Claim Missing Document
Check
Articles

Found 32 Documents
Search

REKONSTRUKSI ASPEK FUNGSI DAN ESTETIKA BANGUNAN KOMERSIAL ERA KESULTANAN BULUNGAN, TANJUNG SELOR, KALTARA Risnafaty, Risnafaty; Wihardyanto, Dimas; Fajarwati, Anisah Nur
LANGKAU BETANG: JURNAL ARSITEKTUR Vol. 12 No. 1 (2025): April
Publisher : Architecture Program Department of Architecture, Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/lantang.v12i1.84092

Abstract

Identitas sebuah kota dapat diwujudkan dengan cara mengungkapkan peninggalan arsitektur bangunan bersejarah. Salah satu contoh peninggalan bangunan bersejarah yang ikonik dan bersifat komersial adalah rumah toko dan bioskop. Kedua bangunan ini digolongkan ke dalam ragam bangunan komersial lama yang dahulu banyak berdiri di bekas kawasan dagang pada era Kesultanan Bulungan, Kota Tanjung Selor, Kalimantan Utara. Fokus dan tujuan dari penelitian ini adalah aspek fungsi dan estetika pada bangunan komersial lama yang berupa rumah toko dan bioskop. Metode yang digunakan adalah rasionalistik dengan pendekatan kualitatif "“ deskriptif serta menjadikan aspek fungsi dan estetika bangunan sebagai variabel penelitian. Analisis data dilakukan dengan cara rekonstruksi secara virtual. Artinya, rekonstruksi tidak dilakukan secara langsung melainkan melalui gambar virtual yang digunakan untuk menemukan dan mengungkap keaslian fungsi dan estetika dalam bangunan rumah toko di kawasan Tanjung Selor. Hasil temuan yang diperoleh adalah tersisa sembilan bangunan komersial peninggalan era Kesultanan Bulungan yang masih menunjukan keaslian fungsi dan estetika di dalamnya. Kesembilan bangunan komersial tersebut menunjukkan keseragaman fungsi ruang dan esetika yang menjadi karakter dari bangunan komersial. Setiap bangunan komersial memiliki lima jenis ruang dengan susunan dari bagian depan sampai dengan belakang adalah beranda (emperan), toko, hunian, pelataran, dan dapur. Dari sembilan bangunan komersial yang tersisa, dapat dikelompokkan menjadi enam tipe berdasarkan jumlah lantai dan akses atau jalan masuk yang menghubungkan kelima jenis ruang. Akses atau jalan masuk tersebut ada yang menerus ada pula yang terputus di salah satu ruang.
Pushover Analysis of Harvard Dormitory Thursina International Islamic Boarding School Building with Inter Story Isolated System Modification Rahman, Aulia; Fajarwati, Anisah Nur; Sholeh, Moch; Sugiarto, Agus
Jurnal Teknologi dan Manajemen Vol 6, No 1 (2025): January
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat ITATS

