Claim Missing Document
Check
Articles

Found 11 Documents
Search
Journal : Journal of Industrial Engineering Management

STRATEGI PEMASARAN KUE BAGEA SEBAGAI KUE KHAS KOTA PALOPO DENGAN MENGGUNAKAN ANALISIS SWOT PADA UKM MULTI KUE KOTA PALOPO Padhil, Ahmad; Saleh, Anis; Nusran, Muhammad; Ismail, Hardi; Aidel, Aida
Journal of Industrial Engineering Management Vol 3, No 2 (2018): Journal of Industrial Engineering Management Vol. 3 No. 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (579.268 KB) | DOI: 10.33536/jiem.v3i2.230

Abstract

PERANCANGAN SISTEM INFORMASI MANAJEMEN ADMINISTRASI PENJUALAN PADA TOKO LINTANG OUTDOOR BERBASIS WEB Anis Saleh; Ariamin Ariamin; Andi Pawennari; Ahmad Padhil
Journal of Industrial Engineering Management Vol 3, No 1 (2018): Journal of Industrial Engineering Management Vol. 3 No. 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (794.157 KB) | DOI: 10.33536/jiem.v3i1.199

Abstract

Untuk kemajuan suatu perusahaan dalam upaya perluasan pasar dibutuhkan suatu sistem yang dapat mempermudah perusahaan dalam memberikan informasi kepada konsumen mengenai produknya dan sesuatu yang berkaitan dengan transaksi jual beli. Selain itu juga perusahaan membutuhkan suatu sistem yang dapat diakses orang banyak kapan dan dimanapun juga selama dapat terhubung dengan jaringan internet. Dimana tujuan dari perancangan ini adalah untuk mengimplementasikan sistem informasi menejemen administrasi penjualan lintang outdoor berbasis web. Hasil dari perancangan ini menghasilkan hasil menjelaskan bahwa Aplikasi sistem informasi penjualan yang menangani pelaporan transaksi penjualan, pelaporan detil transaksi penjualan pada periode tertentu serta dan pada perancangan ini dapat membuat pembeli tidak harus bertemu dengan penjual melainkan melalui sistem online
MINIMASI WASTE UNTUK PERBAIKAN PROSES PRODUKSI KANTONG KEMASAN DENGAN PENDEKATAN LEAN MANUFACTURING (STUDI KASUS PT. XYZ). Rinaldi Ismail; Anis Saleh; Takdir Alisyahbana
Journal of Industrial Engineering Management Vol 5, No 1 (2020): Journal of Industrial Engineering Management Vol. 5 No. 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v5i1.88

Abstract

Pabrik PT.XYZ pada divisi produksi kantong semen memiliki kegiatan dalam produksi Kantong. Untuk meningkatkan produktivitas, perusahaan harus mengelola kegiatan untuk meningkatkan nilai tambah dan mengurangi beberapa Waste. Penelitian ini bertujuan untuk menganalisis penyebabnya masalah Waste, dan memberikan rekomendasi untuk meminimalkan Waste. Pemecahan masalah pada penelitian ini menggunakan pendekatan konsep lean manufacture. Identifikasi Waste dimulai dengan identifikasi arus nilai keadaan saat ini pemetaan dengan menimbang Waste untuk memahami akar masalah dalam proses produksi. Detailnya pemilihan pemetaan menggunakan Value Stream Analysis Tools (VALSAT). Analisis Penyebab Penyebab digunakan untuk memahami akar masalah untuk proses produksi diikuti oleh SIPOC untuk memahami peningkatan prioritas yang harus dilakukan. Dari hasil analisis data, kami menemukan bahwa pesanan limbah yang paling dominan adalah cacat, menunggu, inventaris, transportasi berlebihan. Detail pemetaan digunakan untuk proses analisis sebagai Pemetaan Kegiatan Proses Matriks Respons Rantai Suplai dan Pemetaan Filter Kualitas. Dari hasil penelitian kami menemukan penurunan produksi waktu dari 2.539 menit menjadi 2.419 menit. Proses lead time yang menurun bisa mencapai 12% dibandingkan sebelum pemulihan langkah.
ANALISIS PRODUKTIVITAS DENGAN METODE OBJEKTIVE MATRIX (OMAX) PADA CV. BINTANG JAYA Abdul Mail; Takdir Alisyahbana; Anis Saleh; Rahmania Malik; Ibrahim Ibrahim
Journal of Industrial Engineering Management Vol 3, No 2 (2018): Journal of Industrial Engineering Management Vol. 3 No. 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (960.848 KB) | DOI: 10.33536/jiem.v3i2.234

