Claim Missing Document
Check
Articles

RANCANG BANGUN SISTEM PENGEMUDIAN ELEKTRIK PADA MOBIL LISTRIK AGNIJAYA WEIMANA Mustika Wiyasa, I Kd; Satya Kumara, Nyoman; Raka Agung, I Gusti Agung Putu
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p23

Abstract

Electric energy can be used as a substitute for oil fuel. One of the efforts to address air pollution is through the Energy-Efficient Car Contest (KMHE), which emphasizes vehicle efficiency. In this study, the electric propulsion system in the electric car WEIMANA, which focuses on the selection of an electric motor, conducted tests on a BLDC motor to determine the required power of the BLDC motor. In the selection of the electric motor, calculations were made for rolling resistance, aerodynamic resistance of the car, power, and required torque. Based on the discussion's results, the chosen motor is the qs-motor brand with a capacity of 800 W, 500 RPM, torque of 80 Nm, and operating voltage of 48 – 70 VDC. The magnitudes of rolling resistance, aerodynamic resistance of the car, power, and torque are 16.67 N, 7.83 N, 864.7 W, and 59.22 Nm, respectively. The selected motor has been able to propel the WEIMANA car with driver weights of 45 kg, 55 kg, and 65 kg at speeds of 20 km/h and 30 km/h. The highest average power efficiency of the controller is 90.31% with a driver weight of 55 kg. The highest average power efficiency of 88.03% is achieved at a speed of 20 km/h.
STUDI POTENSI DAN PERANCANGAN PLTS APUNG DI DANAU BATUR GUNA MENDUKUNG BALI CLEAN ENERGY Oswald Mangatur, Christian; Setiawan, I Nyoman; Satya Kumara, I Nyoman
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p37

Abstract

The province of Bali has a solar energy potential of 1,254 MW but has only utilized 3.7 MWp up to the year 2020. One of the factors contributing to the slow development of PV in Bali is the need for large land areas for the construction of large-scale PV system. One solution to address the limited land availability for large-scale PV is by utilizing bodies of water through the implementation of floating PV. Lake Batur is the largest lake in Bali and has the potential to serve as a location for floating PV. This research aims to determine the technical potential of floating PV and design a system for floating PV in Lake Batur. With reference to the Lake Batur utilization plan and regulations for the use of floating PV, Lake Batur has a technical potential for floating PV of 76.44 MWp. The design of floating PV in Lake Batur is created with three scenarios. All three scenarios for floating PV show performance ratios within the range of 75-85%. The floating PV system also demonstrates an improvement in performance when compared to ground-mounted PV systems.
ANALISIS EKONOMI RANCANGAN PLTS UNTUK KAWASAN WARISAN BUDAYA DUNIA JATILUWIH Sinaga, P. M.; Ariastina, W. G.; Sukerayasa, I W.; Giriantari, I. A. D.; Setiawan, I N.; Satya Kumara, I N.
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p24

Abstract

Bali is a province in Indonesia that is progressive in utilizing renewable energy, by making a policy to create Bali Clean Energy, which aims to develop renewable energy including solar energy. Even though several Solar Power Plant developments have been carried out in Bali, it still needs to be accelerated in its application to achieve the set targets. In this study, the Jatiluwih Heritage Area was chosen as the location for designing a Rooftop solar power plant. Jatiluwih is a Village that became a World Cultural Heritage designated by UNESCO in 2012. The methods used in this research are interviews, literature studies, and scientific studies based on related journals. This study uses two scenarios, namely the load usage scenario and the roof area scenario. There are 45 buildings that have tourism activities in the Jatiluwih DTW area, with a daily electricity requirement of 225.37 kWh/day. Based on the criteria for installing a Rooftop Solar Power Plant, there were five buildings that met the criteria, namely Dukuh Batur Villa, Teras Subak Homestay, Warung Dhea, Iga Lawar Restaurant, and Bhuana Agung Restaurant. Based on the investment feasibility study using the Net Present Value, Profitability Index, and Payback Period methods, it shows that the investment in designing a Rooftop Solar Power Plant with a scenario based on load requirements has 2 feasible buildings, namely the Iga Lawar Restaurant and Bhuana Agung Restaurant, and based on the roof area scenario it shows the design investment Solar Power Plant Jatiluwih World Cultural Heritage Area is not feasible to implement.
SIMULASI DAN ANALISIS DAMPAK PLTS DAN BESS TERHADAP DROP TEGANGAN PADA SISTEM KELISTRIKAN NUSA PENIDA Pranipata, IND; Kumara, INS; Sukerayasa, IW; Giriantari, IAD; Setiawan, IN; Ariastina, WG
Jurnal SPEKTRUM Vol 11 No 2 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Nusa Penida, Nusa Ceningan, and Nusa Lembongan or known as Tiga Nusa are very famous tourist destinations in Bali Province. The growth of tourism in Tiga Nusa has resulted in demand for electrical energy increasing every year. In order to meet the electrical energy needs in Tiga Nusa, the PLN continues to strive to improve the quality of the Nusa Penida electricity system. One of PLN's efforts is to build a Solar Power Plant that is interconnected with BESS. This research aims to analyze the effect of Solar Power Plant and BESS on voltage drops in the Nusa Penida electricity system. This research was carried out by simulation using electricity system dynamic simulation software. The simulation will be carried out with 3 scenarios. The results of this research are that Solar Power Plant interconnected with BESS has a good influence on the Nusa Penida Electricity System, as evidenced by the simulation results for scenarios 2 and 3 which have better voltage drop values compared to scenario 1.
PERANCANGAN PLTMH SUNGAI YEH HA DI KARANGASEM DENGAN TURBIN CROSSFLOW Virgunia, D. A.; Sukerayasa, I W.; Ariastina, W. G.; Setiawan, I N.; Giriantari, I. A. D.; Satya Kumara, I N.
Jurnal SPEKTRUM Vol 11 No 1 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2024.v11.i01.p29

