Claim Missing Document
Check
Articles

Developing Citizenship Attitudes and Skills For Civil Engineering Graduates Through Problem-Based Learning Model Approach Frans, Pieter Lourens; Abdin, Maslan; Jakob, Juvrianto Chrissunday
Jurnal Kewarganegaraan Vol. 21 No. 1 (2024): Maret 2024
Publisher : Department of Pancasila and Civic Education, Universitas Negeri Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24114/jk.v21i1.56108

Abstract

AbstrakSikap dan keterampilan kewarganegaraan merupakan hal yang krusial dalam menghadapi tantangan dunia kerja. Dengan pendekatan Model Problem-Based Learning lulusan Teknik Sipil Politeknik Negeri Ambon dapat mengembangkan sikap dan keterampilan secara konkret melalui pengalaman praktis. Dengan demikian, penelitian ini memiliki relevansi yang signifikan untuk mempersiapkan lulusan dalam menghadapi perubahan zaman dan tuntutan dunia kerja yang semakin dinamis. Penelitian menggunakan pendekatan mixed method yaitu penggabungan data penelitian kuantitatif dan kualitatif,  Hasil penelitian yang didapat yaitu dari 19 mahasiswa yang mengikuti pembelajaran nilai rata-rata (Mean) hasil belajar mahasiswa pada variabel sikap sebesar 3,47 selanjutnya variabel keterampilan sebesar 3,53. pembelajaran dengan pendekatan model project based learning menunjukkan dampak positif dengan penilaian baik dan baik sekali, pada sikap mahasiswa mampu menggagas alternatif solusi, kontribusi dan menunjukkan integritas. Pada keterampilan mahasiswa mampu membangun jejaring merefleksikan hal-hal selama proses, memiliki semangat untuk terus memperbaiki lebih baik, mengimplementasikan solusi dan memiliki inisiatif untuk perbaikan bersama.--------------------AbstractHaving the right attitudes and abilities related to citizenship is essential when it comes to dealing with the problems of the professional sphere. The Problem-Based Learning Model enables Civil Engineering graduates from Politeknik Negeri Ambon to cultivate tangible attitudes and abilities via hands-on experience. Therefore, this research holds great importance in equipping graduates to confront the evolving circumstances and the progressively dynamic requirements of the professional sphere. The study employed a hybrid methodological approach, specifically integrating both quantitative and qualitative research data. The research findings were derived from a sample of 19 participants who participated in the study. The mean value of student learning outcomes for the attitude variable was 3.47, while for the skill variable it was 3.53. Implementing a project-based learning paradigm has been found to have a favourable effect on students' attitudes, as evidenced by their ability to provide innovative ideas, actively contribute, and demonstrate integrity, leading to positive assessments. Regarding talents, students possess the ability to establish connections, engage in reflective thinking, have a persistent drive for self-improvement, effectively execute solutions, and exhibit proactive behaviour towards mutual enhancement.
Youth Participation in Rutong Village Development Programme: A Character Development Study Salis, M. Rizkoni; Abdin, Maslan; Maitimu, Nexsien Richard
Jurnal Kewarganegaraan Vol. 22 No. 1 (2025): March 2025
Publisher : Department of Pancasila and Civic Education, Universitas Negeri Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24114/jk.v22i1.64455

Abstract

Robust positive character traits are crucial for cultivating a responsible and integrity-oriented generation. The development of character among youth is pivotal in addressing global challenges. Their active involvement in village development, in accordance with Law Number 6 of 2014, is crucial for the success of such programmes. Youth participation not only benefits the village but also enhances their sense of responsibility, social awareness, and skills. In Rutong Village, Ambon, young people play a significant role in development programmes aimed at improving their quality of life and shaping their character. This research intends to evaluate youth involvement in village development initiatives, the challenges faced, and the analysis of character development. A quantitative descriptive method was employed to understand youth participation and its impact on their character development. The results indicate that the average participation score of youth is 3.30 with a standard deviation of 1.10, reflecting a neutral or hesitant attitude towards their involvement. Several barriers encountered include a lack of time, information, family support, facilities, and engagement in programmes. Meanwhile, the average score of 3.84 with a standard deviation of 0.93 indicates approval of character formation and their moral values.
Kedudukan Dan Peran Mahasiswa Dalam Masyarakat Multikultural Di Politeknik Negeri Ambon Ohorella, Sapia Ainun; Abdin, Maslan; Saptenno, Agustina; Patrouw, Inda Mauren; Nurilhaq, Nu'man Sadidan
Scholars: Jurnal Sosial Humaniora dan Pendidikan Vol. 1 No. 2 (2023): SCHOLARS: Jurnal Sosial Humaniora dan Pendidikan
Publisher : P3M POLITEKNIK NEGERI AMBON

