Scoring Setting and Infrastructure di Kampus Politeknik Negeri Medan Berdasar UI Green Metric Guide Lines 2023 Syahputra, Muhammad Taufiq; Rita, Eva; Carlo, Nasfryzal; Jumas, Dwifitra Y; Mulyani, Rini; Fuadi, Al-Busyra
Jurnal Talenta Sipil Vol 8, No 1 (2025): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v8i1.667

Abstract

Green Campus is a concept that supports sustainable and environmentally sound development by involving the academic community in the campus environment. In its strategic plan, the Medan State Polytechnic (Polmed) campus proclaimed to become a green campus in 2025. The efforts made by the Polmed campus to participate in sustainable development and become a green campus are by participating in the UI Green Metric World University Ranking program. In this program, one of the assessment indicator is setting and infrastructure, with 11 assessment criteria; the ratio of open space to campus area, total campus area covered by forest vegetation, total campus area covered by plant vegetation, total campus area for water absorption, total open space area to campus population, percentage of campus budget for sustainable efforts, percentage of building operation and maintenance activities in one year, campus facilities for the disabled, special needs, security and safety facilities, health infrastructure, conservation programs. This study aims to determine the Polmed campus score on setting and infrastructure indicators. By using quantitative methods, the results showed that Polmed campus has 8 criteria out of 11 required criteria. The score obtained by Polmed campus is 440 out of 1500 points. To increase the score can be implemented; vertical garden or rooftop garden on plant vegetation criteria (SI 3), making biopore infiltration holes and replacing paving blocks with grass blocks on water catchment area criteria (SI 4), installing guiding blocks and making ramps for disabled facilities criteria (SI 8), and blocking space for emergency rooms and lactation rooms on Health infrastructure criteria (SI 10).
SOSIALISASI PENGOLAHAN SAMPAH TINGKAT RUMAH TANGGA PADA IBU PKK KELURAHAN ULAK KARANG UTARA Rini Asmariati; Era Triana; Dwifitra Y; Jumas Jumas; Nori Yusri; Vivi Ariani; Wenny Widya Wahyudi
BULETIN ILMIAH NAGARI MEMBANGUN Vol. 3 No. 3 (2020)
Publisher : LPPM (Institute for Research and Community Services) Universitas Andalas Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/bina.v3i3.243

Abstract

In Kelurahan Ulak Karang Utara, Padang City, it produces garbage that comes from households every day. This waste is always thrown into the trash cans and then transported by the Kelurahan cleaners, thrown into the TPS, and finally dumped into the TPA. However, currently, the community has not yet implemented waste processing. Also, PKK mothers do not understand the benefits that can be obtained from sorting the waste in the household. The purpose of this activity is to increase knowledge and understanding as well as public awareness about waste processing to increase family income. This activity was carried out in Ulak Karang Utara Village, Padang City, with the target of PKK women's activities in Ulak Karang Village. The activity method used was counseling and training. The implementation of the activity began with an initial meeting between the presentation team, the village head, and the PKK's head, Ulak Karang Utara village. Furthermore, socialization was carried out on household-level waste processing at routine PKK women's meetings. At the end of the socialization, a question and answer session was conducted to see the participants' level of knowledge and understanding. The socialization of waste processing at the household level is the first step for PKK women of Ulak Karang Utara Village to sort waste from the beginning and ultimately reduce the amount of waste generated in the TPA. Waste sorting and processing training can be processed into compost so that it can increase family income. It is hoped that from this activity, PKK women can change their minds that sorting waste is carried out from the start starting at home.
Analisis Faktor yang Mempengaruhi Kinerja Pelaksanaan Proyek Terhadap Kualitas Konstruksi Jalan Nasional di Provinsi Sumatera Barat Rafki, Doni; Dwifitra Y. Jumas; Heldi
Civil Engineering Collaboration Vol. 9 (2024) No. 2
Publisher : Universitas Putra Indonesia YPTK Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35134/jcivil.v9i2.72

