Marshall Characteristics, Refusal Density and Abrasion Value on Hot Rolled Asphalt (HRA) Mixtures Using Laterite Stone as Replacement Aggregate Syahairony, M.; Naibaho, Pio Ranap Tua
ASTONJADRO Vol. 13 No. 3 (2024): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v13i3.17555

Abstract

This research examines the mechanical performance and durability of various mixtures of laterite material and crushed stone used in asphalt mixes. The materials used included AC 60-70 asphalt from Pertamina, coarse aggregate from crushed stone from a local quarry, laterite stone from a quarry in Central Kalimantan, and fine aggregate from a local quarry. The Marshall tests provided data on stability, flow, density, Volume of Voids in Mineral Aggregate (VMA), Volume of Voids in Mix (VIM), Volume Filled with Asphalt (VFWA), and Marshall Quotient (MQ). The Marshall test on the 100% laterite mixture showed that set A11-A13 had good density with moderate VMA and VIM values, as well as high stability and MQ. The slightly high flow indicated moderate elasticity. Set A21-A23 showed an increase in density with higher VMA and lower VIM, which improved stability but reduced MQ, indicating greater elasticity. Set A31-A33 showed a significant increase in stability and VFWA with higher flow, indicating high elasticity while remaining strong against load. Set A41-A43 had higher density and VFWA, slightly reduced stability, and lower MQ, indicating greater elasticity. Set A51-A53 had the highest density with very low VIM and high VFWA, showing very good cohesion but low stability and high flow, indicating significant elasticity and vulnerability to deformation. In the 50% laterite and 50% crushed stone mixture, set A11-A13 showed good density with moderate VMA and VIM, high stability and MQ, although the high flow indicated moderate elasticity. Set A21-A23 had increased density with higher VMA and lower VIM, resulting in better stability under load but reduced MQ, indicating increased elasticity. Set A31-A33 had significant stability and high VFWA with higher flow, indicating high elasticity but strong resistance to load. Set A41-A43 showed high density and VFWA with slightly reduced stability and low MQ, indicating greater elasticity. Set A51-A53 had the highest density with very low VIM and high VFWA, showing excellent cohesion but low stability and high flow, indicating significant elasticity and vulnerability to deformation. In the 100% crushed stone mixture, density ranged from 2.216 gr/cc to 2.232 gr/cc, indicating a dense and compact mixture. VMA increased from 16.70% to 19.04%, indicating an increased capacity of the mixture to hold asphalt, while VIM decreased from 5.91% to 4.05%, indicating increased density of the asphalt mix. VFWA increased from 64.65% to 78.72%, indicating improved pore filling by asphalt contributing to the cohesion of the mix. Stability ranged from 1,148.8 kg to 1,329.8 kg, indicating the mixture's ability to withstand deformation and load pressure. Stability was fairly high (1,117.84 kg) but lower MQ (291.602 kg/mm) indicated lower resistance to deformation compared to RA1-RA3. Set RC1-RC3 had the same density as RB1-RB3 (2.233 gr/cc), but higher VMA (11.64%) and larger VIM (4.37%), and lower VFWA (62.590%), indicating less efficient pore filling. The lowest stability (887.36 kg) and the lowest MQ (242.191 kg/mm) indicated suboptimal mechanical performance and higher vulnerability to deformation. In the abrasion test using the Los Angeles machine, laterite stone showed an abrasion value of 27.2%, indicating good resistance to abrasion and impact, suitable for construction applications requiring aggregates with high resistance to mechanical wear. Crushed stone experienced a mass loss of 30.9% after the abrasion test, still within the upper limit acceptable for road construction, but this aggregate is more prone to degradation when exposed to heavy traffic loads or extreme weather conditions. Aggregates with high wear tend to be more brittle, which can lead to a decrease in the quality and longevity of roads or structures built.
TIME AND COST MANAGEMENT ANALYSIS OF THE FORMWORK AND REINFORCEMENT WORK (COLUMNS, BEAMS, AND SLABS) FOR THE 2ND FLOOR AMENITIES IN THE OFFICE BUILDING DEVELOPMENT PROJECT OF THE KNOWLEDGE HUB BSD CITY Nosi, Leonardus; Bangun, Sempurna; Sembiring, Kristina; Naibaho, Pio Ranap Tua
International Journal of Civil Engineering and Infrastructure Vol 4, No 2 (2024): IJCEI Volume 4 No. 2
Publisher : University Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/ijcei.4.2.23-36