Abstract

Yeh Ha River in Ababi Village, Karangasem Regency, Bali, is a river that originates from the Yeh Ha springs and is used as a bathing place. This river has the potential for a new renewable energy source that can be utilized for the Micro Hydro Power Plant (MHPP). Discharge measurements were carried out for a week on one of the Yeh Ha spring source channels during the dry season. The results showed an average discharge of 0.201 m3/s. The discharge data used is the minimum potential energy that can be absorbed. Based on the measured discharge data and the used head of 4.6 m, the Tanaka Suiryoku Turbine Selection Chart shows that the crossflow turbine meets the turbine selection criteria. The results of the analysis and calculations show that the available power at the turbine is 8 kW with an efficiency of 80%. A 3-phase synchronous generator with a permanent magnet rotor was selected based on a comparison of the types, specifications, and characteristics of the generator to match the turbine capacity. The output power generated by the generator is 6 kW with a rotational speed of 1500 rpm and a generator efficiency of 90%.
RANCANG BANGUN PROTOTIPE PEMBANGKIT LISTRIK TENAGA SURYA DENGAN SOLAR TRACKER SYSTEM BERBASIS IOT Kresna Aditya, I Putu Gede; Satya Kumara, I Nyoman; Setiawan, I Nyoman
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p20

Abstract

Water is an essential requirement for agricultural land and can be obtained from various sources depending on its geographical location. The Keliki Village Farmers Group in Subak Malikoda faces the challenge of drought, resulting in a shortage of water supply during the dry season. In this research, a Solar Irrigation Pump (SIP) with a solar tracker system is designed to pump groundwater with the aim of enhancing irrigation water supply for Subak Malikoda during the dry season. The solar-powered irrigation pump system design consists of an 18.5 kW submersible pump coupled with a 23.1 kWp PV system using 60 monocrystalline solar modules equipped with a solar tracker and a 30 kW inverter. Based on the analysis conducted, the PVSyst results for the SIP without a solar tracker show that the pump can operate for 6,067 hours with an average water discharge of 274.9 m3/day. This is based on the received global effective irradiation of 1765.1 kWh/m2 in one year. However, with the use of the solar tracker system, the pump can operate for 6,933 hours with a water discharge of 305.2 m3/day and global effective irradiation of 1963.8 kWh/m2 in one year. The analysis concludes that the SIP with a solar tracker system can operate optimally and fulfill the water discharge requirements of Subak Malikoda. This makes the solar tracker system an effective solution to enhance the water supply for Subak Malikoda during the dry season.
SIMULASI DAN ANALISIS DAMPAK PLTS DAN BESS TERHADAP KESTABILAN FREKUENSI SISTEM KELISTRIKAN NUSA PENIDA Harahap, RS; Kumara, INS; Sukerayasa, IW; Giriantari, IAD; Setiawan, IN; Ariastina, WG
Jurnal SPEKTRUM Vol 11 No 2 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The islands of Nusa Penida, Nusa Lembongan, and Nusa Ceningan are some of the famous tourist destinations in Bali. The growth of tourism in the area has increased the demand for electrical energy. PLN is committed to improving infrastructure by building a solar power plant and BESS in Nusa Penida. This research aims to analyze the impact of implementing PLTS and Battery Energy Storage Systems (BESS) on the frequency of the electricity system in Nusa Penida. This research uses a simulation with two scenarios in three different conditions. Scenario 1 is simulated by releasing the Cogindo generating unit from the Nusa Penida electricity system with three conditions, namely an electricity system without PLTS and BESS, an electricity system with PLTS, and an electricity system with PLTS and BESS. Scenario 2 is simulated by removing the Ceningan feeder from the Nusa Penida electricity system with the same three conditions. Simulations were carried out to determine the effect of PLTS and BESS on frequency changes. The simulation results show that frequency changes are still within the limits regulated by the Minister of Energy and Mineral Resources Regulation Number 20 of 2020.
RANCANG BANGUN SISTEM MONITORING TEGANGAN, ARUS, DAN KECEPATAN MOBIL LISTRIK AGNIJAYA WEIMANA Adyana Putra, I Kadek; Satya Kumara, I Nyoman; Raka Agung, I G A Putu
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p25

