Claim Missing Document
Check
Articles

Development of a Framework for Risk-Based Integrated Safety Audit to Enhance Construction Safety Performance Danang B. Nugroho; Yusuf Latief; Mochamad A. Wibowo; Rosmariani Arifuddin; Fatma Lestari; Muhammad N. Akram
Civil Engineering Journal Vol 10, No 3 (2024): March
Publisher : Salehan Institute of Higher Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28991/CEJ-2024-010-03-08

Abstract

Presently, there is a notable surge in infrastructure development, leading to a heightened occurrence of accidents within the construction sector. This trend has positioned the construction industry as one of the most accident-prone areas compared to other sectors. This suggests that the current construction safety audit procedures have not proven effective in preventing accidents. Typically, audits are conducted primarily during the construction phase, with infrequent assessments during the design phase. According to the Szymberski theory, actions taken during the design phase significantly influence the occurrence of accidents more than those taken during construction. Previous research has discussed a lot about safety management systems. However, it has not discussed how to assure the quality of its implementation. Considering this, the research aims to (a) identify the processes, elements, activities, sub-elements, objectives, criteria, and risks associated with construction safety audits and (b) formulate an integrated, risk-based audit process covering both the design and construction phases. This qualitative research employed the Delphi method to gather insights from construction safety experts, and the developed audit process utilized a risk management approach. The resulting audit process integrates principles from ISO 19011:2018 and Regulation of the Minister of Public Works and Housing Number 10 of 2021. The findings revealed 34 activities in audit program management, 34 activities in audit implementation, and 32 sub-elements in audit criteria. These components are incorporated into a comprehensive construction safety audit framework, organizing audit processes, activities, and criteria. This framework underscores that improving construction safety performance is not solely confined to the construction phase but extends to the design phase as well. The audit results serve as a foundation for continuous improvement, aiding in enhancing safety performance and preventing accidents within the construction industry. Doi: 10.28991/CEJ-2024-010-03-08 Full Text: PDF
Pengembangan Standar Work Breakdown Structure (WBS) Pekerjaan Pemeliharaan dan Perawatan Struktur Atas Jembatan Beton Berbasis Risiko untuk Meningkatkan Kinerja Keselamatan Konstruksi Laksono, Naufal; Hasiholan, Yosua Togar; Latief, Yusuf; Saputro, Danang Eko
Jurnal Teknik Sipil dan Lingkungan Vol. 9 No. 1: April 2024
Publisher : Departemen Teknik Sipil dan Lingkungan, IPB University and The Institut of ENgineering Indonesia (PII), Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kondisi kritis jembatan indonesia dimana hanya 1,2% dari total 18.990 jembatan nasional yang berada dalam kondisi baik di Indonesia, menunjukkan tingginya urgensi pemeliharaan infrastruktur jembatan. Pekerjaan pemeliharaan dan perawatan menjadi aspek krusial untuk memastikan kualitas dan kelangsungan jembatan. Dalam konteks proyek konstruksi, pengembangan Work Breakdown Structure (WBS) pada tahap perencanaan dianggap sebagai elemen penting untuk menjamin kesuksesan proyek. Standar WBS berbasis risiko menjadi alat kunci dalam mengidentifikasi risiko pekerjaan dengan merinci setiap tahap hingga paket pekerjaan, efektif mengurangi dan mengendalikan potensi risiko kecelakaan kerja.Penelitian ini bertujuan mengembangkan standar WBS berbasis risiko khusus untuk pekerjaan pemeliharaan struktur atas jembatan beton. Standar yang dihasilkan terdiri dari 6 level, mencakup 27 variabel risiko dominan, dan menyajikan 3 rekomendasi respons risiko yang dapat diadopsi. Implementasi standar WBS ini diharapkan dapat meningkatkan kinerja keselamatan konstruksi, terutama dalam pengelolaan sumber daya dan pelaksanaan monitoring yang lebih baik. Sebagai panduan holistik, standar ini menjadi landasan untuk optimalisasi pekerjaan pemeliharaan, menjaga kualitas infrastruktur, dan mengurangi risiko potensial dalam proyek konstruksi. Dengan demikian, standar ini diharapkan dapat menjadi kontribusi signifikan dalam memperkuat keselamatan konstruksi, memajukan kualitas infrastruktur, dan menekan risiko potensial dalam proyek konstruksi di Indonesia.
Development Of Risk-Based Audit Method Standard For Stadium Project Using Design And Build Contract To Minimize Dispute Based On Inspectorate Perpective Ferdinand, Joshua; Putro, Anggoro; Latief, Yusuf
International Journal of Science, Technology & Management Vol. 4 No. 1 (2023): January 2023
Publisher : Publisher Cv. Inara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46729/ijstm.v4i1.721