Abstract

A project is a business activity that is complex, non-routine in nature, has limited time, budget and resources and has its own specifications for the product to be produced. With the existence of several limitations in working on a project, an organization in the project is needed to manage the resources (equipment, budget, and workforce) owned so that they can carry out synchronous activities so that the project objectives can be achieved. In construction projects every building material uses concrete material, which in practice, especially in the last 10-20 years, concrete has been increasingly used. To obtain the planned concrete shape and to harden it, we need formwork or moulds. The Knowledge Hub BSD City office building project is built on an area of 1.1 hectares covering a building area of 54,956 m2 consisting of 11 floors. This location is located on Jalan Raya BSD Barat, Sampora, Cisauk District, Tangerang Regency, Banten Province. The research objective for the analysis of these calculations starts from calculating the duration of each job based on cost and time calculations obtained from existing technical drawing data. The research method used is the calculation of formwork (columns, beams and slabs) through the Microsoft Excel application.
ANALYSIS OF THE RELATIONSHIP BETWEEN COMPRESSIVE STRENGTH AND BENDING STRENGTH OF CONCRETE WITH FC 30 MEGAPASCAL (MPA) Budiarto, Rika; Azhar, Moh; Bangun, Sempurna; Naibaho, Pio Ranap Tua
International Journal of Civil Engineering and Infrastructure Vol 4, No 2 (2024): IJCEI Volume 4 No. 2
Publisher : University Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/ijcei.4.2.73-81

Abstract

With the rapid development in the field of construction, various material innovations are increasingly emerging, especially in concrete. Concrete is in high demand for its durability, resistance to pressure, and low maintenance costs. Made from a growing mix of cement, coarse aggregate (split), fine aggregate (sand), water, and additives, concrete is becoming a top choice in modern infrastructure. This study aims to explore the relationship between compressive strength and flexural strength in 30 MPa quality concrete. The method used was a laboratory experiment with cylindrical and block-shaped test pieces, which were tested at the ages of 7, 14, and 28 days. The main materials used include coarse and fine aggregates, water, fly ash, and Portland type I cement. The study measured the compressive strength values of concreate, and evaluated the formula  \(fs=0.62√(fc^' ) \) as stated in SNI 2847:2013 to test its relevance to this quality concrete. The results showed that the flexural strength increased with the age of the concrete, with the largest difference between compressive strength and flexural strength at 1.3%. These findings support a deeper understanding of the performance of concrete at a given age and the relevance of the standard formula for 30 MPa quality concrete.
ANALYSIS OF COST AND TIME CONTROL ON THE LIBRARY CONSTRUCTION PROJECT OF THE POLICE TRAINING INSTITUTE USING THE EARNED VALUE Xena S P, Canda; Bangun, Sempurna; Dewita, Hikma; Naibaho, Pio Ranap Tua
International Journal of Civil Engineering and Infrastructure Vol 4, No 2 (2024): IJCEI Volume 4 No. 2
Publisher : University Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/ijcei.4.2.1-12

Abstract

In a construction project, the factors that become indicators of the success of a project are that it must be cost, time and quality that can be achieved by planning, scheduling, and controlling its implementation properly. The method used to analyze data regarding cost control and project implementation time so that it can be effective and efficient is to use the concept of the value of the results (Earned Value Concept). From the data that has been obtained, the next step is to calculate the work weight for each item. Then an analysis of cost and time control is carried out using several approaches, namely: BCWS, BCWP and ACWP. The results of project data processing use the analysis calculation of the result value method. From the calculation of the Schadule Variance (SV) the work accelerates 1 week from the predetermined schedule. the total schedule/schedule 17 weeks of work and the results of the calculation on the 17th week is 2,710,716.28. Showing a positive number, this indicates that the implementation of the work is faster than the planned schedule. From the results of the calculation of Cost Variance (CV) the work has accelerated by 1 week from the predetermined schedule. week 17 is 2,011,321,591.90. Showing a positive number, this indicates that the cost to complete the project is less than the planned cost. The calculation result of the Schedule Performance Index (SPI) that the work has accelerated 1 week from the predetermined schedule. In week 1 to week 17 of 1.00, it shows that the project was carried out on time. The results of the calculation of the Cost Performance Index (CPI) of work accelerated by 1 week from the predetermined schedule. In the 1st week to the 17th week of 1.00 indicates that the work in the field costs in accordance with the planned budget
Handling Of Unsignalized Intersections (Simpang Haji Rais) In South Tangerang City Heris Cahya Kusuma; Tjahjani, AR Indra; Naibaho, Pio Ranap Tua
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 10 No 1 (2025): MARET
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v10i1.1336

