthia Sibayang, Nur Ulina Sudiro, Hari Suranti Pratiwi Syahra, Regina Amanda Syarifa Mayly Syauki, Ilham Ahmad Syofyan, Irfan Andika SYUKRIA, ALFI Taufika Ophyandri Travolindra, Yoga Tri Cahyadi Utama, Yusuf Pria Utami, Fadhillah Rizky Vero Gusri Vernando Viana, Nazella Putri Wellia, Diana Vanda Widiawan, Aswad Ari Yanni, Rahma Yanolla Mareta Yervi Hesna Yosritzal, Yosritzal Yossyafra Yossyafra Yulinda, Azra Yunita, Azdharizka Yusmarizal, Yusmarizal Zamzamy, Ary ‘Ainaqi, Qorri