Abstract

Construction projects have been developing from the management side year by year. One of the problems that government has been facing government construction projects over the years is the duration of the procurement process that takes too long which is hard to be implemented if the project is urgent in terms of time. This creates the urgency to seek the solutions to the problem of how to shorten the time of the procurement process. The design and build integrated contract method that unites the planning and implementation process simultaneously is able to answer these problems and shorten the procurement time of government construction projects. However, there are many disputes faced by construction projects that use integrated design contracts postproject, one of which comes from the Government Internal Supervisory Apparatus (APIP) or commonly called the Inspectorate. This is because there are several different standard between the inspectorate and the owner or contractor that has been used in the process of government construction projects Audit. This study aims to identify the standards of the audit process of the Inspectorate, analyze the risks that cause disputes, and to develop standards for risk-based audit methods for design and build-based construction projects in order to minimize disputes that occured from the inspectorate side of perspective.
Sustainable Infrastructure Development in The IKN Region (Nusantara Capital): Simulation of The Smart Self-Sustaining Urban Center Area Development Laksono, Naufal Budi; Latief, Yusuf
Smart City Vol. 4, No. 1
Publisher : UI Scholars Hub

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Embarking on the quest for a sustainable urban future, this research immerses itself in the vibrant landscape of "Sustainable Infrastructure Development in the IKN Region (Nusantara Capital)." This study investigates the financial viability and economic attractiveness of the Five City project, focusing on efficient infrastructure management for sustainable settlement development. The core facility comprises four vertical residential towers with supporting amenities. The research aims to evaluate the project''s feasibility over a 25-year investment period through comprehensive financial analyses.The research employs a structured approach, encompassing regulatory analysis, stakeholder identification, financial capability analysis, and risk management. Parameters such as Net Present Value (NPV), Benefit/Cost Ratio (BCR), Internal Rate of Return (IRR), and Payback Period are used for economic feasibility analysis. The study employs a detailed Risk Breakdown Structure (RBS) and Risk Register for risk management. The results collectively highlight the project''s promising economic outlook and proactive risk management approach.In conclusion, the study underscores the feasibility of the Five City project as a sound venture in project financing. The findings contribute valuable insights into infrastructure development, project finance, and risk management, providing a blueprint for sustainable housing projects in the Nusantara Capital Region. Recommendations include continuous monitoring, transparent communication, and adaptability for long-term success.
Planning Innovation for Implementing Modular Prefabricated Construction in Housing Development in Indonesia Using A Risk-Based ISO 56002:2019 Approach to Improve Project Performance Rahman, Deansa Agya; Latief, Yusuf
Smart City Vol. 4, No. 1
Publisher : UI Scholars Hub

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The development of housing in Indonesia, growing rapidly due to urbanization and population growth, faces challenges in terms of land, labor, and housing backlog. Despite being innovative, modular prefabrication methods are limited by unattractive designs and high costs, slowing down construction, harming the productivity of construction companies, and hindering the growth of the national construction sector. These challenges are prevalent in various countries and are influenced by low knowledge, conservative mindsets, and inhibiting regulations. In Indonesia, additional issues include a lack of mastery of modular prefabrication methods and awareness of long-term benefits. This research identified innovative risk-based applications of modular prefabrication with an ISO approach to improve project performance. The methodology employed includes a literature review, a questionnaire survey, and phased expert validation. The study found that out of 38 risk factors based on the 4 processes of implementing modular prefabrication methods, the average risk assessment is high. As a result, 5 innovations are proposed as efforts to reduce risk assessments. The research analyzed data from various literature, resulting in low inter-data connectivity. However, the processes and outcomes of this research can be relied upon for further understanding in subsequent research. This study combined proposed new innovations with those from external literature that have the potential to be applied in Indonesia for optimizing the cost efficiency of modular prefabrication methods.
SEM-PLS Model of Resource Based ISO 56002;2019 Integrated Lean Six Sigma for Cultivating Culture of Innovation (Cased in Precast Concrete Company in Indonesia) Ginting, Yan; Latief, Yusuf; Hidayanti, Ranti
Journal of International Conference Proceedings Vol 6, No 7 (2023): 2023 ICPM Bali Proceeding
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v6i7.2847