Abstract

The H. Rais intersection in South Tangerang City is an intersection with three arms without traffic signals. Simpang H. Rais is a meeting of three roads, namely Jl. H. Jamat Gg. Rais, Jl. Puspitek Segment 1, and Jl. Puspitek Segment 2. This intersection often experiences long queues due to inadequate intersection capacity so that it is unable to accommodate the volume of vehicles during morning and evening rush hours. The research method used was a direct survey method at the research location to collect traffic data at Simpang H. Rais and the surrounding roads. From the research results, the average length of the queue before handling during peak hours on weekdays is 168.52 m and delays are 35,471 with a level of service (LOS) D, while the average length of the queue before handling during peak hours on holidays is 119 .82 m and a delay of 33.52 with a level of service (LOS) D. In the next 5 years, the performance of Simpang H. Rais before handling will become worse with the result that the average queue length during weekday peak hours is 219.64 m and a delay of 49,137 with an intersection service level (LOS) E, while the average queue length during holiday peak hours is 218.28 m and a delay of 43,635 with an intersection service level (LOS) E. Handling is being carried out at Simpang H. Rais in short-term scenario 1 is by fulfilling road equipment facilities and assigning traffic officers, and in short-term scenario 2 by widening the bend radius to a minimum of 7.8 m and widening the H. Jamat Gg road section. Rais becomes 6 m, while the treatment carried out at Simpang H. Rais in the long term is to change the Puspitek road type to 4/2-T with a width per direction of 6 m.
ANALISIS PERBANDINGAN DETAIL ENGINEERING DESIGN DENGAN REALISASI STUDI KASUS GEDUNG GREEN HOUSE DISPLAY BRIN CIBINONG BOGOR Naibaho, Pio Ranap Tua; Daryanto, Eka; Wujaya, Kinanti
Jurnal Insinyur Profesional Vol. 4 No. 1 (2024): Jurnal Insinyur Profesional
Publisher : Universitas Negeri Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24114/jip.v3i2.42545

