PERENCANAAN SIMPANG TAK BERSINYAL PADA SIMPANG KEMUDA, JALAN SEROJA, JALAN KEMUDA III DENPASAR I Gede Ardi Maha Putra; Anak Agung Rai Asmani K; Ni Komang Armaeni
Jurnal Teknik Gradien Vol 14 No 1 (2022): Jurnal Teknik Gradien
Publisher : Fakultas Sains dan Teknologi Universitas Ngurah Rai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47329/teknikgradien.v14i1.836

Abstract

Kota Denpasar merupakan Ibu Kota Provinsi Bali. Sebagai Ibu Kota Provinsi, Denpasar menjadi pusat kegiatan, baik kegiatan social budaya, kegiatan pemerintah, kegiatan perdagangan, kegiatan Pendidikan dan lain – lain. Kota Denpasar memiliki luas wilayah 127,78 km2 atau 2,18% dari luas wilayah Provinsi Bali. Jumlah penduduk di Kota Denpasar mencapai 947,1 ribu jiwa dengan tingkat kepadatan penduduk sebesar 7,41 ribu jiwa/km2. Jumlah ini diperkirakan akan terus bertambah setiap tahunnya. Dengan bertambahnya jumlah penduduk yang ada di Kota Denpasar tiap tahunnya mengakibatkan bertambahnya jumlah pengendara kendaraan bermotor. Pertumbuhan ini secara langsung berpengaruh pada peningkatan proporsi kendaraan pada arus lalu-lintas. Salah satu lokasi di Denpasar yang mengalami permasalahan lalu-lintas adalah simpang 4 lengan yang mempertemukan Jalan Kemuda, Jalan Seroja, Jalan Kemuda III. Kemacetan kerap terjadi di jalan raya khususnya di simpang. Di bagian simpang inilah biasanya sering sekali terjadi kemacetan. Hal itu disebabkan karena simpang merupakan titik bertemunya beberapa pergerakan dari arah yang berbeda menuju suatu area yang sama yakni di pertengahan simpang. Untuk mengurangi kemacetan yang terjadi di simpang maka diperlukan manajemen pada simpang. Selain mengurangi kemacetan, juga dapat meningkatkan kapasitas simpang dan meminimumkan terjadinya kecelakaan lalu lintas. Persimpangan yang sering terjadi kemacetan yaitu persimpangan jalan di kawasan simpang Kemuda. Pada kawasan tersebut terdapat sekolah, perkantoran, juga pusat perbelanjaan yang memicu adanya bangkitan pergerakan. Usaha untuk menyelesaikan permasalahan konflik lalu lintas diperlukan suatu pembangunan sarana dan prasarana yang mendukung, terutama peningkatan jaringan jalan, perencanaan persimpangan serta manajemen lalu lintas, diharapkan dengan penataan sistem lalu lintas yang tertata dengan baik dapat mengurangi permasalahan pada kedua persimpangan tersebut
PENERAPAN SANITASI HIGIENE PADA KELOMPOK MINA SARI SEJAHTERA DI DESA PERANCAK KECAMATAN JEMBRANA, KABUPATEN JEMBRANA, BALI Ni Made Ayu Suardani Singapurwa; I Putu Candra; I Nyoman Rudianta; Ni Komang Armaeni
J-ABDI: Jurnal Pengabdian kepada Masyarakat Vol. 1 No. 4: September 2021
Publisher : Bajang Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53625/jabdi.v1i4.250

Abstract

Community Service Activities were carried out at the Mina Sari Sejahtera Group in Perancak Village, Jembrana District, Jembrana Regency. The processing of fishery products has been produced and marketed by partners, but partners want to increase the quantity and quality. Partners do not yet have good processing knowledge and hygiene sanitation in processing, as well as inadequate processing facilities, so that production is not as desired. The solutions to solve the problems faced by partners are: providing Appropriate Technology in processing fish processing products; provide knowledge on good processing methods, sanitation and processing hygiene; providing equipment assistance, as well as providing assistance for repairing the floor of the processing area. The results of the activity show an increase in turnover of partners engaged in the economy, an increase in the quantity and quality of products, as well as an increase in people's understanding and skills
KONSEP DISAIN BALE GONG YANG BERSINERGI DENGAN RUANG LUAR, SEKRETARIAT LAN JAGABAYA, RUANG SEKEHA TRUNA DHARMA LAKSANA, DAN KOPERASI BANJAR KAJA, DESA PAKRAMAN PANJER, DENPASAR I Gede Surya Darmawan; I Wayan Wirya Sastrawan; Ni Komang Armaeni
WICAKSANA: Jurnal Lingkungan dan Pembangunan Vol. 3 No. 1 (2019)
Publisher : Lembaga Penelitian, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/wicaksana.3.1.2019.1-9

