Strategi Pembiayaan Inovatif untuk Pemeliharaan Infrastruktur Transportasi di Indonesia: Pendekatan Berbasis Value capture: Innovative Financing Strategies for Transportation Infrastructure Maintenance in Indonesia: A Value capture-Based Approach Rully Andhika Karim; Naufal Budi Laksono; Yusuf Latief
Jurnal Manajemen Aset Infrastruktur & Fasilitas Vol 9 No 3 (2025): Jurnal Manajemen Aset Infrastruktur & Fasilitas
Publisher : Departemen Teknik Sipil ITS

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j26151847.v9i3.9839

Abstract

Pemeliharaan infrastruktur transportasi di Indonesia menghadapi tantangan pembiayaan yang signifikan seiring dengan peningkatan kebutuhan infrastruktur yang berkelanjutan. Penelitian ini bertujuan mengeksplorasi strategi pembiayaan inovatif berbasis value dalam pemeliharaan infrastruktur transportasi di Indonesia. Dengan latar belakang keterbatasan anggaran pemerintah, skema Kerjasama Pemerintah dan Badan Usaha (KPBU) dipertimbangkan sebagai solusi untuk mendanai proyek pemeliharaan melalui penerapan Land value capture (LVC) dan Payment in Lieu of Taxes (PILOT). Metode penelitian ini melibatkan kajian literatur dan analisis studi kasus yang relevan untuk mengevaluasi penerapan skema tersebut dalam konteks lokal. Hasil penelitian menunjukkan bahwa kedua mekanisme pembiayaan ini dapat memaksimalkan nilai ekonomi yang diciptakan oleh proyek infrastruktur, yang pada gilirannya dapat digunakan untuk mendanai pemeliharaan jangka panjang. Kesimpulannya, penerapan strategi berbasis value ini berpotensi meningkatkan efisiensi dan keberlanjutan pemeliharaan infrastruktur transportasi di Indonesia, sekaligus mengurangi beban anggaran negara.
The Dynamics of PMO in Construction Companies: A Critical Review Latief, Yusuf; Veronika, Alin
Journal of Project Management Research Vol. 1 No. 1 (2025): Journal of Project Management Research
Publisher : Avenew Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.65303/journalpmresearch.v1i1.5

Abstract

The construction sector has seen Project Management Offices (PMOs) become indispensable, charged with the duty of synchronizing project management techniques with the strategic goals of the organization. As the intricacies of construction projects increase, it is imperative to evaluate the functions, advantages, and obstacles related to PMOs. This analytical review amalgamates current scholarly work to investigate the manner in which PMOs facilitate strategic alignment, operational effectiveness, and the incorporation of technology within construction enterprises. Through a thorough examination of existing literature, the research delves into multiple facets of PMO execution, encompassing strategic functions, operational efficiency, workforce dynamics, technological assimilation, and regulatory frameworks. The results demonstrate that PMOs considerably bolster project management proficiency by harmonizing resources with corporate objectives and refining operational workflows through technological innovations. Nevertheless, challenges remain, such as organizational resistance, bureaucratic inertia, and the hurdles PMOs encounter in evidencing measurable value. These obstacles underscore the necessity for flexible PMO frameworks that integrate Agile practices and utilize emerging technologies such as artificial intelligence and machine learning. Such innovations could enhance predictive capabilities and inform decision-making processes. To fully harness the potential of PMOs, forthcoming research should prioritize the establishment of comprehensive models for assessing PMO efficacy and improving stakeholder engagement approaches. By proficiently articulating the value of PMOs and ensuring their alignment with organizational strategies, construction firms can evolve PMOs from mere administrative support roles into strategic collaborators that foster competitive advantage and sustainable development. This review offers a strategic guide for the effective utilization of PMOs, stressing the significance of aligning their organizational structure with corporate strategies and the dynamic demands of the industry. Through persistent innovation and strategic coherence, PMOs can play a crucial role in enhancing the success and sustainability of construction initiatives within the increasingly competitive global landscape.
Optimizing Dam Maintenance: An Integrated BIM-WBS Operational Model Fitria, Diana Rohmatul; Latief, Yusuf; Saleh, Toha; Laksono, Naufal Budi
Journal of Project Management Research Vol. 1 No. 1 (2025): Journal of Project Management Research
Publisher : Avenew Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.65303/journalpmresearch.v1i1.14