Abstract

ABSTRAKGreen House Display yang berlokasi di Cibinong, Kabupaten Bogor, Jawa Barat merupakan sebuah bangunan rumah kaca (greenhouse) yang dibangun untuk mendukung pelestarian dan perbanyakan plasma nutfah tumbuhan potensial Indonesia. Greenhouse tersebut juga berperan dalam memperkenalkan keanekaragaman hayati Indonesia dan mempercepat penyebaran ilmu hayati strategis ke masyarakat. Bangunan tersebut memiliki design yang unik, berbentuk seperti bunga Rafflesia Arnoldi, dan memiliki dua kelopak atau dome. Material bangunan tersebut menggunakan beton dan baja yang di mana material baja digunakan untuk atap sedangkan material beton untuk komponen struktur lainnya seperti kolom, balok, dan pelat lantai. Seiring berjalannya proses pembangunan, terdapat beberapa perubahan design dari rencana awal Detail Engineering Design (DED), karena kebutuhan di lapangan dan faktor keamanan dari bangunan. Penelitian ini bertujuan untuk mengetahui perbandingan antara rencana design awal dan realisasi di lapangan, untuk keperluan analisis, peneliti menggunakan software Tekla Structural Designer. Dari hasil analisis menggunakan software Tekla Structural Designer, terdapat perbedaan dari realisasi di lapangan dengan Detail Engineering Design (DED).  Perubahan tersebut terdapat pada kolom K15 pada area tengah dome utama dan penambahan balok pada bagian Ramp dome utama. Pada rencana awal (DED) kolom K15 yang merupakan kolom freestanding, terdapat perubahan design yang terealisasi di lapangan, kolom tersebut dihubungkan oleh balok dan pelat lantai guna untuk menambah kekuatan struktur. Perubahan selanjutnya terjadi pada Ramp dome utama yang ditambahkan balok pada kedua sisi pelat lantai Ramp yang berfungsi untuk meredam getaran. Kata kunci: Green House Display, Analisis perbandingan, Tekla Structural DesignerABSTRACTThe Green House Display, located in Cibinong, Bogor Regency, West Java, is a greenhouse building built to support the preservation and propagation of Indonesia's potential plant germplasm. The greenhouse also plays a role in introducing Indonesia's rich culture and accelerating the dissemination of life science strategies to the public. The building has a unique design, shaped like a Rafflesia Arnoldi flower, and has two petals or a dome. The building materials use concrete and steel where steel material is used for roofs while concrete material is used for other structural components such as columns, beams, and floor plates. As the development process progresses, there are several design changes from the initial Detail Engineering Design (DED) plan, due to field requirements and the safety factor of the building. This study aims to determine the comparison between the initial design plan and the realization in the field. For analysis purposes, researchers use the Tekla Structural Designer software. From the results of the analysis using the Tekla Structural Designer software, there are differences from the realization in the field of Detail Engineering Design (DED). These changes are found in the K15 column in the center area of the main dome and the addition of beams in the main Ramp dome. In the initial plan (DED) of the K15 column which was a freestanding column, there was a design change that was realized in the field, the column is connected by beams and floor slabs to increase the strength of the structure. Subsequent changes occurred in the main Ramp dome which added beams on both sides of the Ramp floor plate which functioned to dampen vibrations.Keywords: Green House Display, Comparative analysis, Tekla Structural Designer
THE ASSISTENCE AND PERFORMANCE EVALUATION OF THE WORKFORCE FACILITATOR PROGRAM OF INHABITABLE HOUSING IN TANGERANG DISTRICT Puro, Sarjono; Maria, Kiki; Manurung, Edison H.; Naibaho, Pio Ranap Tua; Imanto, Yuwono
International Journal of Engagement and Empowerment (IJE2) Vol. 5 No. 1 (2025): International Journal of Engagement and Empowerment
Publisher : Yayasan Education and Social Center

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53067/ije2.v5i1.199

Abstract

The Tangerang Regency Housing, Settlement and Cemetery Service (DPPP) supports regional performance achievements in improving environmental management for sustainable development, especially in the residential infrastructure sector. The 2024 RTLH Program, still the Tangerang Regency's Leading Program in the Sub-districts, aims to help people living in houses whose conditions do not meet health and safety standards. The impact of RLTH on residents/recipients of assistance includes social and economic effects. The role of all parties is vital, and the community's increased participation in the successful development that has been implemented can be felt by the community in developing Tangerang Regency. One of the roles in the success of the RTLH program in Tangerang Regency is the Field Facilitator (TFL), who collaborates with experts, both technical and empowerment, and the RTLH Community Forum (Formas) to improve RTLH development. TFL assistance and evaluation are for DPPP recommendations on TFL performance. The method of implementing evaluation activities uses several techniques, namely observation, interviews, discussions, written tests and documentation. From the evaluation results carried out by experts and representatives of the Tangerang Regency DPPP, it was found that 4 (four) TFL workers out of 23 TFLs were absent and received the lowest score. TFLs who are absent are deemed not to have committed to carrying out the duties and responsibilities that have been determined and agreed upon.
ANALISIS PERHITUNGAN STRUKTUR BUNKER AKSELERATOR ELEKTRON ENERGI TINGGI MENGGUNAKAN ETABS Hutagalung, Jethro Lukito; Naibaho, Pio Ranap Tua; Sembiring, Kristina
Journal of Sustainable Civil Engineering (JOSCE) Vol. 6 No. 02 (2024): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v6i02.3611