Abstract

Persaingan pada industri manufaktur saat ini semakin ketat khususnya di makassar. Setiap perusahaan dituntut untuk berusaha menjaga kestabilan kinerjanya agar dapat bertahan dari persaingan yang kompetitif. Bahkan, untuk dapat mengungguli para pesaingnya perusahaan menginginkan adanya peningkatan kinerja pada setiap periode. CV. Bintang Jaya merupakan salah satu industri yang bergerak di bidang pembuatan sirup, tepatnya di Kota makassar yang berdiri sejak tahun 1981. Tujuan produksinya di prioritaskan untuk memenuhi kebutuhan daerah sulawesi selatan,terutama daerah Makassar. Pada tahun 2016 CV. Karena perusahaan biasanya tidak selalu mencapai terget produksinya maka cv bintang jaya ingin mengukur produktivitas produksi agar mencapai target produksinya dengan catatan kinerja perusahaan dan produktivitas perusahaan meningkat. Dengan menggunakan produktivitas yang merupakan salah satu dari sekian banyak instrument manajemen dalam mengukur kinerja organisasi yang berorientasi pada profit dan non profit, dimana nantinya hasil pengukuran tersebut dapat dijadikan informasi mengenai kondisi organisasi, yang apabila kondisinya buruk dapat segera diperbaiki dan apabila kondisinya cukup baik maka agar dipertahankan atau bahkan ditingkatkan, maka model pengukuran yang digunakan untuk mengukur tingkat produktivitas adalah model Objective Matrix (Omax), yang mana kelebihan dari model ini adalah dapat mengukur tingkat produktivitas dari sudut non keuangan. Dari hasil pengukuran yang telah dilakukan menunjukkan bahwa indeks produktivitas yang paling rendah adalah pada bulan Februari 2017 yaitu sebesar -82,58% dan indeks produktivitas yang paling tinggi adalah pada bulan Maret 2017 yaitu sebesar 240,74%.
DESIGN OF THE MANAGEMENT MODEL OF URBAN HOUSEHOLDS SOLID WASTE GENERATION Zakir Sabara; Muhammad Fachry Hafid; Anis Saleh; Takdir Alisyahbana; Nur Ihwan Safutra; Muhammad Nusran
Journal of Industrial Engineering Management Vol 6, No 1 (2021): Journal of Industrial Engineering Management Vol. 6 No. 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v6i1.886

Abstract

One of the global problems related to the future of cities is the environmental problem, namely the amount of municipal solid waste. From this waste, several issues arise in various aspects, such as health, aesthetics, and social and environmental problems. So that focused research is carried out on the management of urban solid waste produced by households. The research objective is to design a conceptual model and determine the variables and indicators that affect the generation of urban household solid waste and determine what prevention can be done. The model intended consists of 5 variables and 17 indicators. Data was collected based on a survey method with a closed questionnaire distributed to 120 respondents aged ≥ 17 years and residing in Yogyakarta. Analysis of the model and variable relationships was carried out based on the Structural Equation Modeling (SEM) method with the help of AMOS 24 software. The results showed that the designed model was valid. Socioeconomic variables, KAP level, waste reduction, and seasonality are direct predictors determining waste generation behavior. Socioeconomic variables are also direct predictors of KAP level and seasonal variables, and KAP level variables are direct predictors of waste reduction and seasonal variables
INFORMATION SYSTEM DESIGN FOR FINAL PROJECT CONSULTATION Hirawati Oemar; Sumarto Sumarto; Aan Komariah; Maulana Malik Ibrahim; Anis Saleh
Journal of Industrial Engineering Management Vol 6, No 3 (2021): Journal of Industrial Engineering Management Vol. 6 No. 3
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v6i3.1055