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v1i2.2417

Abstract

The lack of knowledge, awareness and attitudes is an indicator of weakening multiculturalism. If allowed to drag on, it can trigger both vertical and horizontal conflicts in Indonesia. Ambon State Polytechnic students are a multicultural society, this can be seen from the diversity of ethnicity, religion, race and culture of the student community. If this diversity is not accepted or implemented properly, it can result in conflicts related to SARA, and even lead to racism between peers or groups among Ambon State Polytechnic students. This research aims to find out how the practice of multiculturalism towards multicultural communities at the Ambon State Polytechnic. The method approach in this research is mixing methods which are carried out using qualitative methods (direct interviews) and quantitative methods (numbers). The results of the research showed that the level of understanding of Ambon State Polytechnic students was around 53% of students VERY UNDERSTANDING the meaning and position of students and around 47% UNDERSTANDING this. This is reinforced by the results of interviews. Furthermore, student attitudes towards diversity at Polnam showed VERY GOOD 58%; GOOD 22%; and PRETTY GOOD 20%. This is also confirmed by the results of interviews from the 5th. And if we look at the implementation of multiculturalism at POLNAM, 93% of POLNAM students have practiced multiculturalism, while around 7% of students have not implemented a multiculturalism attitude.Keywords: conflict, multicultural society, multiculturalism
PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN REVITALISASI DAN PENGEMBANGAN ASRAMA HAJI WAIHERU AMBON Talaohu, Tomabuji; Sahusilawane, Tonny; Abdin, Maslan
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1679

Abstract

The revitalization and construction of the Waiheru Ambon hajj dormitory building, the method used in this research is the validation test, reliability test, f test and t test using the SPSS V16 tool where in this method the questionnaire data will be obtained which will then be analyzed with the SPSS V16 tool. The research results were obtained based on the results of data analysis that has been carried out to solve the problem in this research where when conducting research on project implementation such as column casting work, it is often found that the workforce is not effective and efficient when pressing the vibrator so that when dismantling the formwork you can see many columns. which is corroded, then obtained: 1) The positive influence between competence on labor productivity can be seen from the t-count of  5.149 > t-table 1.724 and sig value = 0.000 < 0.05 which means that competence is very influential in influencing labor productivity. 2) The positive effect between skills on labor productivity can be seen from the t-count of 3.732 > t table 1.724 and sig value = 0.001 < 0.05 which means that skills is very influential in influencing labor productivity. 3) The positive effect of work discipline on labor productivity can be seen from the t-count of 11.992 > t-table 1.724 and sig value = 0.000 < 0.05 which means that work discipline is very influential in influencing labor productivity. 4) The positive influence between the level of income on labor productivity can be seen from the t-count 3.968 > t-table 1.724 and sig value = 0.001 < 0.05 which means that the level of income is very influential in influencing labor productivity. 
PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP PROYEK PEMBANGUNAN GEDUNG RUANG KELAS BARU (RKB) MADRASAH IBTIDAIYAH NEGERI 5 MALUKU TENGAH Nahumarury, Aulia; Serang, Rudy; Abdin, Maslan
Journal Agregate Vol. 3 No. 1 (2024): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Construction  projects are one of the of the activities where the results of the work are influenced by the productivity of the workforce. Activities in construction projects are interrelated, so that if one activity is late it will hinder other activities in the field. Likewis, construction activities are complex work and require more attention in their implementation. The aim of  this research is to obtain what factors influence labor productivity and determine the presentation of the influence of independent variables on labor productivity in the classroom building (RKB) construction project of madrasah ibtidaiyah negeri 5 maluku tengah. The analysis method used in the research this is with the help of the SPSS version 26 program. In the  new classroom building (RKB) Construction project of madrasah ibtidaiyah negeri 5 maluku tengah there are several factor that influence labor productivity including labor, material, weather and environmental factors and the presentation of the influence of independent variables on labor productivity, which is 88.1% and the remaining 11.9% was influenced by other variables not tested in this study.
ANALISIS PERCEPATAN PADA PROYEK PEMBANGUNAN RUANG KELAS BARU MADRASAH IBTIDAIYAH NEGERI 5 MALUKU TENGAH DENGAN MENGGUNAKAN METODE CRASHING PROGRAM Salong, Ahmat ikbal; Leuhery, Lenora; Abdin, Maslan
Journal Agregate Vol. 3 No. 1 (2024): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i1.2123