Abstract

Pasca dilakukannya kegiatan Pengabdian Kepada Masyarakat tahun 2017 yang mengambil obyek Renovasi Bale Kulkul serta Atap Wantilan Banjar telah rampung terbangun akhir tahun 2017, pihak mitra 1 dan 2 yaitu Kelihan Gede dan Penyade Banjar Kaja Panjer kembali menghubungi tim dari Universitas Warmadewa tahun 2018 yang mana diwakilkan oleh tim dari Fakultas Teknik untuk meninjau keberadaan Bale Gong, Sekretariat Kelihan lan Jagabaya, Ruang Sekeha Truna Dharma Laksana, dan Koperasi Banjar. Keadaan fisik bangunan dengan empat fungsi yang berbeda ini jauh dari kata layak. Seperti pada Bale Gong, seluruh jendela menggunakan kaca gelap serta disain ruang yang tertutup membuat saat latihan megambel, pantulan gema suara gamelan sangat keras, serta perlu dihidupkan lampu setiap saat. Fungsi Bale Gong seperti kurang efektif karena hanya sebagai tempat penyimpanan. Tidak terkoneksinya Bale Gong dengan Ruang Luar menyebabkan saat ingin latihan ataupun saat ingin mencocokkan lagu gamelan dengan tarian dari penari, penabuh harus membawa keluar gamelan tersebut. Selain itu ruang-ruang lain juga tidak termanfaatkan dengan maksimal karena lebih dipakai sebagai tempat pengepul sampah plastik. Dari segi tampilan bangunan juga perlu didisain tampilan yang mengakomodir lingkungan sekitar yang didominasi bangunan arsitektur kontemporer. Permasalahan-permasalahan diatas tentunya dicari solusinya dalam wujud konsep desain yang mengakomodir keempat fungsi yang berbeda dalam satu massa bangunan yang tentunya terkoneksi dengan ruang luar. Desain yang dihasilkan dalam wujud gambar 2 dimensi dan 3 dimensi serta perencanaan RAB yang dipakai sebagai acuan tender pelaksanaan dan acuan dalam pembangunan. Kata kunci : konsep disain, empat fungsi dalam satu bangunan, sinergi dengan ruang luar
Pemberdayaan Obyek Guna Lahan Di Kawasan Desa Sanur Sebagai Alternatif Ruang Terbuka Hijau (RTH) Kota Denpasar Ni Komang Armaeni; Putu Gede Suranata; I Wayan Gde Erick Triswandana
Jurnal Sutramas Vol. 1 No. 1 (2021): Jurnal Sutramas
Publisher : Fakultas Teknik Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (276.126 KB)

Abstract

Ruang Terbuka Hijau (RTH) memiliki banyak fungsi selain fungsi ekologi sebagai paru-paru kota atau wilayah. Kota Denpasar memiliki setidaknya 1.091,07 Ha Ruang Terbuka Hijau Kota (RTHK) dimana belum semua potensinya dimanfaatkan dengan optimal sebagai contoh RTHK Desa Sanur Kaja. Topografi Desa Sanur Kaja khususnya pada area Jl. Hangtuah dan Jl. Sedap Malam merupakan daerah dataran rendah dengan ketinggian 0-7 meter diatas permukaan laut dengan pemanfaatan lahan sebagai Ruang Terbuka Hijau seluas kurang lebih 39,4311 Ha sesuai dengan dokumen RTRW Kota Denpasar tahun 2011-2031. Dari hasil pengumpulan data menggunakan citra satelit dan superimpose pengukuran lapangan, didapatkan adanya pelanggaran terkait pembangunan bangunan dengan peruntukan rumah tinggal dan usaha. Pelanggaran yang terekam adalah seluas 11.6529 Ha sehingga menyisakan kurang lebih 27.7782 Ha RTH Existing yang harus diselamatkan dengan melakukan pengembangan untuk nantinya dapat di transformasi sebagai Objek Daya Tarik Wisata
ANALISIS FAKTOR YANG BERPENGARUH TERHADAP PEMBENGKAKAN BIAYA SELAMA PELAKSANAAN PROYEK DI MASA PANDEMI COVID-19 PADA PELAKU JASA KONSTRUKSI SKALA KECIL DI BALI Ida Ayu Cri Vinantya Laksmi; I Wayan Jawat; Ni Komang Armaeni
FROPIL (Forum Profesional Teknik Sipil) Vol 9 No 2 (2021): FROPIL (Forum Profesional Teknik Sipil)
Publisher : Jurusan Teknik Sipil Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (568.781 KB) | DOI: 10.33019/fropil.v9i2.2432