Abstract

This Final Project is one of the graduation requirements for Industrial Engineering students at the Islamic University of Bandung. Currently.  The final project consultation process is conducted manually using physical documents owned by each student as proof of consultation in the form of a consultation card. The problem faced was the difficulty in monitoring consultations and recording consultation discussions which were not well organized. The purpose of this study is to design a consulting information system using the prototyping method. The prototyping method is a system development method used to describe the system. The stages in this method consist of: (1) The planning stage is the identification of system requests. (2) the analysis phase analyzes the existing business processes in the final project section and identifies functional and non-functional requirements, (3) the design phase includes the interaction design of systems, processes, data and logical systems and physical interfaces. (4) Implementation phase of database and website development using PHP language and MySQL database. The results obtained from this study are business process consulting for the Final Project after the implementation of the proposed information system; final project consulting information system design which is expected to facilitate the consultation process in terms of time and consultation file documentation
SUPPLY CHAIN RISK ANALYSIS IN KUB – IK MATARAM MACOA WITH HOUSE OF RISK (HOR) Ahmad Padhil; Nurul Chairany; Arfandi Ahmad; Hardianti Ramli; Rahmaniah Malik; Anis saleh
Journal of Industrial Engineering Management Vol 6, No 2 (2021): Journal of Industrial Engineering Management Vol. 6 No. 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v6i2.942

Abstract

(KUB - IK ) Mataram  Macoa is a cocoa industry . The cocoa industry can produce chocolate with a cocoa material capacity of 87 kg per month or 1.0444 tons per year. Based on data from the Polewali Mandar Regency Statistics Agency, in 2018 the chocolate industry has a prospect that is still less proven with the data from BPS Polewali Mandar Regency, there is only 1 group of cocoa industry centers and the number of business units is 1 unit (BPS Polewali Mandar Regency, 2018).The company does not currently have a structured risk management to identify and mitigate risks that occur, especially in the supply chain function. By using the House of Risk method, the risks that may arise and their causes can be identified to simultaneously find ways to mitigate these risks to improve the operational quality of the Kelompok Usaha Bersama Industri Kecil Mataram Macoa  and open opportunities to detect profitable business opportunities for the company. The purpose of this paper is to determine the causes of the dominant risk and design response measures in the Kelompok Usaha Bersama Industri Kecil Mataram  Macoa. The basic method of writing is descriptive method and is implemented by using a case study method through a quantitative approach. The selection of respondents was carried out using purposive sampling technique. Methods of data collection by observation, in-depth interviews, questionnaires and literature study. The results of this paper indicate that in the activity plan there are 2 risks, in source activity there are 5 risks, in make activities there are 5 risks, in delievery activities there are 3 risks, and in return activities there is 1 risk. The risk treatment plan is designed to reduce the risk status for each risk event using a risk matrix
ANALYSIS OF QUALITY CONTROL OF T-SHIRT SCREEN PRINTING PRODUCTS WITH SIX SIGMA DMAIC METHOD ON CV. MACCA CLOTHING. Nurhayati Rauf; Ahmad Padhil; Takdir Alisyahbana; Anis Saleh; Muhammad dahlan; Rahmaniah Malik; Andi Pawennari; Nurul Chairany
Journal of Industrial Engineering Management Vol 7, No 1 (2022): Journal of Industrial Engineering and Management Vol 7 No 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v7i1.1147

Abstract

CV. Macca Clothing is a company engaged in Clothing screen printing. The resulting product is a short sleeve t-shirt screen printing. In producing the production, on average per month there are defective products of 6% types of defects, namely blurred colors, wrong colors, and wrong screen printing. Therefore, this study aims to providelevels sigma and DPMOand then analyze the factors causing disability and provide suggestions for improvements to reduce defective products at CVMacca Clothing. The data collection method used is to conduct interviews with CV.Macca Clothing. Then in analyzing the data using the method DMAIC and theapproach six sigma.From the research results, thevalue DPMO is 21,000 and the conversion result is 3.53, which means that out of a million opportunities there will be 3.53 possibilities for the production process to produce defective products. in thelevel stage  sigma CV.Macca Clothing has not yet reached thelevel Six Sigma, but it is still in the average industrial condition because in the production process there are still product defects that have not reached zero defect. The factors that cause defects in the product are the operator is not careful in doing the work, the quality of raw materials is not good, the cleanliness of the equipment is not maintained, and the production room facilities are inadequate. From the results of the analysis based on the implementation tools kaizen , the control and improvement to reduce defects that must be carried out by CV.Macca Clothing is to carry out stricter supervision or control, carry out regular machine maintenance, and provide complete facilities. 
DESIGNING AN INVENTORY MODEL FOR THE BEHAVIOR OF DEPENDENCE ON LPG GAS CONSUMPTION OF 3 KG USING THE DYNAMIC SYSTEM SIMULATION METHOD IN LUWUK BANGGAI REGENCY Izzul Aziz; Abdul Mail; Muhammad Nusran; Anis Saleh; Dirgahayu Lantara; Nurhayati Rauf; Muhammad Fachry Hafid
Journal of Industrial Engineering Management Vol 7, No 2 (2022): Journal of Industrial Engineering and Management Vol 7 No 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v7i2.1262

