Claim Missing Document
Check
Articles

Studi Perbandingan Kualitas Batubara Berdasarkan Analisis Proksimat pada Dua Seam dengan Variasi Kedalaman di PIT North PT Karya Putra Borneo Alvian George Devandrie; Windhu Nugroho; Lucia Litha Respati; Agus Winarno; Harjuni Hasan
Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan Vol. 4 No. 2 (2026): Mei: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/globe.v4i2.1378

Abstract

This research aims to compare coal quality based on proximate analysis in two seams with varying depths in Pit North and evaluate the relationship between depth and coal quality parameters. The research method includes taking representative samples at each seam and proximate analysis laboratory testing including inherent moisture, ash content, volatile matter, and fixed carbon. The results showed that seam 1 at an average depth of 59.8 m had an inherent moisture value of 13.51%, ash 4.68%, volatile matter 39.93%, and fixed carbon 41.88%, while seam 2 at an average depth of 82.1 m had inherent moisture 13.42%, ash 4.59%, volatile matter 40.15%, and fixed carbon. 41.84%. Correlation analysis shows that the relationship between depth and coal quality parameters is relatively weak with correlation coefficient values ​​ranging from −0.36 to 0.25 and a low coefficient of determination, so that variations in depth do not have a significant influence on coal quality at the research location.
Estimasi Sumberdaya Batubara berdasarkan Data Ekplorasi Pengeboran dan Geophysical Logging pada Pt.Ansaf Job Site Pt.X Kalimantan Timur A. Agus Mantri; Windhu Nugroho; Albertus Juvensius Pontus; Shalaho Dina Devy; Koeshadi Sasmito
Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan Vol. 4 No. 2 (2026): Mei: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/globe.v4i2.1384

Abstract

At the research location at PT. Ansaf Inti Resource, there are several mining stages such as exploration. In the exploration itself, drilling and logging activities are carried out. However, if not careful in calculating coal resource estimates, there can be potential discrepancies between the estimated coal resources based on the results of drilling data identification and well logging data with the actual results. Exploration activities are activities that are often carried out by companies to determine reserves in an area. Without carrying out these activities, companies will have difficulty estimating the profits to be obtained. To obtain the data needed to carry out exploration activities such as calculating the quality and quantity of coal, it is necessary to carry out drilling such as the full coring method and also carry out logging activities to complete the data and also as comparative data from core drilling. Coal Resources are part of a coal deposit in the form of a certain quantity and have reasonable prospects that allow for economic consideration. Coal resources are divided according to the level of geological confidence into inferred, indicated, and measured categories. Therefore, in this study, the author will calculate coal resources from exploration data collection such as coring data, cutting data, and well logging data as well as coal quality data and process it in Minescape 5.7 software so that it can obtain an estimate of coal resources for each seam at the research location.
Studi Produktivitas Coal Crusher Plant dalam Upaya Pencapaian Target Barging Pada PT. Bukit Biduri Energi Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur Irfan Sauri; Harjuni Hasan; Henny Magdalena; Windhu Nugroho; Agus Winarno
Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan Vol. 4 No. 2 (2026): Mei: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/globe.v4i2.1389

Abstract

Bukit Baiduri Energi is a coal mining company operating in Bukit Raya Village, Tenggarong Seberang District, Kutai Kartanegara Regency, East Kalimantan Province. The coal produced has different sizes so it cannot be sold directly. Therefore, it is necessary to carry out a grain size reduction process (crushing) to meet market needs (buyers). The production target of the crushing unit is 128,000 tons/month, based on actual observations in the field, it only produces 110,065.27 tons/month, which means the crusher plant unit only produces 86%, still lacking 14%. Productivity at CP-01 is 317.73 tons/hour and CP-02 is 214.47 tons/hour. The production target has not been achieved due to several constraints (technical and non-technical), it is necessary to conduct a constraint time analysis using a Pareto diagram to determine the efforts that must be made to achieve the production target. For the work efficiency value at CP-01 it is only 27.04% and for CP-02 it is only 31.21 and for the value of the availability of working time of the crusher plant unit, the value at CP-01 is MA = 81.94%, PA = 28.75%, UA = 90.04%, EU = 27.04% and at CP-02 it is MA = 83.31%, PA = 32%, UA = 94% and EU = 30%. The production of the crusher unit after improving the working time constraints is able to produce 328,021.15 tons/month.
Pengaruh Daya Tampung Settling Pond untuk Pengendalian Air Tambang PT Victor Dua Tiga Mega, Barito Utara, Kalimantan Tengah M. Sohib Prabowo; Harjuni Hasan; Rety Winonazada; Shalaho Dina Devy; Windhu Nugroho
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 4 No. 3 (2026): Juli: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipi
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v4i3.1505

Abstract

Settling pond is a mine water control facility used to temporarily store pumped mine water before it is discharged from the mining area. This study aimed to determine the storage capacity of the settling pond, evaluate the effect of pump discharge on its storage capacity, and develop a redesign to prevent overflow at Pit 7, Luwe Site, PT Victor Dua Tiga Mega, North Barito Regency, Central Kalimantan Province. The study employed field measurements of the settling pond geometry, pump discharge measurements using a flowmeter, sediment thickness measurements using the sounding method, and storage capacity analysis based on the Decree of the Minister of Energy and Mineral Resources No. 1827 K/30/MEM/2018. The results showed that the settling pond had a geometric capacity of 6,779.50 m³, while the incoming pump discharge reached 23,748.29 m³/day, indicating that the existing capacity was insufficient and had the potential to cause overflow. Based on the evaluation, the recommended pump discharge was 4,541.24 m³/day, accompanied by a redesigned three-compartment settling pond with a storage capacity of 24,400 m³, meeting the required capacity specified in the ministerial regulation.