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.jtm.2025.v6i1.6283

Abstract

Recently the demands of additional building functions have varied. These demands tend to affect structure stability because of the effects of additional mass. For example, Harvard Dormitory Thursina International Islamic Boarding School, located in Dau region, Malang city, East Java, Indonesia, a 11 x 8 m2 swimming pool is relocated on 4th floor. A big mass of pool certainly performs bigger lateral force due to seismic behaviour of structure itself. To reduce that, the IIS method is installed on the 3rd floor as it has damper effect along X and Y axis that is provided by LRB spring systems. IIS is widely used mainly in Japanese high-rise structures such as Shiodome Sumitomo building and Umeda Tower. To analyse the IIS modified structure, it is performed pushover analysis as controlled deformation is stated 18 in at rooftop. The results showed that 465 kN shear force and 160 mm story drift occurred on the 3rd floor which is the largest value compared to other stories. It is also obtained 230 mm lateral deflection of rooftop as the first plastic hinges are formed.
Pelatihan Pembuatan Yogurt dan Penyuluhan Pengendalian Mutu Yogurt melalui Implementasi Sistem Manajemen Mutu di UMKM Lingkungan ‘Aisyiyah Kota Malang Ningsih, Wahyuni; Rulianah, Sri; Fajarwati, Anisah Nur; Maryanty, Yanty; Sudarminto, Hadi Priya
J-Dinamika : Jurnal Pengabdian Masyarakat Vol 10 No 2 (2025): Agustus
Publisher : Politeknik Negeri Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Majelis Kesejahteraan Sosial Pimpinan Daerah ‘Aisyiyah (PDA) Kota Malang merupakan lembaga/organisasi perempuan islam yang sedang mengupayakan pemberdayaan UMKM di lingkungan ‘Aisyiyah Kota Malang. Tim pengabdian masyarakat bekerjasama dengan PDA Kota Malang untuk melaksanakan pelatihan pembuatan dan penyuluhan pengendalian mutu yogurt melalui implementasi Sistem Manajemen Mutu bagi UMKM tersebut. Tujuan dari kegiatan pengabdian ini yaitu meningkatkan pengetahuan dan pemahaman peserta UMKM mengenai cara membuat yogurt serta pentingnya pengendalian mutu. Metode yang digunakan yaitu edukasi interaktif berupa pemaparan materi, tanya jawab, dan demo. Untuk mengukur peningkatan pengetahuan peserta, data yang digunakan berupa nilai pretest dan posttest yang diuji melalui uji statistik. Selama pelaksanaan kegiatan, peserta sangat antusias dalam mengikuti serangkaian kegiatan. Hasil analisis data nilai pretest dan posttest peserta menunjukkan bahwa data tidak memenuhi syarat normalitas data meskipun memenuhi syarat homogenitas sehingga digunakan uji Wilcoxon Signed-Rank. Hasil uji statistik menunjukkan bahwa tidak terjadi peningkatan pengetahuan peserta secara signifikan mengenai cara pembuatan dan pengendalian mutu yogurt. Sebab nilai pretest peserta sudah baik yang berarti peserta sudah memiliki pemahaman dasar tentang pembuatan dan pengendalian mutu yogurt. Hasil kuesioner juga menunjukkan bahwa peserta merasa puas dengan kegiatan pengabdian ini. Sehingga diharapkan, ilmu yang dipelajari dapat menjadikan UMKM di lingkungan ‘Aisyiyah lebih berkembang.
Evaluasi dan Redesain Ruang Komunal Mahasiswa dengan Metode POE di Gedung Perkuliahan JTS, Polinema Fajarwati, Anisah Nur
Tekstur (Jurnal Arsitektur) Vol 4, No 2 (2023): Tekstur
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.tekstur.2023.v4i2.4850

Abstract

Gedung Perkuliahan Jurusan Teknik Sipil merupakan Gedung tertinggi pertama di Polinema yang terdiri dari 8 lantai dengan aktivitas yang padat. Kurangnya fasilitas ruang komunal mahasiswa menjadi permasalahan utama yang dibahas dalam penelitian ini. Penelitian ini menggunakan metode campuran kuantitatif dan kualitatif dengan pendekatan POE (Post Occupancy Evaluation). Tahap dalam proses analisis POE terdiri dari planning the POE, conducting the POE, dan applying the POE. Di dalam penelitian ini kuesioner digunakan untuk menggali informasi dari pengguna ruang komunal dan juga untuk mencari solusi serta rekomendasi desain ruang komunal mahasiswa yang nyaman. Data yang digunakan adalah data primer yang diperoleh dari observasi dan data skeunder dari penyebaran kuesioner. Hasil penelitian menunjukkan bahwa variabel kenyamanan audio dan kenyamanan ruang memiliki skor terendah sehingga perlu dilakukan peningkatan secara kualitas dan kuantitas. Ruang komunal mahasiswa di Gedung JTS, Polinema merupakan jenis ruang komunal tertutup karena terletak di dalam bangunan dengan memanfaatkan selasar dan lobi lantai 1, 2, dan 3. Evaluasi temuan hasil POE, ditinjau dari tiga aspek, aspek fungsional, teknis, dan perilaku. Hasil evaluasi ketiga aspek menunjukkan bahwa kurangnya ketersediaan fasilitas penunjang ruang komunal membuat mahasiswa kurang nyaman berada di dalamnya. Perlu adanya redesain interior yang eye catching untuk meningkatkan kenyamanan dan menarik mahasiswa supaya giat berkativitas di ruang komunal.
PEMODELAN 3D CANDI BADUT MENGGUNAKAN UAV FOTOGRAMETRI Bani, Martince Novianti; Fajarwati , Anisah Nur; Susilo , Helik; Yoganata, Yehezkiel Septian
Menara: Jurnal Teknik Sipil Vol. 21 No. 2 (2026): Menara : Jurnal Teknik Sipil
Publisher : Teknik Sipil, Fakultas Teknik Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/jmenara.v21i2.62843