Abstract

Liquefied Petroleum Gas (LPG) or more commonly known as LPG gas is a gas stove fuel that comes from the results of liquefied petroleum gas and is then put into a tube, one of which is a 3-kilogram tube. The behavior of dependence on the consumption of 3-kilogram gas cylinders from the people of Banggai Regency can be seen from the use of non-subsidized 3 kilogram LPG gas, namely (±) 32. 002 people/group, the second is the consumption rate from subsidies and non-subsidies, namely 38. 864 units from total users, namely (±) 45. 000 people/groups with a supply of 30. 800 units and the third about frequent scarcity in 2020 and early 2021 reported by Banggai News and Obormotindok. Simulation Method Dynamic systems are modeling and running simulations of real systems to analyze problems and present solutions from policy scenarios from the researcher's perspective. By using this method, researchers can identify the behavior of 3 kilograms of gas consumption from the rate of consumption and demand through tables and graphs using the Powersim Studio 7 software. The results of the study present 3 policy scenarios, namely the first scenario regarding an increase in the transition to 99% non-subsidized gas cylinders with simulation results, namely September 1 2021 - October 1 2022 the demand is fulfilled, the second scenario regarding the addition of a 7th agent with simulation results, namely September 1 2021 - April 1 2023 demand can still be fulfilled and the third scenario regarding an increase in the transition to 99% non-subsidized gas cylinders and the addition of a 7th agent with simulation results, namely 1 September 2021 – 1 September 2023 the demand for needs is fulfilled. The conclusion is that the third policy scenario will be taken because among the policy scenarios presented, the preparation of tube supplies is fulfilled within two years, namely September 1 2021 - September 1 2023.
THE INFLUENCE OF EMPLOYEE SELECTION PROCESS ON EMPLOYEE PERFORMANCE AT THE CAMMING SUGAR FACTORY Dirgahayu Lantara; Abd Mail; A. Sriani Bulqis; Anis Saleh; Nur Ihwan Saputra; Rahmaniah Malik; Nurul Chairany; Taufik Nur
Journal of Industrial Engineering Management Vol 7, No 3 (2022): Journal of Industrial Engineering and Management Vol 7 No 3
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v7i3.643

Abstract

Human resources are one of the resources that exist in the organization which consists of people and their activities this is the most resources compared to other resources. At the Camming Sugar Factory, human resources are the main means to achieve the desired goals of the company, especially in the production section in order to achieve maximum production results with the aim of maintaining the survival of the company and employees being able to perform optimally in the form of work productivity. To achieve this goal, qualified human resources are needed, one way is through a good and correct selection process. The performance of employees at the camming sugar factory is said to be less than good. This can be seen from the conditions that have occurred in the Camming sugar factory, namely the threat of bankruptcy with an average loss of more than Rp. 100 billion per year due to production results which are only 30 percent of the maximum potential since 2001. Based on the parameters that cause losses at the Camming Sugar Factory which is thought to be caused by weak management which is considered to be the main trigger, it is necessary to research and review what factors influenced the decline of the factory..The method used in this research is linear regression method, in which the method can determine the hypothesis and the relationship between the independent variable and the bound variable. The research results obtained from the coeficients table obtained a significance value of 0.000 0.05, so it can be concluded that the Selection variable (X) affects the Performance Variable (Y). From the statistical calculation of the t test, t count is 6,731 from t table then H1 is accepted and Ho is rejected. This means that there is a significant and positive effect of the employee selection process on the performance of employees at the Camming Sugar Factory. Thus the hypothesis is proven