Abstract

This study addresses the challenges of inefficient dam maintenance by proposing and validating an integrated operational model that leverages Building Information Modelling (BIM) and Work Breakdown Structure (WBS).  Traditional dam maintenance often suffers from poor coordination, inadequate resource allocation, and scheduling delays. To overcome these limitations, this research developed a novel model that seamlessly integrates BIM's 3D visualization and data management capabilities with the hierarchical structure of WBS.  A mixed-method approach, combining literature review, expert validation, and a case study application, was employed to develop and evaluate the model.  The resulting operational model demonstrated improved task efficiency, resource optimization, and stakeholder collaboration through real-time task tracking, streamlined workflows, and enhanced prioritization of maintenance activities. Expert feedback confirmed the model's practicality and effectiveness in resolving common maintenance issues, highlighting its potential to improve communication, reduce delays, and increase the accuracy of maintenance planning. The validated BIM-WBS integrated model provides a robust framework for enhancing dam maintenance performance, offering data-driven decision-making and improved stakeholder collaboration. Future research directions include exploring the model's applicability to other infrastructure types and integrating real-time technologies like IoT and AI for predictive maintenance capabilities.
Risk Management for PMO Transformation in Indonesian State-Owned Construction Enterprises Latief, Yusuf; Veronika, Alin; Nisrina, Dhia Tsuraya
Journal of Project Management Research Vol. 1 No. 2 (2025): Journal of Project Management Research
Publisher : Avenew Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.65303/journalpmresearch.v1i2.54

Abstract

This research investigates the critical issue of risk management during Project Management Office (PMO) transformation within the Indonesian State-Owned Enterprise construction industry. The study employs a quantitative methodology to identify key risks that impede effective PMO implementation and to evaluate potential mitigation strategies. Survey data, gathered from a diverse sample of construction professionals in state-owned enterprises are analyzed to establish risk profiles and inform evidence-based recommendations. The findings highlight that operational and policy risks are paramount, emphasizing the importance of standardized processes, clear communication channels, and well-defined governance structures. Results further indicate that effective risk management requires tailored strategies that align with the unique characteristics of the organization and the project portfolio. Key strategies include strong leadership support, a robust change management process, and the alignment of PMO objectives with broader business goals. These results are related to previous research and recommendations based on data analysis, but future research with deep dives into the cases and other type of companies are also proposed. This research contributes to a more nuanced understanding of PMO transformation within a developing economy and provides actionable insights for construction industry stakeholders seeking to enhance project outcomes, improve organizational efficiency, and achieve sustainable development goals.
AVERYL Theory™: Why PMO Transformation Fails—and How Risk Becomes the Catalyst for Strategic Renewal Veronika, Alin; Latief, Ir. Yusuf; Riantini, Leni Sagita
Journal of Project Management Research Vol. 1 No. 1 (2025): White Papers
Publisher : Avenew Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.65303/journalpmresearch.v1i1.78

