Claim Missing Document
Check
Articles

Found 23 Documents
Search

EVALUASI PELAKSANAAN PROGRAM BANTUAN PERBAIKAN RUMAH UNTUK RUMAH TANGGA MISKIN (RTM) DI KOTA DENPASAR Wiwik Hermawati; I N. Sutarja; Mayun Nadiasa
JURNAL SPEKTRAN Vol. 3, No. 2, Juli 2015
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (250.239 KB) | DOI: 10.24843/SPEKTRAN.2015.v03.i02.p09

Abstract

The endeavor of Denpasar City Government in establish the wellbeing of its people especially the underprivileged households is conducting a house renovation aid program in order to accomplish the essential privileges of livable and healthy housing. With numerous problems during the development program execution, therefore, this study is carried out to evaluate the program implementation to determine the program effectiveness index and its relationship between the program effectiveness and the increase of the wellbeing of underprivileged households. The primary data are composed from survey feedbacks of sequence of questions in a questioner. While, the secondary data were collected from Office of Spatial Planning and Housing of the City of Denpasar and other related agencies. The methods used in data collection consist of interviews and questionnaires.  Out of 30 questions in the questioner, all were affirmed valid and reliable. The analytical tool utilize in the study were descriptive analysis, effectiveness analysis in term  of input variables, output variables, outcome variables and impact variables which modify Dantes' formula; and Chi Square analysis to distinguish the relationship between program effectiveness and program's impact to wellbeing improvement. Of the five Dante's categories of effectiveness index, the analysis of the feedbacks of 68 respondents which distributed in four districts in the City of Denpasar are presented in this study. The total score value of program implementation effectiveness, indicated by X, X = 4581, within the range 3400 ? X ? 4760. This index value showed that the implementation of the house renovation for underprivileged households aid program is classified to be less effective. The value of Chi Square of the study is greater than its critical value (47.33 > 13.277). It is indicating that there is a significant relationship between program effectiveness and the program impact to the people wellbeing improvement. It is suggested that when the program and its impact is to be continued, the effectiveness variables need to be optimized and so the managements improvements in order to increase the wellbeing of the underprivileged households.
ANALISIS SISTEM PENGADAAN PROYEK KONSTRUKSI TERHADAP PENYERAPAN ANGGARAN PEMERINTAH KABUPATEN BADUNG N. Gita Astadi; I N. Sutarja; Mayun Nadiasa
JURNAL SPEKTRAN Vol. 3, No. 1, Januari 2015
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (393.92 KB) | DOI: 10.24843/SPEKTRAN.2015.v03.i01.p010

Abstract

Abstract : The rate of absorption of a government budget, especially on the construction projects, determine whether or not the optimal development of a region. The faster the budget absorption of the construction projects, the faster the perceived benefits. The purpose of the study was to determine the rate of the budget absorption, to find out the factors in the construction project procurement systems that affect the slow budget absorption of the Local Government of the Badung Regency as well as the efforts to minimize such delays. The data were obtained from the parties involved in the procurement of the construction projects through questionnaires as the research instruments. In addition, the data were also obtained through interviews, observations and documentations. The variables used in the study were 38 variables and 60 persons as the respondents. The data analysis was conducted through descriptive analysis, absorption analysis and factor analysis. The scoring system used a Likert scale, and data processing was conducted by SPSS. The findings of the study show that the rate of absorption of the Badung Regency Government’s construction projects for Fiscal Year 2012 - 2013 was not in accordance with the plan, but the increase was more than that of the previous fiscal year. While the results of the factor analysis by using SPSS indicate that the factors that affecting the slow absorption budget in the procurement system of most construction projects are: the fear and caution of the parties in carrying out procurement activities, the change in the activity package, the slow preparation of the Owner's Estimate (OE), the incomplete procurement documents, the misrepresentation of the procurement regulations and the slow process of procurements. And the most effective effort to enhance the budget absorption are the determination of the communication standards, the coordination and the synchronization in the procurement of construction projects with all parties involved in the procurement systems.
STRENGTHENING STRATEGY APPLIED FOR REINFORCED CONCRETE (RC) FRAME STRUCTURE USING STEEL BRACES AFTER LOMBOK EARTHQUAKE (CASE STUDY: PARKING-LOT OF MALL BALI GALERIA-MBG) Sutarja I.N; I Gede Adi Susila
Journal of International Conference Proceedings (JICP) Vol 2, No 1 (2019): Proceedings of the 3rd International Conference of Project Management (ICPM) Bal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v2i1.435

Abstract

Lombok Earthquake 2018 was very rare and interesting phenomenon to be taken into consideration due to its behavior. The pattern of seismicity was up and down which gives panic and confusion, especially to the public who live in Lombok, Bali and Sumbawa. There were at least six earthquakes with magnitudes of 5.5 to 6.9 ML in a short interval between 29th July to August 25, 2018. The earthquake caused structural damages in Lombok as well as in Bali region. The case study has been taken to cover 4-storey RC frame of MBG building which located in Kuta, Bali. Damage occurs on columns, beams. Beams and pre-printed reinforced concrete plates and reinforced concrete columns in place. Analysis has been applied into existing structure and stress ratio analysis check has also been taken in order to find failures. Overstresses has been found at the columns and beams, therefore, the strengthening is needs. Strengthening strategy using braces of Wide Flange-IWF, typically a cross bracing (X) method has been taken into account in order to find out the structural behavior as well as the performance level of building. Braces has been invoked for both: transverse and longitudinal directions of buildings and most of the beams and columns were reinforced by using Fiber. This strengthening has been done very nicely and the parking-lot building has been tested and it can be used regularly as it is.