Abstract

The Covid-19 virus pandemic that hit Indonesia, especially Bali, had a huge impact on people's lives. This has an impact on several sectors, ranging from the health sector, the economy, education, tourism, including the development sector. The Corona outbreak has forced all countries to revise the development plans that have been proclaimed. Targets were realistically adjusted, assumptions were changed according to current circumstances, and short-term program priorities were shifted largely to address the Covid-19 pandemic. In the context of accelerating development to restore economic conditions, several small-scale construction service actors are still able to carry out development even though they have to experience several obstacles. During the implementation of development during a pandemic, of course, some costs undergo significant changes that can even cause cost overruns. The swelling of construction project costs is highly dependent on several factors, both internal and external factors of the project. Several factors were very influential in cost overruns during the implementation of projects carried out by small-scale construction service actors during the Covid-19 pandemic, including inaccurate cost estimates (9.33%), errors in choosing work methods (8.84%) ), low labor productivity (8.15%), dimensional error/measurement of work in progress (8.14%), frequent work delays (8.04%), schedule delays due to weather effects (8.00%), an increase in material prices (7.94%), high equipment prices/rents (7.67%), delays/lack of materials and materials (7.31%), material damage (6.81%), material specifications required unsuitable (6.52%), and untimely payment methods (6.26%).
Column structure strengthening with FRP (Fiber Reinforced Polymer) due to story addition I Wayan Maesa Andreasnata; I Nengah Sinarta; Ni Komang Armaeni; I. P. Ellsa Sarassantika; Dang Thanh Trung; Cintantya Budi Casita; Roro Sulaksitaningrum; Sudarno P. Tampubolon
Journal of Infrastructure Planning and Engineering (JIPE) Vol. 1 No. 1 (2022)
Publisher : Master Program of Infrastructure and Environmental Engineering, Postgraduate Program, Warmadewa University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (874.626 KB) | DOI: 10.22225/jipe.1.1.2022.38-45

Abstract

This study focuses on strengthening scheme of an existing structure with added story. The addition of a new story increases gravitational loading, which affects the seismic and wind responses of the structure and, as a consequence, the loading combination. To ensure the structure’s capacity requirement, the strengthening scheme uses CFRP (Carbon Fiber Reinforced Polymer). In order to adequately define the structure's performance, a series of structural analyses were performed. The structure's state before and after story addition, subsequently the state after CFRP strengthening, were evaluated. It is demonstrated that the additional story to the structure causes an exceedance in internal forces; however, the strengthening with CFRP is sufficient to withstand these forces, proving that the strengthening scheme is effective and beneficial.
HAZARD IDENTIFICATION AND RISK CONTROL ON THE NICU-PONEK BUILDING CONSTRUCTION PROJECT OF TABANAN REGIONAL GENERAL HOSPITAL Ni Komang Armaeni; IWG. Erick Triswandana; IB. Dalem Gunawangsa
International Journal of Engineering and Emerging Technology Vol 6 No 2 (2021): July - December 2021
Publisher : Doctorate Program of Engineering Science, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In the implementation of construction projects, management of the project work time so that the project is completed on time, but in reality on the ground there are still many things that can hamper the work of the project, one of which is a work accident that occurs to project workers.. In the process of building the NICU-Ponek Building, workers on the project are very rarely using Personal Protective Equipment, even though it has been provided by the company. Based on this, the authors devised this plan with the aim of minimizing the risk of work accidents through the process of hazard identification, risk assessment, and continued risk control. This planning method was done by qualitative method by explaining variables at the hazard identification stage and processing data at the risk assessment stage. Quantitative methods are also used against questionnaire results at the risk assessment stage including validity tests. The results of planning at the hazard identification stage through the "Expert Test" questionnaire resulted in 74 variables and 290 indicators that will be influential and continue to the end of the risk assessment questionnaire. At the risk assessment phase through a risk assessment questionnaire produces 3 types of risk levels, namely low risk rating, moderate and high risk rating which is further controlled by advanced risk controlling. Based on the results of the risk assessment questionnaire, there are 32 variables and 38 indicators that have a high rating of risk carried out by means of technical control and administrative control.
PERENCANAAN PELAKSANAAN PEKERJAAN PILE CAP PADA PROYEK PEMBANGUNAN GEDUNG IGD UPT RUMAH SAKIT NYITDAH TABANAN Esy Armada Putri; Ni Komang Armaeni; I Wayan Gde Erick Triswandana
Jurnal Teknik Gradien Vol 15 No 01 (2023): JURNAL TEKNIK GRADIEN
Publisher : Fakultas Sains dan Teknologi Universitas Ngurah Rai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47329/teknik gradien.v15i01.1010