Abstract

Pemerintah Sumatra Barat telah melakukan pertumbuhan ekonomi nasional dan tercapainya konektivitas antar wilayah. Pemerintah telah menetapkan target pembangunan infrastruktur prioritas yang salah satunya adalah pembangunan infrastruktur jalan seperti distribusi dan logistik yang merupakan urat nadi kehidupan ekonomi, politik, sosial-budaya dan pertahanan keamanan nasional, serta penghubung antar daerah sebagaimana kondisi geografis Indonesia. Penelitian ini bertujuan untuk mengidentifikasi dan menganalisis faktor yang mempengaruhi kinerja pelaksanaan proyek konstruksi dan yang paling berpengaruh terhadap kualitas proyek konstruksi jalan nasional dan mengetahui strategi yang dapat dilakukan untuk meningkatkan kualitas proyek di Provinsi Sumatera Barat. Identifikasi dari 38 variabel dari 6 faktor terbukti bahwa 38 variabel dari 6 faktor tersebut merupakan faktor yang mempengaruhi kinerja pelaksanaan proyek konstruksi jalan dan faktor yang paling berpengaruh terhadap kualitas proyek konstruksi jalan nasional Provinsi Sumatera Barat. Dari hasil analisa yang telah dilakukan variabel kemampuan koordinasi/komunikasi SDM pada faktor Sumber Daya Manusia merupakan faktor yang mempengaruhi kinerja proyek konstruksi dan faktor bahan/material merupakan faktor yang paling berpengaruh secara signifikan terhadap kualitas hasil produk jalan nasional Provinsi Sumatera Barat. Pada analisis faktor berdasarkan output dari SPSS jika dirangkum berdasarkan nilai % of variance rotation sum of squared loading terdapat 13 komponen yang terbentuk dengan nilai masing – masing komponen adalah faktor 1 (satu) nilai % of variance yang dihasilkan adalah sebesar 22,806 %, faktor 2 (dua) 31,000%, faktor 3 (tiga) 37,652%, faktor 4 (empat) 43,078 %, faktor 5 (lima) 48,110%, dan 6 (enam) 52,709%, faktor 7 (tujuh) 56,629%, faktor 8 (delapan) 60,224%, faktor 9 (sembilan) 63,536%, faktor 10 (sepuluh) 66,574%, faktor 11 (sebelas) 69,241%, faktor 12 (duabelas) 71,825%, dan faktor 13 (tigabelas) 74,270%. Maka variabel yang mempengaruhi pelaksanaan proyek konstruksi jalan Provinsi Sumatera Barat adalah variabel kemampuan koordinasi/komunikasi SDM yang terlibat dalam pelaksanaan proyek konstruksi jalan dimana variabel ini termasuk pada faktor sumber daya manusia dengan nilai % of variance rotation sum of squared loading sebesar 74, 270%.
Faktor-Faktor Manajemen Material dalam Percepatan Pelaksanaan Proyek Konstruksi Padang Pariaman Andriani, Rini; Jumas, Dwifitra Y.; Rita, Eva
Jurnal Civronlit Unbari Vol 10, No 1 (2025): April
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v10i1.142

Abstract

In the implementation of construction projects, the application of material management shows an influence on the smoothness of project work time, therefore it is necessary to examine and describe what parts of material management have an influence and how much influence they have. Based on literature studies and interviews and the author's experience as a project actor, a study was conducted to obtain the most influential factors in accelerating the implementation time of construction projects in Padang Pariaman Regency. The study was conducted using a Likert scale questionnaire method which was distributed to project actors as respondents and after that validity, reliability and factor analysis were tested on respondents' answers using SPSS. The results of the study obtained 2 new factors related to project material management, namely the first factor of inventory and warehousing control and the second factor was the factor of selecting specifications and material scheduling. The results obtained were quite unexpected because the specification selection factor is rarely discussed and used as a consideration when discussing the project implementation time, however, with the emergence of this factor, we as project actors are aware that this specification selection factor is very important in accelerating construction work in the Padang Pariaman Regency area.
FAKTOR-FAKTOR TATA KELOLA ARSIP PADA DINAS PUPR KOTA SUNGAI PENUH Oktovianus, YZ; Zulherman, Zulherman; Jumas, Dwifitra Y
SIGMA TEKNIKA Vol 8, No 1 (2025): SIGMATEKNIKA, VOL. 8, N0. 1, JUNI 2025
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v8i1.7090

Abstract

Archives and archiving can be optimally beneficial if managed properly, but on the contrary if archives are not managed properly then it can cause problems. This study aims to identify, analyze factors and variables of archive governance of the PUPR Office of Sungai Penuh City. The research method uses a quantitative method, where data collection uses a questionnaire, while data processing is carried out using SPSS (Statistical Package for the Social Sciences). Validation, reliability, KMO Bartlett's test and factor analysis with Confirmatory Factor Analysis were carried out on the results of the questionnaire. The results of the study indicate that there are factors that influence the governance of archives of the PUPR Office of Sungai Penuh City, namely equipment and resource factors, administration and expertise factors, information and storage factors. This is evidenced by the stages of analysis carried out for the KMO test having met the requirements with a KMO value of 0.814 or greater than 0.5 and Bartlett's 0.000 or less than 0.005 so that it is stated that there is eligibility for the variables used for the analysis process. The dominant factors influencing archive management at the PUPR Service of Sungai Penuh City are administration and expertise factors with an average value of the variables forming the analysis factors of (4.19).
Factors Causing Delays in Road Construction Projects in Kerinci Regency Junata, Hengki; Jumas, Dwifitra Y; Rita, Eva
RIGGS: Journal of Artificial Intelligence and Digital Business Vol. 4 No. 3 (2025): Agustus - October
Publisher : Prodi Bisnis Digital Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/riggs.v4i3.2667

