Claim Missing Document
Check
Articles

Found 16 Documents
Search
Journal : Journal of Industrial Engineering Management

STRATEGI PEMASARAN KUE BAGEA SEBAGAI KUE KHAS KOTA PALOPO DENGAN MENGGUNAKAN ANALISIS SWOT PADA UKM MULTI KUE KOTA PALOPO Padhil, Ahmad; Saleh, Anis; Nusran, Muhammad; Ismail, Hardi; Aidel, Aida
Journal of Industrial Engineering Management Vol 3, No 2 (2018): Journal of Industrial Engineering Management Vol. 3 No. 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (579.268 KB) | DOI: 10.33536/jiem.v3i2.230

Abstract

PERANCANGAN SISTEM INFORMASI MANAJEMEN ADMINISTRASI PENJUALAN PADA TOKO LINTANG OUTDOOR BERBASIS WEB Anis Saleh; Ariamin Ariamin; Andi Pawennari; Ahmad Padhil
Journal of Industrial Engineering Management Vol 3, No 1 (2018): Journal of Industrial Engineering Management Vol. 3 No. 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (794.157 KB) | DOI: 10.33536/jiem.v3i1.199

Abstract

Untuk kemajuan suatu perusahaan dalam upaya perluasan pasar dibutuhkan suatu sistem yang dapat mempermudah perusahaan dalam memberikan informasi kepada konsumen mengenai produknya dan sesuatu yang berkaitan dengan transaksi jual beli. Selain itu juga perusahaan membutuhkan suatu sistem yang dapat diakses orang banyak kapan dan dimanapun juga selama dapat terhubung dengan jaringan internet. Dimana tujuan dari perancangan ini adalah untuk mengimplementasikan sistem informasi menejemen administrasi penjualan lintang outdoor berbasis web. Hasil dari perancangan ini menghasilkan hasil menjelaskan bahwa Aplikasi sistem informasi penjualan yang menangani pelaporan transaksi penjualan, pelaporan detil transaksi penjualan pada periode tertentu serta dan pada perancangan ini dapat membuat pembeli tidak harus bertemu dengan penjual melainkan melalui sistem online
PERANCANGAN INSTRUKSI KERJA DOKUMEN DAN VISUAL PADA MESIN ELECTRICAL DISCHARGE MACHINE Ahmad Padhil; Nurhayati Rauf
Journal of Industrial Engineering Management Vol 5, No 2 (2020): Journal of Industrial Engineering Management Vol. 5 No. 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v5i2.121

Abstract

Quality is a factor that can increase product competitiveness. In improving products quality is necessary to control the quality (Quality Control) of the process activities. This study aims to determine the quality control of granulated sugar packaging process by using the seven tool method consisting of check sheet, histogram, Pareto chart, flow chart, scatter diagram, control chart and fishbone diagram. From 30 days observation concluded that the highest type of damage consist of metal detection by 145 bags and torn packaging by 50 bags. Then, from the results of control chart known that out of control process still happen. Both types of damage then revised, and process capability analysis is carried out, so can be concluded that the process is not capable in making the product according to specifications. Therefore, an analysis using fishbone diagram shows that the causes of damage are human, working methods, and machines. From these factors, Standard Operating Procedures can be done as well as designing new machines in packaging process
USULAN PERBAIKAN LINGKUNGAN KERJA PADA BAGIAN MESIN PUFFING GUN DI IKM BIPANG PUTRI SEHATI KABUPATEN GOWA Ahmad Padhil; Andi Pawennari; Muhammad Dahlan; Nur Rezky Awaliah
Journal of Industrial Engineering Management Vol 3, No 1 (2018): Journal of Industrial Engineering Management Vol. 3 No. 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (569.686 KB) | DOI: 10.33536/jiem.v3i1.197

Abstract

Pada ruang produksi bagian mesin puffing gun atau disebut mesin palappo oleh masyarakat Kabupaten Gowa, pekerja sering mengeluhkan temperatur yang tinggi. Ruang produksi tersebut juga tidak memiliki ventilasi sehingga sirkulasi udara sangat kurang yang mengakibatkan ruangan panas dan tidak sejuk yang dapat mempengaruhi kondisi pekerja. maka yang menjadi rumusan masalah adalah penerapan ergonomi yaitu lingkungan kerja Industri Kecil Menengah (IKM) Bipang Putri Sehati pada bagian mesin puffing gun belum ergonomis sehingga diperlukan identifikasi terhadap penerapan lingkungan kerja yang ergonomis ditinjau dari aspek- aspek lingkungan kerja. Penelitian ini bertujuan untuk memperbaiki lingkungan kerja pada bagian mesin puffing gun yang memproduksi beras lebih mengembang akibat dari suhu panas yang ditimbulkan oleh mesin sehingga menghasilkan bipang. Faktor- faktor lingkungan kerja fisik yaitu pencahayaan, temperatur, sirkulasi udara, kebisingan, warna, bau-bauan, dan hiburan (musik). Dari hasil penelitian pengukuran waktu kerja dengan metode langsung menunjukkan waktu baku sebesar berturut- turut 17,67 menit, 18,66 menit, dan 17,38 menit pada pukul 08.00, 13.00, dan 15.00. Setelah dilakukan perbaikan lingkungan kerja yaitu dengan memberikan ear plug dan pemasangan kipas angin, sehingga peningkatan efesiensi waktu baku sebesar 16,53%, 17,15%, dan 17,21%. Perbaikan lingkungan kerja fisik adalah adanya ventilasi di sisi kanan tembok atau menanam tanaman di sekitar tempat kerja dan tidak mendengarkan musik pada saat bekerja.
PENGENDALIAN PERSEDIAAN BAHAN BAKU MENGGUNAKAN METODE MIN-MAX STOCK DI PT. PANCA USAHA PALOPO PLYWOOD Abdul Mail; Muhammad Asri; Ahmad Padhil; Takdir A Takdir A; Nurul Chairany Chairany
Journal of Industrial Engineering Management Vol 3, No 1 (2018): Journal of Industrial Engineering Management Vol. 3 No. 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (499.767 KB) | DOI: 10.33536/jiem.v3i1.198