Abstract

Project Management Offices (PMOs) have become a standard feature of contemporary organisations. Across industries—from infrastructure and construction to IT and the public sector—PMOs are expected to improve delivery discipline, strengthen governance, and translate strategy into execution. Yet despite their widespread adoption, PMO performance remains highly uneven. Many PMOs operate efficiently at an operational level but struggle to demonstrate sustained strategic value, while others undergo repeated restructuring without meaningful transformation.This white paper introduces AVERYL Theory™, a new conceptual lens for understanding why PMO transformation efforts often fail—and how they can succeed. Rather than viewing PMO development as a linear progression of maturity stages, AVERYL Theory reframes PMO transformation as a risk-activated organisational process shaped by internal capabilities, governance tensions, and strategic pressures.At the core of AVERYL Theory lies a counterintuitive insight: risk does not primarily weaken PMO performance; it activates transformation. When risk exposure exceeds organisational tolerance, it exposes structural misalignment and forces change. Transformation is therefore driven not by best practices or benchmarking alone, but by how organisations interpret and respond to risk signals embedded within their PMO systems.Written for executives, PMO leaders, and transformation sponsors, this white paper moves beyond tools, templates, and maturity models. It explains why traditional PMO transformation approaches fall short, how risk functions as a catalyst rather than a threat, and how PMO transformation can be reimagined as a mechanism for strategic renewal.AVERYL Theory™ offers not a single PMO design, but a system-level way of thinking that connects capability, risk, transformation, and performance.
PMO Dual-Track Mechanism: From Delivery Execution to Strategic Value Creation Veronika, Alin; Latief, Yusuf; Riantini, Leni Sagita
Journal of Project Management Research Vol. 1 No. 1 (2025): White Papers
Publisher : Avenew Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.65303/journalpmresearch.v1i1.80

Abstract

Project Management Offices (PMOs) have become a central organisational function for managing projects, programmes, and portfolios. Despite widespread adoption, many PMOs continue to struggle in demonstrating sustained value and strategic relevance. This white paper introduces the PMO Dual-Track Mechanism, a novel, empirically grounded model that explains how PMO performance is generated through two distinct yet interconnected pathways: Execution Track — focused on operational delivery excellence Value Track — focused on strategic alignment and value creation These two tracks are not independent. They are integrated through a critical mediating mechanism: PMO Transformation, which enables the transition from operational efficiency to strategic contribution. The model demonstrates that: Operational capabilities drive direct performance outcomes Strategic capabilities drive indirect performance outcomes through transformation PMO effectiveness emerges from the balance and interaction of both tracks This mechanism provides a new lens for understanding PMO performance, repositioning PMOs from administrative entities to adaptive governance systems and strategic value enablers.
Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance Ulya Ilmi Azhara; Leni Sagita Riantini Supriadi; Yusuf Latief
International Journal of Science and Environment (IJSE) Vol. 6 No. 1 (2026): February 2026
Publisher : CV. Inara in Colaboration with www.stie-sampit.ac.id

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51601/ijse.v6i1.399

Abstract

The construction of large-diameter pipeline bridges plays a strategic role in ensuring the reliability of clean water distribution systems. Nevertheless, such infrastructure projects frequently experience cost overruns and schedule deviations caused by fragmented scope definition, limited integration between planning and cost control, and conventional quantity take-off practices that rely heavily on two-dimensional drawings. These limitations reduce the effectiveness of project monitoring and delay corrective decision-making during construction. This study develops an integrated time and cost control system by embedding a standardized Work Breakdown Structure (WBS) into a 3D and 5D Building Information Modeling (BIM) environment for a Ø1000 mm pipeline bridge project. A mixed-method research approach was adopted, combining expert validation, project document analysis, and quantitative assessment. Project performance was evaluated using Earned Value Management (EVM), while Partial Least Squares–Structural Equation Modeling (PLS-SEM) was applied to examine the causal relationships between WBS integration, 3D modeling, BIM implementation, the time and cost control system, and schedule and cost performance. The results demonstrate that BIM-derived quantities and costs are more consistent and traceable than those obtained from conventional Bill of Quantities (BOQ) calculations, particularly for steel structural and support components that exhibit the highest cost deviations. The integration of WBS with BIM 3D and BIM 5D significantly strengthens activity-level monitoring, improves cost control accuracy, and enables earlier detection of schedule and cost deviations. The proposed framework provides practical decision support for proactive time and cost management in infrastructure construction projects.
Cost Savings In Workshop Building Structures Through Value Engineering Approach Based On Cold-Formed Steel With Integration Of Life Cycle Costing And Risk Evaluation Richard Austen Soegianto; Yusuf Latief
International Journal of Health Engineering and Technology Vol. 4 No. 6 (2026): IJHET MARCH 2026
Publisher : CV. AFDIFAL MAJU BERKAH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55227/ijhet.v4i6.586

