Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Teknologika

Analisa Pengendalian Kualitas Problem Visual Draw Textured Yarn Martiningsih, Martiningsih; Dewanto; Sri Suhartini
Jurnal Teknologika Vol 14 No 1 (2024): Jurnal Teknologika
Publisher : Sekolah Tinggi Teknologi Wastukancana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51132/teknologika.v14i1.254

Abstract

Industri Tekstil merupakan industri yang terus dan selalu berkembang seiring dengan perkembangan jaman. Bertambahnya jumlah manusia yang disertai meningkatnya kebutuhan dari berbagai macam aspek kehidupannya. Semua itu menuntut adanya perubahan kuantitas dan kualitas dari hasil produksi. Di Indonesia ada beberapa industri tekstil yang berskala Internasional. Salah satunya adalah PT. Indorama Synthetics Tbk, dimana perusahaan tersebut dari tahun ke tahun menunjukkan perkembangannya.Perkembangan kapasitas produksi, didukung pembaharuan teknologi dan kemampuan dari sumber daya manusianya.Semua aspek pendukung keberhasilansuatu industri yang merupakan kesatuan berbagai komponen yang tidak saling terlepaskan.Dalam kesempatan ini kami akan menganalisa dari bagian visual tentang salah satu problem kategori cacat yang harus dikontrol untuk mengurangi turunnya grade. Khusus analisa visual yang kami amati dan cermati karena beberapa alasan yang mendasari. Salah satu alasan karena pada periode itu ditemukan jumlah yang cukup besar diatas problem lainnya. Untuk itu perlu kiranya kita lakukan observasi untuk mencari solusi. Setelah kita melakukan observasi dari beberapa hal terkait dan dengan analisa fish bone kita menemukan kesimpulan. Dengan harapan dari kesimpulan tersebut bisa menjadi tambahan acuan untuk Standard Operation Process
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA Muchtar, Diki Muchtar; Dewanto; Yasmina Fajri Fajri
Jurnal Teknologika Vol 14 No 2 (2024): Jurnal Teknologika
Publisher : Sekolah Tinggi Teknologi Wastukancana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51132/teknologika.v14i2.430

Abstract

Standard production time analysis is one of the quantitative analysis method carried out to measure production time and aims to have a standard time as a planning reference before running production so that production time can be in accordance with the predetermined time limit. This analysis is carried out by calculating working time using a stopwatch on 6 (six) work elements, then a data sufficiency test is carried out which aims to determine whether the data needed is sufficient and suitable for analysis and a data uniformity test which aims to determine whether workers have good control while working. After the data is tested, the data is processed by determining the performance rating, calculating allowances and determining the cycle time as the time it takes workers to complete a job, normal time as the time to complete the work completed by workers under reasonable conditions and the standard time results as the output. The results of this study of 6 (six) elemen work, take mix 1- 3 colors from 15 , show that the standard production time of the manual screen printing by size 40 x 60 Cm at CV. Dwi putra Ihwa is 181.38 seconds or 3,023 minutes to complete a screen printing shirt in one cycle. Standard production time analysis is one of the quantitative analysis method carried out to measure production time and aims to have a standard time as a planning reference before running production so that production time can be in accordance with the predetermined time limit. This analysis is carried out by calculating working time using a stopwatch on 6 (six) work elements, then a data sufficiency test is carried out which aims to determine whether the data needed is sufficient and suitable for analysis and a data uniformity test which aims to determine whether workers have good control while working. After the data is tested, the data is processed by determining the performance rating, calculating allowances and determining the cycle time as the time it takes workers to complete a job, normal time as the time to complete the work completed by workers under reasonable conditions and the standard time results as the output. The results of this study of 6 (six) elemen work, take mix 1- 3 colors from 15 , show that the standard production time of the manual screen printing by size 40 x 60 Cm at CV. Dwi putra Ihwa is 181.38 seconds or 3,023 minutes to complete a screen printing shirt in one cycle.