Abstract

Badan Riset dan Inovasi Nasional (BRIN) sedang mengembangkan Gedung Akselerator Elektron Energi Tinggi (AEET) di Lebak Bulus, Jakarta Selatan, sebagai bagian dari upaya untuk mendukung penelitian dan inovasi ilmiah di Indonesia. Salah satu komponen utama dalam proyek ini adalah pembangunan Bunker yang dirancang untuk memiliki ketahanan tinggi terhadap radiasi dan gempa bumi, dengan mempertimbangkan wilayah Indonesia yang rawan gempa. Desain Bunker ini memperhitungkan percepatan gempa dasar (Peak Ground Acceleration atau PGA) sebesar 0,3g sesuai dengan kondisi geologis setempat. Penelitian ini bertujuan untuk menganalisis dan menghitung ulang struktur kolom dan pelat bunker AEET sesuai dengan Standar Nasional Indonesia (SNI). Metode penelitian yang digunakan meliputi studi literatur untuk memahami teori dan standar yang relevan, pengolahan data lapangan, pemodelan struktur menggunakan software ETABS, analisis gaya dalam, serta perhitungan manual menggunakan Excel untuk memverifikasi hasil pemodelan. Hasil penelitian menunjukkan bahwa struktur kolom dan pelat bunker AEET mampu menahan beban aksial, geser, dan momen yang terjadi selama operasional, serta memenuhi seluruh persyaratan keamanan dan ketahanan gempa sesuai standar SNI. Desain ulang yang dilakukan meningkatkan keamanan struktur dan memastikan operasional yang aman dan efisien dalam jangka panjang. Penelitian ini juga merekomendasikan penggunaan material modern dan penerapan sistem pemantauan struktural secara real-time untuk memastikan keberlanjutan dan keselamatan fasilitas ini di masa depan. Penelitian ini memberikan kontribusi penting dalam pengembangan infrastruktur penelitian di Indonesia, memastikan bahwa fasilitas AEET tidak hanya berteknologi canggih, tetapi juga aman dan tangguh dalam menghadapi kondisi geologi yang menantang.
REINFORCED CONCRETE BEAM AND COLUMN PROGRAMMING BASED ON SNI:2847-2019 ON SMARTPHONE USING TEXAS INSTRUMENTS Bagio, Toni Hartono; Baggio, Eugene Yudhistira; Mudjanarko, Sri Wiwoho; Naibaho, Pio Ranap Tua
ASTONJADRO Vol. 10 No. 2 (2021): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v10i2.5101

Abstract

The development of technology in the last few years can not be denied that it has developed very rapidly. In building construction, reinforced concrete beam and columns calculations also utilizing that technology development. Input data used to calculate reinforcement of beam and column are material property, section property and internal forces. Calculation of reinforcement beam using quadratic equation method and reinforcement column using Newton-Raphson method and divided-by-two method.Calculation results are flexural reinforcement As (longitudinal compression area) and As' (longitudinal tension area), shear reinforcement Av (transversal area) and S (distance of  Av), torsional reinforcement Avt (transversal area due to torsional and/or shear), S (distance of Avt), Along (longitudinal area due to torsional buckling), column circular reinforcement Atot (total of longitudinal area), column rectangular two faces reinforcement Atot (total of longitudinal area), column rectangular four faces reinforcement Atot (total of longitudinal area), column biaxial reinforcement Atot (total of longitudinal area).   The program determines As, As' and Atotal, the code is written using the Texas Instruments programming language, so that it can be applied to smartphones. Smartphone and manual calculation, for all cases not more than 5%, the calculation using Texas Instrument is accurate.
Review of Clean Water Supply System Development's Feasibility in Indonesia's Samosir Regency Sitohang, Oloan; Munthe, Kornel; Manurung, Edison Hatoguan; Naibaho, Pio Ranap Tua; Wardiningsih, Sitti
INERSIA lnformasi dan Ekspose Hasil Riset Teknik Sipil dan Arsitektur Vol. 19 No. 1 (2023): May
Publisher : Universitas Negeri Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21831/inersia.v19i1.54197

Abstract

Around 15,352 families (42.66 percent) in Samosir Regency still have access to clean water, which is still a rather low percentage compared to the remaining 20,638 families (57.34 percent) who do not. The local government is concerned with this situation in order to create the BUMD PDAM Samosir Regency. This research was done to see if it would be possible to start a local water firm in Samosir Regency. In order to determine whether there is a potential water source that is adequate, sustainable, and manageable economically and profitably in the context of public services, as well as whether the establishment of PDAM Samosir Regency is worth reviewing, interviews and questionnaires were distributed to the community, SPAM owners, and State Civil Servants. In addition to socioeconomic factors, there are financial factors, market factors, legal factors, managerial factors, organizational factors, and technical factors. Legal, social and economic, technical, and notably from economic considerations with IRR = 72.32> I = 12 percent / year, PP = 3.34, and BCR = 6.27, BUMD PDAM Samosir Regency is viable to be founded