Claim Missing Document
Check
Articles

Found 40 Documents
Search

Developing Citizenship Attitudes and Skills For Civil Engineering Graduates Through Problem-Based Learning Model Approach Frans, Pieter Lourens; Abdin, Maslan; Jakob, Juvrianto Chrissunday
Jurnal Kewarganegaraan Vol 21, No 1 (2024): Maret 2024
Publisher : Department of Pancasila and Civic Education, Universitas Negeri Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24114/jk.v21i1.56108

Abstract

AbstrakSikap dan keterampilan kewarganegaraan merupakan hal yang krusial dalam menghadapi tantangan dunia kerja. Dengan pendekatan Model Problem-Based Learning lulusan Teknik Sipil Politeknik Negeri Ambon dapat mengembangkan sikap dan keterampilan secara konkret melalui pengalaman praktis. Dengan demikian, penelitian ini memiliki relevansi yang signifikan untuk mempersiapkan lulusan dalam menghadapi perubahan zaman dan tuntutan dunia kerja yang semakin dinamis. Penelitian menggunakan pendekatan mixed method yaitu penggabungan data penelitian kuantitatif dan kualitatif,  Hasil penelitian yang didapat yaitu dari 19 mahasiswa yang mengikuti pembelajaran nilai rata-rata (Mean) hasil belajar mahasiswa pada variabel sikap sebesar 3,47 selanjutnya variabel keterampilan sebesar 3,53. pembelajaran dengan pendekatan model project based learning menunjukkan dampak positif dengan penilaian baik dan baik sekali, pada sikap mahasiswa mampu menggagas alternatif solusi, kontribusi dan menunjukkan integritas. Pada keterampilan mahasiswa mampu membangun jejaring merefleksikan hal-hal selama proses, memiliki semangat untuk terus memperbaiki lebih baik, mengimplementasikan solusi dan memiliki inisiatif untuk perbaikan bersama.--------------------AbstractHaving the right attitudes and abilities related to citizenship is essential when it comes to dealing with the problems of the professional sphere. The Problem-Based Learning Model enables Civil Engineering graduates from Politeknik Negeri Ambon to cultivate tangible attitudes and abilities via hands-on experience. Therefore, this research holds great importance in equipping graduates to confront the evolving circumstances and the progressively dynamic requirements of the professional sphere. The study employed a hybrid methodological approach, specifically integrating both quantitative and qualitative research data. The research findings were derived from a sample of 19 participants who participated in the study. The mean value of student learning outcomes for the attitude variable was 3.47, while for the skill variable it was 3.53. Implementing a project-based learning paradigm has been found to have a favourable effect on students' attitudes, as evidenced by their ability to provide innovative ideas, actively contribute, and demonstrate integrity, leading to positive assessments. Regarding talents, students possess the ability to establish connections, engage in reflective thinking, have a persistent drive for self-improvement, effectively execute solutions, and exhibit proactive behaviour towards mutual enhancement.
Faktor Penghambat Pemenuhan Hak Pendidikan Disabilitas di Kota Ambon Abdin, Maslan; Tetelepta, Johanes Mateos
Jurnal Kewarganegaraan Vol 18, No 2 (2021): September 2021
Publisher : Department of Pancasila and Civic Education, Universitas Negeri Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (43.963 KB) | DOI: 10.24114/jk.v18i2.26957