Abstract

Workshop building structures commonly use conventional steel materials known for their strength, but they pose challenges in terms of cost, transportation, and time efficiency—particularly in projects located in remote areas. This study aims to optimize the structural cost of Workshop buildings by integrating the approaches of Value Engineering (VE), the selection of Cold-Formed Steel (CFS) material, the Life Cycle Costing (LCC) method, and risk evaluation. VE is applied to identify the primary functions of the structure and propose more efficient alternatives without compromising performance. CFS is selected due to its lightweight nature, ease of transportation and installation, and suitability for remote project locations. The LCC method is used to assess total costs over the building's life cycle, including initial investment, maintenance, and residual value. Risk evaluation is conducted to identify potential technical, operational, and economic obstacles that may affect implementation success. The results show that the use of CFS through VE and LCC approaches can significantly improve cost efficiency compared to conventional steel structures. This approach not only reduces initial project costs but also saves long-term expenses through minimal maintenance and optimal service life. Risk evaluation supports more informed decision-making, making this integrated approach an effective strategy for designing economical, efficient, and sustainable Workshop structures.
Evaluation Of Risk-Based Leadership Systems, Communication Systems, And Decision-Making Processes To Improve Project Time Performance In Indonesian Construction MSME Contractors Fadhil Ahmad Rusydi; Yusuf Latief
International Journal of Health Engineering and Technology Vol. 5 No. 2 (2026): JULY 2026
Publisher : CV. AFDIFAL MAJU BERKAH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55227/ijhet.v5i2.944

Abstract

The construction service industry at the Micro, Small, and Medium Enterprise (MSME) level in Indonesia plays an important role in supporting national development. However, MSME construction companies still face various challenges in achieving project time performance. Project delays in MSME construction companies are generally influenced by weak leadership systems, ineffective communication systems, and suboptimal decision-making processes during project implementation. Therefore, this study aims to analyze the influence of leadership systems, communication systems, and decision-making processes on project time performance, as well as to develop a relationship model among these variables in MSME construction service companies in Indonesia. This study employed a quantitative approach using a survey method through questionnaire distribution to MSME construction service companies in Indonesia. Data analysis was conducted using the Structural Equation Modeling–Partial Least Square (SEM-PLS) method to examine the relationships among the research variables. The independent variables in this study consist of leadership systems, communication systems, and decision-making processes, while the dependent variable is project time performance. The results indicate that leadership systems, communication systems, and decisionmaking processes have a positive and significant effect on project time performance in MSME construction service companies. The communication system was identified as the most dominant variable in improving work coordination, accelerating project information delivery, and reducing the potential for project delays in the field. This study also produced a structural relationship model describing the interaction between leadership systems, communication systems, and decision-making processes in improvingconstruction project time performance within MSME companies. The resulting model demonstrates that the implementation of effective leadership systems, supported by effective communication systems and fast and accurate decision-making processes, can improve the timeliness of construction project completion. The novelty of this study lies in the development of an integrative model that simultaneously connects leadership systems, communication systems, and decisionmaking processes within the context of MSME construction service companies in Indonesia, which remains relatively underexplored in previous studies. This research is expected to serve as a reference for MSME construction companies in improving project performance, particularly in terms of project time performance
A Systematic Review of Change Control in Construction Projects: Causes, Impacts, and Challenges Apriani, Widya; Latief, Yusuf; Riantini, Leni Sagita
Journal of Project Management Research Vol. 2 No. 1 (2026): Journal of Project Management Research
Publisher : Avenew Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.65303/journalpmresearch.v2i1.82