Abstract

This study explores the integration of ISO 56002:2019-based Innovation Management Systems and Lean Six Sigma in the resource context of the precast concrete industry. Lean Six Sigma (LSS) and Innovation are powerful methodologies that exhibit several differences, there are numerous areas where LSS and innovation share compatible foundations and common goals in the pursuit of improving implementation of Innovation management system on these companies. In this study, we conducted a literature review to identify the research variables, which were then validated by 5 experts. We collected data through questionnaires from 54 respondents who work in a precast concrete company in Indonesia. SEM-PLS methods were used for analysis. Results indicate Lean Six Sigma's substantial positive influence on resource of precast concrete company in the Innovation Management System, offering valuable insights for Indonesia's precast concrete industry. This study contributes to continuous improvement in innovation culture, fostering competitiveness in the global market.
Development of Unit Price Contract Standards Between Main Contractor and Subcontractor in PT XYZ Factory Home Appliance Project Based on Contract Management Body of Knowledge to Reduce Claims on Project Anggraini, Rika; Latief, Yusuf; Riantini, Leni Sagita
Journal of International Conference Proceedings Vol 6, No 7 (2023): 2023 ICPM Bali Proceeding
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v6i7.2759

Abstract

Contract management methods are important in a construction project. The factory home Appliance project is one of the national strategic projects in an industrial area. In the execution of the contract, there are claims that occur between the main contractor and the subcontractor. This research was conducted to provide the development of contract management based on Contract Management Body of Knowledge to reduce risk-based claims. The results of this study can provide input and new guidelines for contract management that will be carried out in the future.
Evaluation of Implementation of Maintenance Management System for Working Vessels of PT Timur Bahari to Improve Company Financial Performance Febriansyah, Eki Hikmah; Latief, Yusuf
Journal of International Conference Proceedings Vol 6, No 7 (2023): 2023 ICPM Bali Proceeding
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v6i7.2828

Abstract

The working vessel is an important asset for marine contractors, including PT Timur Bahari. It plays important role as main equipment for marine constructions, crew accommodation, and marketing tools for the company. Recognizing the pivotal role of working vessel, any downtime would result in unproductive and reducing company’s revenue. On the other hand, uptime is expected to always be at the high level so that working vessels becomes vital to the company’s Financial Performance. The study utilizes survey methods, literature reviews, and case study. The conclusion of this study demonstrates that integrating the Maintenance Management System with the Business Process can significantly enhance the company’s Financial Performance.
Risk-Based Method-Technology Integration on Spun Pile Production for Product and Service Quality Hidayawanti, Ranti; Latief, Yusuf; Gaspersz, Vincent
Civil Engineering Journal Vol 10, No 11 (2024): November
Publisher : Salehan Institute of Higher Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28991/CEJ-2024-010-11-015

Abstract

The research aims to identify the risk factors and the medium-high risks to use as the basis for the innovative method of spun pile manufacturing technology. The research uses the Delphi method to analyze and review the validity of content construction, pilot and respondent surveys, focus group discussions, and expert validation. The findings show utilizing and optimizing the technology on production machinery is influential for results on both product and service quality. The dominance category in the medium-risk technology indicates the need for improvement in the operator's competence. The result also indicates the largest medium risk is during the initial integration, Cutting and Heading at 84%, and the final step, Stressing and Spinning, at 59%. The research improvement to map the production process is related to the medium and high risks to know where and how the industry can improve. This risk-based technology and integration method is a proposed method using an approach to innovation management by reducing the risk values. Innovation by improving the standard operational procedure (SOP) was based on the relation of each activity during the integration within the risk category of medium-medium, medium-high, and high-high. We recommend improving SOP and utilizing information technology on precision for both subprocesses. Doi: 10.28991/CEJ-2024-010-11-015 Full Text: PDF
Strategies to Improve Conceptual Cost Estimates Accuracy of Flyover Development in the Provincial Government of DKI Jakarta Yussi, Putika; Latief, Yusuf
Journal of International Conference Proceedings Vol 4, No 1 (2021): Proceedings of the 9th International Conference of Project Management (ICPM) Mal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v4i1.1139