Abstract

Electric energy can be utilized as an alternative to replace oil-based fuel. One of the steps to address the energy crisis issue is through the Energy-Efficient Car Competition (KMHE), which emphasizes the energy efficiency of vehicles. The WEIMANA team from Udayana University has participated in the Urban Concept category by designing a vehicle named Agnijaya. Agnijaya is an electric-powered car that uses a Brushless DC (BLDC) electric motor. Currently, the Agnijaya electric car does not have a continuous monitoring system for voltage, current, and speed. The research aims to design a monitoring system for the Agnijaya electric car using an SD card as a data storage medium for voltage, current, and speed data. This system is controlled using an Arduino Mega 2560 Pro Mini microcontroller board as the data processor and an SD card as the data storage medium. The monitoring system for the Agnijaya electric car has been successfully designed, built, and tested for voltage, current, and speed values. Testing was conducted by comparing the measured values of voltage, current, and speed, all of which were stored on the SD card. The results of the analysis indicate that the percentage deviation in battery voltage measurement is 0.85%, the deviation in battery current measurement is 0.23%, and the deviation in speed measurement is 0.32%.
POTENSI PRODUKSI PLTS ATAP GEDUNG RUSUNAWA UNIVERSITAS UDAYANA Partogi Manalu, Eli Musa Reja; Ariastina, Wayan Gede; Dwi Giriantari, Ida Ayu; Setiawan, I Nyoman; Sukerayasa, I Wayan; Satya Kumara, I Nyoman
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p16

Abstract

The government will continue to increase the use of new and renewable energy as a solution to meet electricity needs, one of which is the use of rooftop solar power plants. In this research, the location that will be planned to install rooftop PV solar system is the Udayana University Rusunawa Building. The produced energy will be able to meet the electrical energy need and as well as supporting the government programs in the utilization of new and renewable energy. The capacity of the rooftop PV solar system to be installed is determined based on the load profile of the Udayana University Rusunawa Building. Three different scenarios namely 20 kW, 15 kW and 10 kW PV solar systems have been simulated using a PV solar simulator. Results of the simulation scenarios then are compared to look at the differences among the produced energy.
ANALISA KEBERSIHAN PANEL SURYA TERHADAP KELUARAN PLTS ON-GRID 200 KWP BANDARA UDARA SULTAN MUHAMMAD SALAHUDIN BIMA Sandrawati, Syafiatun; Satya kumara, I Nyoman; Setiawan, I Nyoman
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p30