Abstract

Pendokumentasian cagar budaya secara akurat merupakan langkah penting dalam upaya pelestarian dan analisis struktur bangunan bersejarah. Penelitian ini bertujuan untuk menghasilkan model tiga dimensi (3D) Candi Badut menggunakan teknologi Unmanned Aerial Vehicle (UAV) dan metode Structure from Motion (SfM) serta mengevaluasi tingkat akurasinya melalui perbandingan dengan pengukuran langsung di lapangan. Akuisisi data dilakukan menggunakan UAV dengan konfigurasi pemotretan oblique dan tingkat pertampalan tinggi untuk memperoleh citra yang optimal. Data citra kemudian diproses menggunakan perangkat lunak berbasis SfM untuk menghasilkan point cloud, mesh 3D, dan produk lainnya. Evaluasi akurasi dilakukan melalui analisis kesalahan geometrik dan uji statistik menggunakan uji t dua sampel. Hasil penelitian menunjukkan bahwa model 3D yang dihasilkan memiliki tingkat konsistensi tinggi, dengan nilai Root Mean Square Error (RMSE) sebesar 0,5629 meter. Selain itu, hasil uji t menunjukkan p-value sebesar 0,9844, yang menandakan tidak terdapat perbedaan signifikan antara pengukuran lapangan dan model 3D. Temuan ini mengonfirmasi bahwa UAV dengan teknik pengolahan data SfM mampu menyediakan representasi digital yang cukup akurat dan dapat diandalkan untuk dokumentasi, dengan harapan dapat digunakan untuk upaya konservasi cagar budaya Candi Badut. Pendekatan ini direkomendasikan sebagai teknik efektif dalam pemetaan dan pemodelan bangunan cagar budaya.
Peningkatan Infrasruktur Di Yayasan Nurul Hikmah Rebalas Melalui Bantuan Teknis Pemasangan Keramik Teras Rif'atul Khusniah; Anisah Nur Fajarwati; Aulia Rahman; Ayisya Cindy Harifah; Indah Ria Riskiyah; Yehezkiel Septian Yoganata
Jurnal Pengabdian kepada Masyarakat Vol. 12 No. 1 (2025): JURNAL PENGABDIAN KEPADA MASYARAKAT 2025
Publisher : P3M Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/abdimas.v12i1.6504

Abstract

This community service activity focused on improving the learning environment at Nurul Hikmah Foundation, located in Rebalas Village, Grati District, Pasuruan Regency. By providing technical assistance for ceramic tile installation on the foundation's terrace, we aimed to create a comfortable and attractive outdoor learning space for the children. The installation of ceramic tiles not only enhanced the aesthetics of space but also created a safe and stimulating environment for the young learners. This intervention is expected to positively impact on student engagement, academic performance, and overall school experience at Nurul Hikmah Foundation
IMPLEMENTASI BIM UNTUK OPTIMASI PENJADWALAN DAN BIAYA PEKERJAAN STRUKTURAL DAN ARSITEKTURAL PROYEK RUSUN ASN 3 IKN Restu Putra Fajar; Anisah Nur Fajarwati
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 7 No. 1 (2026): MARET 2026
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v7i1.8957