Abstract

Construction projects experience frequent changes that significantly impact time performance. Existing change control systems remain fragmented and lack integration with digital technologies. Throughout the construction project lifecycle, dynamically occurring changes require structured and easily accessible information through the implementation of effective Change Management practices. Change control becomes a crucial element in project management to minimize delays, cost overruns, and conflicts. This study aims to identify critical gaps in current change control practices and propose on change management in construction projects, focusing on the comparison of best practice approaches, industry strategies, as well as opportunities for the development of new methods. Method: A systematic literature review (SLR) was conducted using the PRISMA approach. A total of 790 articles were initially identified, and 121 relevant studies were selected after screening. The findings indicate the existence of various change management systems, but there is no approach that comprehensively integrates knowledge, Work Breakdown Structure (WBS)-based change management, and Building Information Modeling (BIM) technology in one integrated framework. This research informs the development of an evolving change management system in construction project management. The contribution of this research is to provide new insights for academics and practitioners on the importance of technology integration and innovative strategies in construction project change management.
Co-Authors Abdur Rohim Boy Berawi Achirwan Achirwan Afrizal Nursin Agnes Purba Aidil Fitriansyah Alin Veronika Alin Veronika, Alin Alvian Sutekat, Ega Alwan Muhammad Naufal Amalia Dwi Purnamasari Andhika Karim, Dr. Rully Andina Ganesdhi, Gabby Andreas Wibowo Ardiyanto, Fahreza Astrid Dwi Lestari Ayomi D. Rarasati Ayu Herzanita Bambang Trigunarsyah Bambang Trigunarsyah Bambang Trigunarsyah, Bambang Batara Imanuel Sirait Bernadette Detty Kussumardianadewi Budi Nugroho, Danang Dameria Lady Hertina Lumban Raja Danang B. Nugroho Danang Budi Nugroho Darma , Surya Dewi, Febrianti Silviana Djoko M Hartono Dwianditya, I Bayu Dwita Sutjiningsih Dyah Ayu Pangastuti Eddy Subiyanto Edhi Tri Budi Soesilo, Edhi Tri Budi Fadhil Ahmad Rusydi Fadli, Zafira Alysha Fatma Lestari Febriansyah, Eki Hikmah Ferdinand, Joshua Feronica Damanik, Mariana Fitria, Diana Rohmatul Ghazali, Muhammad Ginting, Yan Hasiholan, Yosua Togar Hidayanti, Ranti Hidayawanti, Ranti Idi Namara Imran H. Mohammad Ineswari Syifa Hayuningtiyas, Ineswari Syifa Irfan Fadhila Efendi ISMET ABIDIN Ismeth Abidin Ismeth Abidin Ismeth Abidin, Ismeth Ismeth S. Abidin Ismeth S. Abidin, Ismeth S. Isti Surjandari Jade Sjafrecia Petrociany Janrivai Adiman Silalahi Kurniawati, Eva Andrian Laksono , Naufal Budi Laksono, Naufal Laksono, Naufal Budi Lalitya, Dina Benua Leni Sagita Riantini Leni Sagita Riantini Supriadi Leni Sagita Supriadi, Leni Lestari, Astrid Dwi Luh Putu Ratna Sundari Lusiana Indarwati M. Fanshurullah Asa M. Fanshurullah Asa, M. Fanshurullah Mochamad A. Wibowo Mohammed Ali Berawi Muhammad N. Akram Muhammad Rachmat Muhammad Yusuf Mulyono, Bagjo Naufal Budi Laksono Naufal Budi Laksono Nisrina, Dhia Tsuraya Novika Candra Fertilia Nugroho, Danang Budi Pangastuti, Dyah Ayu Paulus Setyo Nugroho Perdana Miraj Pondaag, Reynard Puja Dewi , Marmelia Putika Yussi Putro, Anggoro Rahayu S. Arifin, Rahayu S. Rahman, Deansa Agya Rarasati, Ayomi Dita Ratih Fitriani Regina Chandra Renti Odor Siahaan Retyaning Utami Retyaning Utami, Retyaning Richard Austen Soegianto Rika Anggraini Rohmatul F, Diana Rosmariani Arifuddin Rossy Armyn Machfudiyanto Saputro, Danang Eko Setyo Sarwanto Moersidik Silalahi, Janrivai Adiman Sutjiningsih M, Dwita Syaifullah, Adrian Toha Saleh Triasa Maryadini Ulya Ilmi Azhara Utami, Retyaning Puji Vincent Gaspersz Wisnu Isvara Yussi, Putika Zaman, Alvian Amaly Fasha Najmu