Abstract

There are several aspects of project implementation management, such as implementation plans, schedules, and others. The emergence of problems in the implementation management aspect hurts project implementation. Then the alternatives that are usually used to support the acceleration of activities is to increase working hours so that it has an impact on the total project cost. The Madrasah Ibtidaiyah Negeri 5 Maluku Tengah New Classroom Construction Project was chosen for the research study because it experienced delays. The CPM (critical path method) is used to analyze the project implementation time to obtain critical work that has no leeway days to be accelerated. The optimal time and cost are obtained from the Crash Program using the Crashing method by adding working hours to each accelerated critical work. From the acceleration, the cost slope value is obtained. the purpose of this research is to determine what work is critical in the project and also get the results of analyzing the calculation of time and cost of work after being accelerated. The result showed that the total normal project cost budget of Rp 2,891,000,000 with an implementation duration of 120 days, in conditions after crashing with an alternative of adding working hours for two hours obtained a cost of Rp 2,943,185,364 greater than the total project cost budget under normal conditions and a reduction in duration to 110 days or faster than the normal duration. The total cost slope value obtained was Rp 64,231,234.
ANALISIS FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN GEDUNG RUANG KELAS BARU MADRASAH 5 MALUKU TENGAH Umarella, Risma; Leuhery, Lenora; Abdin, Maslan
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2221

Abstract

The construction project for the Central Maluku 5 Madrasah New Classroom Building project was carried out by CV Nadilla with a contract value of Rp. 2,891,000,000 and the duration of work is 119 calendar days in accordance with the contents of the work contract. The Central Maluku 5 Madrasah New Classroom Building Construction project experienced a delay in the 1st (first) week, with a cumulative plan of 0.15% but in reality it was 0.00%. then in the 14th week with a cumulative plan of 20.54% but in reality it was obtained 17.50%. and the 15th week with a cumulative plan of 44.26% but in reality it was obtained 42.03%. The research method uses data collection techniques and questionnaires with the types of data used are primary data and secondary data. Methods of data analysis using validity test, reliability test, factor analysis test, and F test and T test using toolsStatistical Program for Social Scine (SPSS) version 29 where in this method data will be obtained from the results of the questionnaire which will then be analyzed with the SPSS version 29 tool. The magnitude of the influence of the factors causing the delay in the Construction Project for the New Classroom Building for Madrasah 5 Central Maluku is due to the Labor factor (X1), Material (X2), Environmental (X3), and Managerial (X4), have an effect on the Delay variable (Y), because the significant value obtained is 0.000 which is smaller than 0.05 and the calculated F value obtained is 103.072 which is greater than the F table value of 2.74. The components of the factors causing the delay in the construction project of the New Classroom Building for Madrasah 5 Central Maluku were caused by the Labor factor (X1) with a valueStandardized Coefficients Beta of 0.369, Material (X2) with valueStandardized Coefficients Beta of 0.271, Environment (X3) with a valueStandardized Coefficients Beta of 0.222, and Managerial factor (X4) with valueStandardized Coefficients Beta of 0.196.
Analisa Tingkat Kerusakan Dan Estimasi Biaya Perbaikan Bangunan Gedung Sekolah Citra Kasih Ambon Liline, Firlando; Leuhery, Lenora; Abdin, Maslan
Jurnal Penelitian Multidisiplin Bangsa Vol. 2 No. 7 (2025): Desember
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v2i7.661