Abstract

Delays in road construction projects are one of the problems that often occur in the implementation of infrastructure development, especially in Kerinci Regency. This study aims to identify and analyze the factors causing delays in road construction projects in the region. The research method used is quantitative descriptive with a survey approach. The study population consisted of contractors, project supervisors, and related parties involved in the implementation of road projects, with samples taken purposively. The data collection instrument is in the form of a questionnaire that is compiled based on indicators of project delay factors, such as project management, human resources, equipment, weather conditions, and funding. The data obtained was analyzed using descriptive statistics to determine the frequency, percentage, and ranking of factors that contributed to project delays. The results show that project management and planning factors are the main causes of delays, followed by limited human resources and equipment, as well as unfavorable weather conditions. These findings provide a comprehensive overview of the obstacles faced in road construction projects in Kerinci Regency and can be used as a reference for related parties to design mitigation strategies to increase the effectiveness and timeliness of project implementation.
MULTI-CRITERIA DECISION MODEL FOR MATERIAL SUPPLIER SELECTION FLEXIBLE PAVEMENT USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD Rizkian, Alhanza; Jumas, Dwifitra Y; Rita, Eva
Rang Teknik Journal Vol 7, No 2 (2024): Vol. 7 No. 2 Juni 2024
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v7i2.4917

Abstract

This research was conducted on construction workers / contractors in the field of roads and bridges in the province of West Sumatra. This study aims to provide consideration for construction companies in choosing the right supplier by considering various criteria, determine the priority scale of supplier selection activities for construction actors/contractors, provide suggestions or solutions for selecting flexible pavement suppliers for construction actors in the province of West Sumatra by using the Analytic Hierarchy Process (AHP) method. The results showed that the criteria and sub-criteria can be used as suggestions or solutions, namely supplier profiles consisting of certificates and business licenses, not blacklisted, clear company name and address, capital, company age, performance over the last 5 years and this year, total and quality of employees, and the number of clients in a year safety records consist of taking materials with eco-friendly designations, availability of training for new employees, the importance of applying OSH in the work environment, and the number of accidents in the last 5 years and delivery consisting of timely delivery, delivery distance, delivery of materials according to the order, and the type and amount of shipping transportation. With the supplier profile factor weighing 49.70% safety record factor 21.90% delivery factor 11.70% quality factor 6.80% cost factor 5.80% service factor 4.10%.
Effectiveness of Competency-Based Training for construction Labor in West Sumatra Jumas, Dwifitra Yenti; Ariani, Vivi; Asrini, Asirini
Jurnal Rekayasa Sipil (JRS-Unand) Vol. 17 No. 1 (2021)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jrs.17.1.52-63.2021

Abstract

The issuance of Minister Regulation of Public Works and Public Housing (PUPR) No. 24/ PRT/ M/ 2014 concerning Competency-Based Training Guidelines in the Construction Services Sector is a strong effort by the government to increase the capacity of sustainable construction human resources in order to produce productive and competent human resources. Therefore, the workforce must-have requirements and a series of specific competencies to carry it out effectively and efficiently. Moreover, these competencies must be under the work they will do. The Kirkpatrick Model is used to evaluate the results of training and learning programs and rates against four levels of criteria: reaction, learning, behavior, and results. This research aims to find out what variables affect the effectiveness of competency-based training based on Kirkpatrick's four levels and see whether the competency training activities effectively increase human resources in construction services. A total of 64 questionnaires were then distributed to relevant respondents who attended the competency-based training held in West Sumatera during the 2017-2018 periods. From the results, there are 4 Kirkpatrick level variables that affect the effectiveness of training, namely the level of reaction (21 indicators), learning (6 indicators), behavior (7 indicators), and results (11 indicators). The variable that shows the most effective results is the variable level of learning as much as 47.51%, followed by results (44.56%), learning (47.51%), and behavior (29.27). It can be concluded that  the workforce competency training conducted in West Sumatera from 2017 to 2018 was still less effective.
Penerapan Sistem Manajemen Keselamatan Konstruksi (SMKK) Terhadap Keberhasilan Proyek Pembangunan Fisik CWJ-01 Universitas Jambi -, Zufriel; Carlo, Nasryzal; Jumas, Dwifitra; Peli, Martelius; Mulyani, Rini
English Vol 3 No 2 (2025): Volume 3 - Nomor 2 - Oktober 2025
Publisher : Fakultas Teknik dan Teknologi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47970/jttt.v3i2.964