Abstract

This study identifies the dominant factors in the conceptual cost estimate process of flyover development in the Provincial Government of DKI Jakarta that affect accuracy, based on the relationship model between the conceptual cost estimation process of flyover development in the Provincial Government of DKI Jakarta with the accuracy. Furthermore, this study also develops strategies to improve the accuracy based on the dominant factors. Two parts of the method are used in this study. The first method is to obtain the dominant factors in estimating the conceptual cost of flyover development in the DKI Jakarta Provincial Government, which affects accuracy using the SEM-PLS method, which involved 151 respondents. Second, the method to obtain strategies to improve accuracy based on these dominant factors, using the gap analysis. The result shows that four dominant factors affect accuracy: information quality, project definition, cost information, and project characteristics. Improving strategies are obtained based on those identified dominant factors. The finding of this study suggests that these strategies can be compiled into the guideline of the conceptual cost estimate process, which can be a tool to assist relevant agency personnel in carrying out the stages in the process of conceptual cost estimation of flyover development.
Co-Authors Abdur Rohim Boy Berawi Achirwan Achirwan Afrizal Nursin Agnes Purba Aidil Fitriansyah Alin Veronika Alin Veronika, Alin Alvian Sutekat, Ega Alwan Muhammad Naufal Amalia Dwi Purnamasari Andhika Karim, Dr. Rully Andina Ganesdhi, Gabby Andreas Wibowo Ardiyanto, Fahreza Astrid Dwi Lestari Ayomi D. Rarasati Ayu Herzanita Bambang Trigunarsyah Bambang Trigunarsyah Bambang Trigunarsyah, Bambang Batara Imanuel Sirait Bernadette Detty Kussumardianadewi Budi Nugroho, Danang Dameria Lady Hertina Lumban Raja Danang B. Nugroho Danang Budi Nugroho Darma , Surya Dewi, Febrianti Silviana Djoko M Hartono Dwianditya, I Bayu Dwita Sutjiningsih Dyah Ayu Pangastuti Eddy Subiyanto Edhi Tri Budi Soesilo, Edhi Tri Budi Fadhil Ahmad Rusydi Fadli, Zafira Alysha Fatma Lestari Febriansyah, Eki Hikmah Ferdinand, Joshua Feronica Damanik, Mariana Fitria, Diana Rohmatul Ghazali, Muhammad Ginting, Yan Hasiholan, Yosua Togar Hidayanti, Ranti Hidayawanti, Ranti Idi Namara Imran H. Mohammad Ineswari Syifa Hayuningtiyas, Ineswari Syifa Irfan Fadhila Efendi ISMET ABIDIN Ismeth Abidin Ismeth Abidin Ismeth Abidin, Ismeth Ismeth S. Abidin Ismeth S. Abidin, Ismeth S. Isti Surjandari Jade Sjafrecia Petrociany Janrivai Adiman Silalahi Kurniawati, Eva Andrian Laksono , Naufal Budi Laksono, Naufal Laksono, Naufal Budi Lalitya, Dina Benua Leni Sagita Riantini Leni Sagita Riantini Supriadi Leni Sagita Supriadi, Leni Lestari, Astrid Dwi Luh Putu Ratna Sundari Lusiana Indarwati M. Fanshurullah Asa M. Fanshurullah Asa, M. Fanshurullah Mochamad A. Wibowo Mohammed Ali Berawi Muhammad N. Akram Muhammad Rachmat Muhammad Yusuf Mulyono, Bagjo Naufal Budi Laksono Naufal Budi Laksono Nisrina, Dhia Tsuraya Novika Candra Fertilia Nugroho, Danang Budi Pangastuti, Dyah Ayu Paulus Setyo Nugroho Perdana Miraj Pondaag, Reynard Puja Dewi , Marmelia Putika Yussi Putro, Anggoro Rahayu S. Arifin, Rahayu S. Rahman, Deansa Agya Rarasati, Ayomi Dita Ratih Fitriani Regina Chandra Renti Odor Siahaan Retyaning Utami Retyaning Utami, Retyaning Richard Austen Soegianto Rika Anggraini Rohmatul F, Diana Rosmariani Arifuddin Rossy Armyn Machfudiyanto Saputro, Danang Eko Setyo Sarwanto Moersidik Silalahi, Janrivai Adiman Sutjiningsih M, Dwita Syaifullah, Adrian Toha Saleh Triasa Maryadini Ulya Ilmi Azhara Utami, Retyaning Puji Vincent Gaspersz Wisnu Isvara Yussi, Putika Zaman, Alvian Amaly Fasha Najmu