Abstract

AbstractPeople with disabilities in Ambon City are part of the citizens who must be given the right to education in a fair and non-discriminatory manner by upholding human rights. Obstacle factors in the fulfilment of education will certainly exist. The government as the executor of the constitution is responsible for efforts to resolve it. This study uses a qualitative research design with a case study method. The subjects in this study are schools, parents and the Ambon city government. The results of the identification and analysis found that the factors that hindered the fulfilment of education for persons with disabilities in the city of Ambon, among others (1) parents of students, among others, parents still feel ashamed of the condition of their children, busy parents and access to special schools that are far away. (2) Inadequate school facilities and infrastructure according to the individual needs of each child with disabilities. (3) Only 23% of the accompanying teachers have special education qualifications from the total number of accompanying teachers, namely 116 teachers. On average, the accompanying teachers are classroom teachers and subject teachers with non-special needs education qualifications.-------------AbstrakPenyandang disabilitas di Kota Ambon menjadi bagian dari warga Negara yang harus diberikan hak pendidikannya secara berkeadilan serta tidak diskriminatif dengan menjunjung tinggi hak asasi manusia. Faktor kendala dalam pemenuhan pendidikan pasti akan ada. Pemerintah sebagai pelaksana konstitusi bertanggung jawab dalam upaya penyelesaiannya. Penelitian ini menggunakan desain penelitian kualitatif dengan metode studi kasus, Subjek dalam penelitian ini yaitu sekolah, orang tua dan pemerintah kota ambon. Hasil identifikasi dan analisis menemukan bahwa faktor kendala dalam pemenuhan pendidikan bagi penyandang disabilitas di kota Ambon antara lain (1) orang tua siswa antara lain orang tua masih merasa malu dengan keadaan anak, kesibukan orang tua dan akses ke sekolah luar biasa yang jauh. (2) Sarana dan prasarana sekolah yang kurang memadai sesuai kebutuhan individu masing-masing anak disabilitas. (3) Guru pendamping 23% saja yang berkualifikasi pendidikan khusus dari jumlah keseluruhan guru pendamping yaitu 116 guru. Rata-rata guru pendamping adalah guru kelas dan guru mapel dengan tamatan bukan berkualifikasi pendidikan kebutuhan khusus.
Potret Sikap Toleransi Mahasiswa: Studi Kasus di Politeknik Negeri Ambon Nanlohy, Pradythia Aurellai; Abdin, Maslan; Latar, Sjafrudin
Scholars: Jurnal Sosial Humaniora dan Pendidikan Vol. 1 No. 1 (2023): SCHOLARS: Jurnal Sosial Humaniora dan Pendidikan
Publisher : P3M POLITEKNIK NEGERI AMBON

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Students are able to appear as vanguards in realizing tolerance and harmony in society, students are inseparable parts of society. Intolerance that occurs in society is a trigger that needs to be resolved. As intellectual beings, students are certainly able to sort out problems objectively and critically. It is these advantages that are expected to be able to give hope for unity in Indonesia. The research aims to analyze and provide an overview of the tolerance attitude of Ambon State Polytechnic students. The research method uses descriptive statistical quantitative analysis. The results of the study found that tolerance showed normal or positive data. This was caused by dividing the value of skewness by the error of skewness where the variable Attitude of Tolerance was 0.565/0.302 = 1.87. This value shows normal because it has a position between -2 and +2. reinforced by survey data in the field showing that the average student who is met disagrees with things that support intolerance and are more supportive of tolerance, so they don't choose things that challenge the tolerance valueKeywords: Tolerance, Attitude, Student
Kedudukan Dan Peran Mahasiswa Dalam Masyarakat Multikultural Di Politeknik Negeri Ambon Ohorella, Sapia Ainun; Abdin, Maslan; Saptenno, Agustina; Patrouw, Inda Mauren; Nurilhaq, Nu'man Sadidan
Scholars: Jurnal Sosial Humaniora dan Pendidikan Vol. 1 No. 2 (2023): SCHOLARS: Jurnal Sosial Humaniora dan Pendidikan
Publisher : P3M POLITEKNIK NEGERI AMBON