Abstract

Keselamatan dan Kesehatan Kerja (K3) merupakan bagian terpenting dalam sebuah kegiatan proyek konstruksi yang mana hal tersebut dapat menjadi suatu permasalahan yang banyak menyita perhatian dikarenakan mencakup berbagai hal, diantaranya adalah dari segi kemanusiaan, biaya, manfaat ekonomi, serta aspek hokum yang harus dipertanggung jawabkan demi menjaga citra dari organisasi/perusahaan. Setiap kegiatan proyek konstruksi tentu akan memiliki target penyelesaian pekerjaan dengan tepat waktu, mutu dan biaya sesuai dengan apa yang telah direncanakan, banyak aktifitas proyek konstruksi yang dilaksanakan memiliki beberapa kendala didalamnya yang dapat memberikan kerugian, menyebabkan keterlambatan waktu penyelesaian pekerjaan, salah satu penyebab terganggunya adalah kecelakaan kerja yang memungkinkan dapat terjadi pada proyek konstruksi.Metode dalam penelitian ini adalah penelitian kuantitatif dengan metode analisis kausal komparatif. Metode ini digunakan untuk menganalisis pengaruh penerapan SMKK terhadap keberhasilan proyek, pengaruh SMKK terhadap penyelesaian hambatan proyek serta analisis SWOT solusi penyelesaian proyek. Adapun populasi penelitian adalah owner, konsultan dan pekerja proyek CWJ-01 Universitas Jambi tahun 2023 dengan jumlah responden sebanyak 65 orang. Masa penelitian dari bulan Januari 2023 sampai dengan Juni 2023. Hasil penelitian adalah analisis penerapan SMKK masih rendah. Konsultan proyek menjelaskan bahwa sistem manajemen keselamatan, terutama dalam memenuhi persyaratan suatu proses produksi. Kecelakaan kerja dan gangguan kesehatan yang dialami seorang pekerja bukan saja menjadi masalah bagi pekerja itu sendiri namun juga bagi anggota keluarganya serta kerugian yang besar bagi perusahaan. Kecelakaan kerja di tempat kerja pada umumnya dapat dicegah tanpa perlu mengeluarkan investasi dalam jumlah tinggi. Tingkat penerapan SMKK secara kolektif adalah sebesar 64%. Hal ini tentu mempengaruhi tingkat keberhasilan proyek.
Partisipasi Masyarakat Dalam Penyusunan Rencana Detail Tata Ruang (RDTR) Ibukota Kabupaten Padang Pariaman Saputra, Adrian; Anif, Bahrul; Y Jumas, Dwifitra
Jurnal Teknik Sipil Institut Teknologi Padang Vol 13 No 1 (2026): Jurnal Teknik Sipil Institut Teknologi Padang
Publisher : ITP Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21063/jts.2026.V1301.097-103

Abstract

Penelitian ini bertujuan untuk menganalisis bentuk dan tingkat partisipasi masyarakat dalam penyusunan Rencana Detail Tata Ruang (RDTR) Ibukota Kabupaten Padang Pariaman serta menilai pengaruhnya terhadap efektivitas program perencanaan. Pendekatan penelitian menggunakan metode campuran dengan dominasi kualitatif, melalui wawancara mendalam dengan informan kunci dan penyebaran kuesioner kepada 87 responden yang terdiri dari wali nagari, anggota Badan Musyawarah Nagari (BMN), dan tokoh masyarakat yang terlibat dalam proses musyawarah. Instrumen penelitian dikembangkan berdasarkan integrasi tiga teori partisipasi, yaitu Arnstein’s Ladder of Participation, Pretty’s Typology of Participation dan kerangka partisipasi menurut Uphoff. Analisis data menunjukkan bahwa bentuk dan tingkat partisipasi masyarakat dalam penyusunan Rencana Detail Tata Ruang (RDTR) Ibukota Kabupaten Padang Pariaman masih berada pada kategori partisipasi menengah dengan dominasi pada tingkat tokenism, sesuai dengan tipologi Arnstein. Masyarakat telah terlibat terutama sebagai pihak yang dikonsultasikan, ditunjukkan melalui tingginya akses informasi dan keterlibatan dalam memberikan masukan, namun belum memiliki posisi yang kuat dalam proses pengambilan keputusan strategis. Penelitian ini merekomendasikan penguatan mekanisme partisipatif berbasis evaluasi bersama, peningkatan kapasitas masyarakat, serta pengembangan model kolaborasi yang memungkinkan kemitraan sejajar antara pemerintah daerah dan masyarakat dalam perencanaan tata ruang.