Abstract

Implementation planning in project management is very important. Project implementation planning is a stage applied in project management by setting goals and objectives that must be achieved and determining the policies of all technical and administrative programs so that they can be implemented. Planning the implementation of development projects uses data collection methods with library and documentation techniques, the data obtained is in the form of secondary and primary data. The implementation method in the field uses conventional and mechanical methods to maximize work, one of which is pile cap work. Pile cap is a way to tie the foundation before a column is erected at the top. This pile cap aims to make the location of the column really at the center point of the foundation so as not to cause eccentricity that can cause additional load on the foundation. The pile cap carried out in the UPT Nyitdah Tabanan Hospital IGD Building Construction project uses four types of pile caps and the implementation method in the field uses mechanical methods. The scheduling results in writing this journal use the Precedence Diagram Method (PDM) method. The total duration based on the calculation is 45 days with a Bill Of Quantity (BOQ) including 10% VAT of Rp7,645,657,919.78.
Packaging Innovation for Dry Fish Lemuru Products in Perancak Village, Jembrana Regency, Bali Ni Made Ayu Suardani Singapurwa; I Putu Candra; I Nyoman Rudianta; Ni Komang Armaeni
Asian Journal of Community Services Vol. 2 No. 6 (2023): June 2023
Publisher : PT FORMOSA CENDEKIA GLOBAL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55927/ajcs.v2i6.4815

Abstract

Vacuum packaging is one way to extend the shelf life of dry food products. Dry fish lemuru is one of the regional superior products in Jembrana Regency, Bali. Processing of these fishery products has been produced and marketed by them, but not yet intensively, and they want to increase the quantity and quality. This community did not have prior knowledge in the field of business management, so they experienced obstacles in managing production and marketing. Solutions made to solve the problems faced by them were: providing appropriate technology in processing the fish products as well as storing and packaging with vacuum packaging methods including marketing, and business management. The output targets achieved were appropriate technology for traditional fishery processing; increased turnover; increased product quality and quantity.
PERENCANAAN PELAKSANAAN PROYEK KONSTRUKSI PADA PROYEK PEMBANGUNAN RUMAH SUSUN SEKOLAH TINGGI AGAMA HINDU NEGERI MPU KUTURAN SINGARAJA I Gusti Ngurah Wiryadharma Verdianata; Ni Komang Armaeni; Ni Made Widya Pratiwi
Jurnal Teknik Gradien Vol 15 No 02 (2023): JURNAL TEKNIK GRADIEN
Publisher : Fakultas Sains dan Teknologi Universitas Ngurah Rai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47329/teknik_gradien.v15i02.1096

Abstract

Project planning is the first step in managing the resources, funds and time that has been determined to complete the project. The project for the construction of the Mpu Kuturan Singaraja State Hindu Religious High School Flat is a project that has been implemented but does not have an existing plan yet. Therefore, the author tries to make a plan according to the method that has been studied. This plan consists of a Construction Project Implementation Method Plan, a Project Implementation Schedule Plan using the Precedence Diagram Method (PDM), an Implementation Cost Plan (RBP), a Cost Budget Plan (RAB), and a Achievement Schedule with the S Curve Method.