Abstract

Penelitian ini bertujuan untuk menghindari kelebihan dan kekurangan bahan baku dengan menghitung besarnya persediaan bahan baku di PT. Panca Usaha Palopo Plywood. Penelitian ini menggunakan metode studi kasus yang bersifat kualitatif yang berguna menerapkan solusi pada masalah terkini. Data penelitian ini diperoleh dari dari data pertahun perusahaan dengan pihak terkait. Temuan penelitian ini menunjukkan bahwa standar pelaksanaan dan pengelolaan persediaan bahan baku telah sesuai dengan standar yang telah ditentukan perusahaan. Peneliti menyimpulkan bahwa PT. Panca Usaha Palopo Plywood cukup efisien, efektif, dan ekonomis namun masih terdapat kelemahan-kelemahan dalam kegiatan dalam pengelolaan persediaan bahan baku perusahaan seperti kurangnya pemahaman karyawan akan peraturan mengenai tindakan disiplin yang ada, kurangnya kepuasan karyawan, terhadap sikap perusahaan dalam pemberian kompensasi, serta pemesanan bahan baku yang tidak teratur sehingga mengakibatkan penumpukan di gudang.dan sebaliknya kekurangan stock digudang, pengelolaan persediaan bahan baku.
PENGUKURAN BEBAN KERJA OPERATOR STACKER RECLAIMER PADA BAGIAN COAL HANDLING DI PLTU CILACAP Hartomo Hartomo; Sigit Suwarto; Ahmad Padhil
Journal of Industrial Engineering Management Vol 4, No 2 (2019): Journal of Industrial Engineering Management Vol. 4 No. 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (260.213 KB) | DOI: 10.33536/jiem.v4i2.448

Abstract

I Efforts to determine the level of workload provided to employees is by measuring and evaluating the extent of the workload felt by employees. The higher the workload borne by employees, the higher the pressure, responsibility and targets that must be met by employees. Therefore, this study aims to measure the level of workload on the reclamer stacker Operator in the coal handling section of the Cilacap power plant for 3 work shifts, night, morning and evening shifts. In the process of measuring workload using a set of research questionnaires, 4 variables from the Defense Research Agency Workload Scale (DRAWS) method become the approach or basis for this research. The 4 variables are Input Demand, Central Demand, Output Demand and Time Pressure. Each of these variables represents the work performed by the reclamer stacker Operator. The results showed that for the three work shifts included in the category of overload with the acquisition of an average value of 73% or greater than 60% ( 60%). The level of complexity of work and work activities under pressure can cause workloads to be high which can ultimately lead to work accidents. In addition, from the results of the workload assessment using the DRAWS method, the highest value is found in the Central Demand (CD) variable, which is 80.5%. This means that the Operator feels the work activity on the variable CD is greater when compared to the work activity on other variables
SUPPLY CHAIN RISK ANALYSIS IN KUB – IK MATARAM MACOA WITH HOUSE OF RISK (HOR) Ahmad Padhil; Nurul Chairany; Arfandi Ahmad; Hardianti Ramli; Rahmaniah Malik; Anis saleh
Journal of Industrial Engineering Management Vol 6, No 2 (2021): Journal of Industrial Engineering Management Vol. 6 No. 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v6i2.942