Abstract

Seiring pesatnya pembangunan infrastruktur dan gedung bertingkat di Indonesia, penyedia jasa konstruksi dituntut menerapkan sistem terintegrasi untuk meningkatkan efisiensi dan produktivitas. Berdasarkan Pasal 28 ayat (1) Permen PUPR Nomor 22 Tahun 2018, penggunaan Building Information Modeling (BIM) diwajibkan untuk gedung negara dengan luas di atas 2.000 m2. Proyek Rusun ASN 3 IKN memiliki luas 13.000 m2 dengan 14 lantai yang teridiri dari 6 Tower. Penelitian ini mengkaji implementasi konsep BIM untuk Tower 1 dalam estimasi biaya (BIM 5D) dan penjadwalan proyek (BIM 4D). Metode yang digunakan meliputi pemodelan struktural dan arsitektural dengan Autodesk Revit, serta simulasi penjadwalan melalui Autodesk Navisworks. Untuk meningkatkan akurasi kuantitas, model Revit diekspor ke format IFC kemudian diimpor ke Cubicost TAS untuk menghitung volume struktural dan arsitektural. Sementara itu, Cubicost TRB digunakan untuk estimasi tulangan. Integrasi ini mempercepat proses estimasi, menjadikannya lebih terstruktur dan minim kesalahan. Hasil implementasi BIM 5D menunjukkan deviasi terhadap volume existing pekerjaan struktural sebesar; -26,72% untuk pekerjaan beton, -6,11% Kg pekerjaan pembesian, dan -26,93% pekerjaan bekisting, serta pekerjaan arsitektural sebesar; -7,01% untuk pekerjaan dinding, -4,96% pekerjaan plafon, -15,91% pekerjaan lantai, dan 0% pekerjaan kusen. Estimasi biaya berdasarkan volume existing mencapai Rp128.893.452.920,38, sementara itu, estimasi berbasis BIM hanya sebesar Rp116.207.988.532,86, menghasilkan efisiensi sebesar Rp12.685.464.387,53 atau -10% lebih hemat. Untuk penjadwalan (BIM 4D), durasi pekerjaan struktural dan arsitektural yang semula direncanakan selama 294 hari, dapat dipersingkat menjadi 287 hari berdasarkan analisis di Microsoft Project dan simulasi Autodesk Navisworks. Dengan demikian, implementasi BIM yang melibatkan Autodesk Revit, Navisworks, serta Cubicost TAS dan TRB terbukti mampu mendukung efisiensi biaya dan waktu pelaksanaan proyek konstruksi, sekaligus meningkatkan akurasi dan konsistensi data proyek.
Pelatihan Mitigasi Bencana Gempa untuk Santri Pondok Pesantren Al Mukhlisin Putri, Kota Batu Martince Novianti Bani; Anisah Nur Fajarwati; Ayisya Cindy Harifa; Fuji Asema; Kharisma Nur Cahyani; Rizki Putri Ramadhani
KOMUNITA: Jurnal Pengabdian dan Pemberdayaan Masyarakat Vol 5 No 1 (2026): Februari
Publisher : PELITA NUSA TENGGARA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.60004/komunita.v5i1.366

Abstract

Kegiatan Pengabdian Kepada Masyarakat yang dilaksanakan di Pondok Pesantren Al Mukhlisin Putri, Kota Batu bertujuan untuk meningkatkan pemahaman dan kesiapsiagaan santri tehadap potensi bencana, khususnya bencana gempa bumi. Kegiatan ini dilaterbelakangi oleh kondisi pondok yang padat serta minimnya pengetahuan santri dan pengajar mengenai langkah-langkah penyelamatan diri saat bencana gempa terjadi. Tambahannya yaitu kurangnya pemantauan berkala terhadap kondisi fisik bangunan pondok. Berangkat dari permasalahan ini maka, para santri dan pengajar menunjukkan keingintahuan yang tinggi terhadap edukasi kebencanaan khususnya bencana gempa sebagai upaya untuk melindungi diri dan lingkungan sekitar. Melalui pendekatan kualitatif, tim pelaksana melakukan observasi sehingga diperoleh informasi kondisi fisik bangunan pondok, persepsi dan kebutuhan peserta terhadap pengetahuan mitigasi gempa bumi. Berdasarkan hasil temuan maka kegiatan dilanjutkan dengan pelatihan berupa penyajian materi interaktif yang melibatkan kerjasama dengan Badan Penanggulangan Bencana daerah (BPBD) Kota Batu. Hasil evaluasi kegiatan menunjukan bahwa adanya peningkatan pengetahuan dan ketrampilan santri dalam mengidentifikasi dan tanggap menghadapi situasi darurat gempa. Santri juga dapat mengetahui langkah-langkah penyelamatan diri di titik-titik aman (life safety zone) seperti konsep “triangle of life. Selain peningkatan kapasitas individu, kegiatan ini juga memberikan sumbangsih secara nyata pada lingkungan pondok pesantren yaitu berupa pemasangan jalur evakuasi dan titik kumpul aman (safe assembly point) yang sesuai dengan standar keselamatan kebencanaan. Keberadaan rambu tersebut juga dapat membangun budaya kesiapsiagaan dan memperkuat sistem mitigasi di lingkungan sekitar.
DESAIN ULANG STRUKTUR GEDUNG KELAS & LAB PUPR SEMARANG MENGGUNAKAN PERFORMANCE BASED DESIGN Akhmad Khairil; Wahiddin Wahiddin; Anisah Nur Fajarwati
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 3 (2024): SEPTEMBER 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i3.4754