Abstract

Sultan Muhammad Salahuddin Bima Airport is one of the few airports in Indonesia that has PLTS as a supplier of electrical energy. The existence of PLTS at each airport is a concern for further analysis, so that the potential for electrical energy production from PLTS can be optimal. So the solar module which is the main component of PLTS is very important to pay attention to cleanliness from dirt or dust that can reduce the efficiency and electricity production of PLTS. The measurement of PLTS energy production at Sultan Muhammad Salahuddin Bima Airport before cleaning was 567.56 kWh and after cleaning it was 576.86 kWh. In this measurement, cleaning was carried out on a series of 1 Inveter with a total of 100 solar panels. There is a change in energy production from the measurement results. This condition is due to solar panels that have not been cleaned for 1 year. So that the percentage increase in PLTS energy production at Sultan Muhammad Salahuddin Bima Airport is 1.63%.
Co-Authors A. A. Ngurah Bagus Budi Nathawibawa A. Ibi Weking A. Jagad Miftahul Rizqy A.A. Gede Ari Pawitra Putra Abid Surya Bimantara Abinanda , IKPT Adhi Permana Aditya Perdana Putra Purnomo Adyana Putra, I Kadek Agus Mahardiananta, I Made Agus Satrya Wibawa Agus Selamet Duniaji Aldy Allan Ghozali Amien Harist Hardiansyah Ariastina, WG Aries Arimbawa Asep Andang Bayu Widiarsa Kadek Bradley Axelius C. G. Indra Partha Caesar, B Cecep Yudhie Rachmat D. Sitompul D.C. Khrisne D.Y. Manurung Darmawan, I Gede Hadi Derren, M. Dewa Nyoman Tri Budiantara Dewa Putu Ari Laksana Dharmawan, I Made Diky Dwi Girantari, Ida Ayu Dwi Giriantari , Ida Ayu Eka Yulia Indri Christanti Fajar Tri Prabowo Giusna Dipankara Kusnandar Govinda Riawan H. Kristiawan Harahap, RS Hardiansyah, Amien Harist Hasan Dedy Sudono Hendri Noviyanto Pratama I Dewa Gde Yaya Putra Pratama I Gde Ari Biantara I Gede Civavisna Brahma I Gede Dyana Arjana I Gede Hadi Darmawan I Gst Agung Putu Raka Agung I Gusti Agung Putu Raka Agung, I Gusti Agung Putu I Gusti Agung Putu, Raka Agung I Gusti Made Ngurah Desnanjaya I K Agus Setiawan I Kadek Hendy Wijaya I ketut Gede Darma Putra I Ketut Wiryajati I Made Aditya Nugraha I Made Arsa Suyadnya I Made Dwi Jendra Sulastra I Made Ginarsa I Nyoman Budiastra I Nyoman Budiastra I Nyoman Setiawan I Nyoman Setiawan I Nyoman Yudiyana I Pt Agus Surya Adi P I Putu Elba Duta Nugraha I Putu Gde Weda Setyawan I Putu Gede Budisanjaya I Putu Gede Iwan Dwipayana I Putu Indra Saputra I Putu Yudi Pramayasa I W.Y.M. Wiguna I Wayan Indrayana, I Wayan I Wayan Sukerayasa I Wayan Sukerayasa i wayan swi putra I Wayan Swi Putra I. M. R. A Anantajaya I. P. Dharmawan I.G.A.B. Adiputra I.G.A.D. Sasmita I.G.W. Artana I.N. Setiawan I.P.A. Wiranata I.W.B. Darmawan I.W.G.A Anggara Ida Ayu Dwi Giriantari Ida Ayu Putu Febri Imawati Ida Bagus A. Swamardika Ida Bagus Gede Manuaba Ida Bagus Gede Widnyana Putra Ida Bagus Ketut Sugirianta Ida Bagus Leo Mahadya Suta Ida Bagus Putra Setanu M Irwan Octopianus Silaban IW Gunarta J. Pangaribuan Jaya Kusuma, I Kadek Bagus Julius Mahendra Sihombing Junantara, I Ketut Adi Kadek Hari Merta Kadek Sumariana Ketut Vidhia Kumara Komang Bagus Dwi Widiatama Putra Komang Oka Saputra Kresna Aditya, I Putu Gede Lely Meilina Lie Jasa Lintang Pramudya Luh Ayu Sutawati M.R. Wicaksana M.T. S.T. I Wayan Sutaya . Made Dwi Mulyawan Made Pradnyana Ambara, Made Pradnyana Made Puji Dwicaksana Made Sudarma Mas Nyoman Ngadeg A. C. Moch. Farhan Arieffadillah Muhamat, Oscar Muhammad Malik Al Falah Mustika Wiyasa, I Kd N. A. Kartono N. M. A. Wijaya N. Surya Gunawan Natapathy, Ranga Bayu Ni Luh Gede Pivin Suwirmayanti, S.Kom, MT, Ni Luh Gede Pivin Ni Made Ary Esta Dewi Wirastuti Ni Made Neli Lestari Ni Putu Amanda Saraswati Ni Wayan Ernawati Ni Wayan Sri Ariyani NM Karmiathi NMAE Dewi Wirastuti Oswald Mangatur, Christian Oya Iman Sanjaya P.G.G. Priajana Paisal, Muhammad Pande K. B. Sutawan Partogi Manalu, Eli Musa Reja Pramudya, Lintang Pranipata, IND Purna Suartawan, Gede Purnawati, Ita Ayu Purwania Ida Bagus Gede Putra Padang, Christian Felix Putu Martha Risnadinata R. Sapto Hendri Boedi Soesatyo Radha Kurniawan Raka Agung, I G A Putu Rosalia Hadi Rukmi Sari Hartati Rukmi Sari Hartati Sandrawati, Syafiatun Servinus Servinus Servinus, Servinus Setiawan, I N. Setiawan, IN Simon Junior Sinaga, P. M. Siregar, Jhon Septin Maourisdo Sudarma Made Sukerayasa, IW Surung Rafael Sihaloho Syamaidzar, Ahmad Luqyanto Tjok Gede Indra Partha Virgunia, D. A. W G. Ariastina W Widiadha Wayan Gede Ariastina Wayan Gede Ariastina Widagdo, Aris Widiandika Putra, I Wayan Dicky Widyadi Setiawan Windradharama W., A.A. G. Guna Wira Dharma, Gede Agus Wulandari, NKN Yoga Divayana Yogiswara Dharma Putra Yohana Fransisca Sarumpaet Yoppy Hartantio