Abstract

Pemeliharaan dan perawatan bangunan gedung merupakan upaya menjaga keandalan dan kelayakan fungsi bangunan melalui pengendalian kerusakan serta perbaikan komponen yang terdampak. Penelitian ini bertujuan menganalisis tingkat kerusakan pada Gedung Sekolah Citra Kasih Ambon, mengidentifikasi jenis dan penyebab kerusakan, serta memperoleh estimasi biaya perbaikan menggunakan metode pembobotan yang mengacu pada Permen PUPR No. 24/PRT/M/2008, AHSP 2022, dan Basic Price 2022. Survei lapangan dilakukan melalui observasi visual dan pengukuran luas kerusakan pada komponen atap, plafon, pelat lantai, dinding, dan cat bangunan. Hasil penelitian menunjukkan kerusakan atap asbes sebesar 100%, plafon 85,4%, cat dinding 100%, pelat lantai 0,0073%, dan dinding 0,010818%. Secara keseluruhan, tingkat kerusakan bangunan mencapai 16,206% dan dikategorikan sebagai rusak ringan. Estimasi biaya perbaikan sebesar Rp 507.553.688,82 yang mencakup pekerjaan arsitektural, finishing, dan utilitas. Temuan ini memberikan gambaran komprehensif mengenai kondisi bangunan dan dapat menjadi dasar untuk penyusunan strategi pemeliharaan serta rehabilitasi yang lebih efektif.
PENGARUH PRODUKTIVITAS TERHADAP TENAGA KERJA PADA PEMBANGUNAN LABORATORIUM TERPADU DAN PERPUSTAKAAN MADRASAH ALIYAH NEGERI (MAN) 1 MALUKU TENGAH Essy, Icang; Metekohy, Selly; Abdin, Maslan
JURNAL SIMETRIK Vol 12 No 1 (2022): Jurnal Simetrik (Sipil, Mesin, Listrik)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v12i1.1064

Abstract

Minimnya keterampilan dalam pekerjaan konstruksi dapat berepengaruh terhadap produktivitas pekerjaan seperti terjadi keterlambatan proyek dan juga berdampak terhadap biaya. Pengalaman, Usia dan Pendidikan merupakan indikator sumber daya manusia yang menjadi kontribusi besar dalam peningkatan produktivitas pekerjaan apa bila menjadi prioritas dalam merekrut tenaga kerja proyek. Tujuan dari penelitian ini yaitu Mengetahui pengaruh pengalaman, Umur dan Pendidikan terhadap produktivitas tenaga kerja. Populasi adalah pekerja konstruksi pada gedung MAN 1 Maluku Tengah sejumlah 30 pekerja. Adapun metode penelitian yang digunakan yaitu deskriptif kualitatif pengolahan data dengan bantuan program aplikasi SPSS. v 16. Uji instrumen, uji validitas dan uji relibilitas. Analisis data yang digunakan adalah uji hipoteis meliputi uji F ( anova ), uji T. Hasil penelitian memberikan kesimpulan sebagai berikut : (1) pengalaman nilai output thitung -0.732 ˂ 2.048, dan niali probabilitas variabel adalah sig = 0.470 > 0.05 sehingga keputusan yang diambil adalah HO diterima dan HI ditolak. (2) umur nilai output thitung 2.437 > 2.048, dan niali probabilitas adalah sig = 0.022 ˂ 0.05, sehingga keputusan yang diambil adalah HO ditolak dan HI diterima.(3) pendidikan nilai output thitung -1.860 ˂ 2.048, dan nilai probabilitas adalah sig = 0.074 > 0.05 sehingga keputusan yang diambil adalah HO dterima  dan HI ditolak. Dari ke tiga variabel diatas yang memiliki pengaruh signifikan yaitu variabel umur dengan nilai output thitung 2.473 > 2.048, dan niali probabilitas adalah sig = 0.022 ˂ 0.05.
Tinjauan Perhitungan Rencana Anggaran Biaya (RAB) Non-Struktur dan Penjadwalan Pada Pembangunan Kantor Kejaksaan Negeri Tual Fathin Azzahra Suat; La Mohamat Saleh; Maslan Abdin
Jurnal Multidisiplin Teknologi dan Arsitektur Vol. 4 No. 1 (2026): Mei 2026
Publisher : CV. Rayyan Dwi Bharata

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57235/motekar.v4i1.8413

Abstract

Development is a continuous process carried out to improve the sosial and economic indicators of a region over time. One of the important stages in the emplementation of a construction project is the calculation of the Budget Plan (RAB), as it serves to answer question related to the total cost required for a building. In the construction project of the District Attomey’s Office, particularly as a public facility, budget planning is curcial to ensure the project runs according to plan. This study aims to determine the non-structural work budget using the Unit Price Analysis (AHSP) PUPR No.8 of 2023 and the 2024 Basic Price data, as well as to analyze the project duration using the Critical Path Method (CPM) and S-Curve method. The results of the study show that the estimated cost of non-structural work is IDR 1,538,390,000.00. For scheduling, the duration obtained was 5 months using the S-Curve method and 89 weeks using the CPM method. Thus, these findings provide a comprehensive overview of the cost and time requirements for the implementation of the Tual District Attorney’s Office construction project.