Abstract

Struktur Gedung Kelas & Lab PUPR Semarang merupakan sebuah struktur yang memiliki level kinerja struktur life safety pada gempa Kobe BSE-1E dan BSE-2E. Berdasarkan hasil kinerja level struktur tersebut, tidak sesuai dengan ASCE 41-17. Oleh sebab itu maka akan didesain ulang struktur Gedung Kelas & Lab PUPR Semarang. Metode desain berbasis kinerja merupakan analisis yang dapat memastikan bahwa struktur mampu memenuhi kapasitas layan, kapasitas ultimit, serta memenuhi tingkat kinerja struktur yang sudah direncanakan. Hasil analisis tersebut didapatkan dimensi balok B1 500×1000 mm, balok B2 500×950 mm, balok B3 450×900 mm, balok B4 500×900 mm, balok B5 250×450 mm, balok B6 200×400 mm, balok BA1 300×600 mm, balok BA2 250×500 mm, balok BK 1 200×400 mm, balok BK 2 200×400 mm, kolom K1 1000×1000 mm, kolom K2 900×900 mm, kolom K3 700×700 mm, kolom K4 300×300 mm, kolom K5 400×400 mm, shear wall SW1 350 mm, pelat SA 120 mm. Dengan menggunakan dimensi serta tulangan yang sudah didesain, didapatkan level kinerja struktur Gedung Kelas & Laboratorium Semarang pada gempa Kobe BSE-1N berada pada kondisi immediate occupancy dengan nilai drift ratio 0,00704 dan untuk BSE-2N berada pada kondisi life safety dengan nilai drift ratio 0,01056, pada gempa Loma Prieta BSE-1N berada pada kondisi immediate occupancy dengan nilai drift ratio 0,00688 dan untuk BSE-2N berada pada kondisi life safety dengan nilai drift ratio 0,01032, dan pada gempa Parkfield BSE-1N berada pada kondisi immediate occupancy dengan nilai drift ratio 0,00629 dan untuk BSE-2N berada pada kondisi immediate occupancy dengan nilai drift ratio 0,00943. Dari hasil tersebut dapat disimpulkan bahwa struktur sudah memenuhi syarat.
PROJECT PLANNING PEMBANGUNAN JALAN TOL JAKARTA - CIKAMPEK II SELATAN PAKET 3 STA 31+400 - 62+000 Firly Regita; Suhariyanto; Anisah Nur Fajarwati
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 6 No. 2 (2025): JUNI 2025
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v6i2.5717

Abstract

Proyek Jalan Tol Jakarta – Cikampek II Selatan Paket 3 yang terletak di Kabupaten Karawang dan Kabupaten Bekasi inimemiliki panjang 31 km. Sulit dan jauhnya medan yang ditempuh, kegiatan mobilisasi, cuaca, serta metode pelaksanaan yang kurang sesuai menyebabkan keterlambatan Proyek Jalan Tol Jakarta – Cikampek II Selatan paket 3. Tujuan dari skripsi ini adalah untuk penyusunan project planning yang menghasilkan struktur organisasi, site layout dan traffic management, strategi pelaksanaan, metode pelaksanaan, penjadwalan, rencana mutu, Rencana Keselamatan Konstruksi (RKK), biaya dan Kurva S. Data yang digunakan antara lain gambar proyek, rencana kerja dan syarat-syarat, dan daftar harga satuan pekerjaan Kota Bekasi tahun 2023. Penyusunan penjadwalan proyek menggunakan MS Project 2016 untuk perhitungan Rencana Anggaran Pelaksanaan (RAP) dan kurva s menggunakan MS Excel 2016. Project planning ini menghasilkan struktur organisasi fungsional, site layout dan traffic management dengan 4 akses pintu masuk proyek. Strategi pelaksanaan terbagi menjadi 2 zona dengan 4 alur pekerjaan. Pengendalian mutu dilakukan melalui pemeriksaan pelaksanaan pekerjaandan pengujian material, Rencan Keselamatan Konstruksi (RKK) yang diterapkan dalam proyek melibatkan beberapa hal yaitu strukstur organisasi K3, struktur organisasi tanggap darurat, identifikasi potensi bahaya di lingkungan kerja yang berisikan IBPRP, peralatan penunjang program K3, jadwal program K3. Durasi waktu proyek diperoleh 1010 hari kalenderdengan total biaya pelaksanaan sebesar Rp2.411.664.576.400,00.