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v1i2.2417

Abstract

The lack of knowledge, awareness and attitudes is an indicator of weakening multiculturalism. If allowed to drag on, it can trigger both vertical and horizontal conflicts in Indonesia. Ambon State Polytechnic students are a multicultural society, this can be seen from the diversity of ethnicity, religion, race and culture of the student community. If this diversity is not accepted or implemented properly, it can result in conflicts related to SARA, and even lead to racism between peers or groups among Ambon State Polytechnic students. This research aims to find out how the practice of multiculturalism towards multicultural communities at the Ambon State Polytechnic. The method approach in this research is mixing methods which are carried out using qualitative methods (direct interviews) and quantitative methods (numbers). The results of the research showed that the level of understanding of Ambon State Polytechnic students was around 53% of students VERY UNDERSTANDING the meaning and position of students and around 47% UNDERSTANDING this. This is reinforced by the results of interviews. Furthermore, student attitudes towards diversity at Polnam showed VERY GOOD 58%; GOOD 22%; and PRETTY GOOD 20%. This is also confirmed by the results of interviews from the 5th. And if we look at the implementation of multiculturalism at POLNAM, 93% of POLNAM students have practiced multiculturalism, while around 7% of students have not implemented a multiculturalism attitude.Keywords: conflict, multicultural society, multiculturalism
PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP PROYEK PEMBANGUNAN GEDUNG RUANG KELAS BARU (RKB) MADRASAH IBTIDAIYAH NEGERI 5 MALUKU TENGAH Nahumarury, Aulia; Serang, Rudy; Abdin, Maslan
Journal Agregate Vol. 3 No. 1 (2024): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Construction  projects are one of the of the activities where the results of the work are influenced by the productivity of the workforce. Activities in construction projects are interrelated, so that if one activity is late it will hinder other activities in the field. Likewis, construction activities are complex work and require more attention in their implementation. The aim of  this research is to obtain what factors influence labor productivity and determine the presentation of the influence of independent variables on labor productivity in the classroom building (RKB) construction project of madrasah ibtidaiyah negeri 5 maluku tengah. The analysis method used in the research this is with the help of the SPSS version 26 program. In the  new classroom building (RKB) Construction project of madrasah ibtidaiyah negeri 5 maluku tengah there are several factor that influence labor productivity including labor, material, weather and environmental factors and the presentation of the influence of independent variables on labor productivity, which is 88.1% and the remaining 11.9% was influenced by other variables not tested in this study.
ANALISIS PERCEPATAN PADA PROYEK PEMBANGUNAN RUANG KELAS BARU MADRASAH IBTIDAIYAH NEGERI 5 MALUKU TENGAH DENGAN MENGGUNAKAN METODE CRASHING PROGRAM Salong, Ahmat ikbal; Leuhery, Lenora; Abdin, Maslan
Journal Agregate Vol. 3 No. 1 (2024): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i1.2123

Abstract

There are several aspects of project implementation management, such as implementation plans, schedules, and others. The emergence of problems in the implementation management aspect hurts project implementation. Then the alternatives that are usually used to support the acceleration of activities is to increase working hours so that it has an impact on the total project cost. The Madrasah Ibtidaiyah Negeri 5 Maluku Tengah New Classroom Construction Project was chosen for the research study because it experienced delays. The CPM (critical path method) is used to analyze the project implementation time to obtain critical work that has no leeway days to be accelerated. The optimal time and cost are obtained from the Crash Program using the Crashing method by adding working hours to each accelerated critical work. From the acceleration, the cost slope value is obtained. the purpose of this research is to determine what work is critical in the project and also get the results of analyzing the calculation of time and cost of work after being accelerated. The result showed that the total normal project cost budget of Rp 2,891,000,000 with an implementation duration of 120 days, in conditions after crashing with an alternative of adding working hours for two hours obtained a cost of Rp 2,943,185,364 greater than the total project cost budget under normal conditions and a reduction in duration to 110 days or faster than the normal duration. The total cost slope value obtained was Rp 64,231,234.
Tinjauan Rencana Anggaran Biaya Proyek Rehabilitasi Kantor Gubernur Maluku Menggunakan AHSP Permen PUPR No 1 Tahun 2022 Toisutta, Siti Aisa; Leuhery, Lenora; Abdin, Maslan
Jurnal Penelitian Multidisiplin Bangsa Vol. 1 No. 4 (2024): September
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v1i4.60