Abstract

(KUB - IK ) Mataram  Macoa is a cocoa industry . The cocoa industry can produce chocolate with a cocoa material capacity of 87 kg per month or 1.0444 tons per year. Based on data from the Polewali Mandar Regency Statistics Agency, in 2018 the chocolate industry has a prospect that is still less proven with the data from BPS Polewali Mandar Regency, there is only 1 group of cocoa industry centers and the number of business units is 1 unit (BPS Polewali Mandar Regency, 2018).The company does not currently have a structured risk management to identify and mitigate risks that occur, especially in the supply chain function. By using the House of Risk method, the risks that may arise and their causes can be identified to simultaneously find ways to mitigate these risks to improve the operational quality of the Kelompok Usaha Bersama Industri Kecil Mataram Macoa  and open opportunities to detect profitable business opportunities for the company. The purpose of this paper is to determine the causes of the dominant risk and design response measures in the Kelompok Usaha Bersama Industri Kecil Mataram  Macoa. The basic method of writing is descriptive method and is implemented by using a case study method through a quantitative approach. The selection of respondents was carried out using purposive sampling technique. Methods of data collection by observation, in-depth interviews, questionnaires and literature study. The results of this paper indicate that in the activity plan there are 2 risks, in source activity there are 5 risks, in make activities there are 5 risks, in delievery activities there are 3 risks, and in return activities there is 1 risk. The risk treatment plan is designed to reduce the risk status for each risk event using a risk matrix
ANALYSIS OF QUALITY CONTROL OF T-SHIRT SCREEN PRINTING PRODUCTS WITH SIX SIGMA DMAIC METHOD ON CV. MACCA CLOTHING. Nurhayati Rauf; Ahmad Padhil; Takdir Alisyahbana; Anis Saleh; Muhammad dahlan; Rahmaniah Malik; Andi Pawennari; Nurul Chairany
Journal of Industrial Engineering Management Vol 7, No 1 (2022): Journal of Industrial Engineering and Management Vol 7 No 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v7i1.1147

Abstract

CV. Macca Clothing is a company engaged in Clothing screen printing. The resulting product is a short sleeve t-shirt screen printing. In producing the production, on average per month there are defective products of 6% types of defects, namely blurred colors, wrong colors, and wrong screen printing. Therefore, this study aims to providelevels sigma and DPMOand then analyze the factors causing disability and provide suggestions for improvements to reduce defective products at CVMacca Clothing. The data collection method used is to conduct interviews with CV.Macca Clothing. Then in analyzing the data using the method DMAIC and theapproach six sigma.From the research results, thevalue DPMO is 21,000 and the conversion result is 3.53, which means that out of a million opportunities there will be 3.53 possibilities for the production process to produce defective products. in thelevel stage  sigma CV.Macca Clothing has not yet reached thelevel Six Sigma, but it is still in the average industrial condition because in the production process there are still product defects that have not reached zero defect. The factors that cause defects in the product are the operator is not careful in doing the work, the quality of raw materials is not good, the cleanliness of the equipment is not maintained, and the production room facilities are inadequate. From the results of the analysis based on the implementation tools kaizen , the control and improvement to reduce defects that must be carried out by CV.Macca Clothing is to carry out stricter supervision or control, carry out regular machine maintenance, and provide complete facilities. 
RISK ANALYSIS OF INJURY AND WORKING PRESSURE USING LAMP REPLACEMENT TOOLS Hari Purnomo; Erni Yani; Ahmad Padhil
Journal of Industrial Engineering Management Vol 5, No 2 (2020): Journal of Industrial Engineering Management Vol. 5 No. 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v5i2.664

Abstract

Lamp replacement is a work activity that is carried out manually using a chair or using a lamp replacement tool. The tool used to replace the lamp is deemed ineffective, which can lead to musculoskeletal complaints. Therefore it is necessary to redesign the replacement lamp to suit the needs of the user. The product proposed for lamp replacement design will be compared with existing tools to measure the level of work speed and stress. The analysis used to measure the level of work speed and stress is the Quick Exposure Check (QEC). The results showed that the percentage of exposure level for the old lamp replacement tool was 41% -59% so that further investigation was needed by redesigning the lamp replacement tool. Thus the use of replacement tools for old lamps when used is ineffective. The exposure level for a new lamp replacement is in the range of 20% -35%, meaning that it is accepted and recommended for use. In this case, the proposed lamp replacement tool is quite effective to use.
LAYOUT REDESIGN OF CONTAINER SHAKIGNG FIELD AT PT. XYZ Muhammad Nawir; Andi Pawennari; Ahmad Padhil; A. Dwi Wahyuni. P; Muhammad Dahlan; Takdir Alisyahbana Alisyahbana; Rahmaniah Malik
Journal of Industrial Engineering Management Vol 7, No 2 (2022): Journal of Industrial Engineering and Management Vol 7 No 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v7i2.1258

Abstract

The Layout of the Field Layout Stacking containers is an important thing to consider because it can affect the effectiveness of the loading and unloading process in the field by arranging the Layout of the facilities in the stacking field in the Yard Layout including the Rubber Gantry Crane (RTG) and the arrangement of the lane Head Truck. So, it is necessary to research determining the Layout of containers. The design that will be made will affect the distance the head truck travels to transport containers from the dock. In several studies, two types of determined, Layout have been container namely Parallel Layout where the containers are arranged parallel to the pier, and Perpendicular Layout where the containers are arranged Perpendicular to the pier. Container terminal Makassar New Port using Parallel Layout. To increase the productivity of the loading and unloading process, an analysis of the arrangement of the stacking field is carried out. From the results of the research, the farthest travel distance is 1,048 m, with a total travel distance of 729,269 m with a fuel cost of Rp. 1,144,952 in the initial Layout (Parallel Layout), with the Perpendicular Layout, the farthest travel distance is 353.7 m with a total travel distance of 473,533 m, and the use of materials burn 743,446.8 m