Abstract

Rencana anggaran biaya adalah perencanaan anggaran biaya suatu proyek yang disusun agar dapat mengetahui seberapa besar kebutuhan biaya suatu proyek. Untuk itu Sebuah proyek konstruksi memerlukan perkiraan biaya dalam penyelenggaraan suatu proyek yang disusun dengan baik dan teliti berdasarkan metode analisa yang dipakai. Metode SNI merupakan pembaharuan dari analisa BOW (Burgeslijke Openbare Werken) 1921 yang dikeluarkan oleh Pusat Penelitian dan Pengembangan Permukiman. Metode AHSP (Analisa Harga Satuan Pekerjaan) adalah pedoman analisa yang dikeluarkan oleh Kementrian Pekerjaan Umum dan Perumahan Rakyat (PUPR). Hasil estimasi anggaran biaya menggunakan metode AHSP Permen PUPR 2022 sebesar Rp.6.389,724,000,00 dan estimasi anggaran biaya menggunakan metode SNI 2008 sebesar Rp.5.971,082,000,00 dengan selisih dari metode AHSP permen pupr 2022 dan SNI 2008 sebesar Rp.418,642,000,00 dan presentasi selisih 6,55%.
Kajian Sistem Penyediaan Air Bersih Pada Masyarakat Halong Atas Kecamatan Baguala Kota Ambon Jusuf, Hesti La; Serang, Rudi; Abdin, Maslan; Matitaputty, Apri Adam
Jurnal Penelitian Multidisiplin Bangsa Vol. 1 No. 4 (2024): September
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v1i4.62

Abstract

Sumber air bersih untuk kebutuhan hidup sehari-hari secara umum harus memenuhi standar kuantitas dan kualitas. Air bersih merupakan kebutuhan utama manusia bagi keberlangsungan hidup secara berkelanjutan. Penggunaan air bersih sangat penting untuk aktivitas manusia diantaranya minum, mandi, mencuci dan keperluan lainnya. Karena itu wajar bila sektor air bersih mendapatkan prioritas penanganan utama karena menyangkut kehidupan banyak orang. Penelitian ini menunjukkan bahwa ketersediaan air bersih mengalami permasalahan yang ditemui adalah ketersediaan air tidak mencukupi untuk kebutuhan sehari hari dikarenakan setiap tahun mengalami penambahan jumlah penduduk dan alih fungsi lahan dimana daerah tangkapan air yang tadinya hutan sudah dijadikan menjadi lahan pertanian dan perumahan penduduk. Data yang digunakan dalam penelitian ini diperoleh melalui data primer yang di lakuakan melalui pengambilan dan pengukuran di lapangan berupa pengamatan dan pencatatan kondisi air pada sumber air negeri Halong khususnya di Halong Atas RT 17 dan RT 18, dan data sekunder yang dimana data yang di gunakan adalah data penduduk dan debit air. Metode aritmatik digunakan untuk menghitung rata-rata kebutuhan dan ketersediaan air bersih per kapita sedangkan metode geometrik tujuan dari penelitian ini adalah mendapatkan ketersediaan debit air untuk mencukupi kebutuhan air bersih prediksi 10 tahun kedepan dan mendapatkan kapasitas distribusi yang diperlukan untuk mencukupi kebutuhan setempat. Berdasarkan hasil analisis ketersediaan debit air kebutuhan air bersih Halong Atas RT 17 dan RT 18 prediksi 10 tahun kedepan adalah 115,35 m³/hari dan kapasitas distribusi yang diperlukan tidak dapat mencukupi kebutuhan air bersih adalah 198 m³/hari.
Analisis Penerapan Sistem Manajemen Perlindungan SMK3 (Studi Kasus pada Proyek Rehabilitasi Sistem Jaringan Irigasi D.I Way Apu) Arifin, Mohamad Wirman; Jamlaay, Octovianus; Abdin, Maslan
Jurnal Penelitian Multidisiplin Bangsa Vol. 1 No. 5 (2024): Oktober
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v1i5.73

Abstract

Dalam pelaksanaan pekerjaan rehabiliasi jaringan irigasi ini baik itu pihak perusahaan dan tenaga kerja dilapangan dalam penerapan keselamatan dan kesehatan kerja (SMK3) belum terlihat maksimal hal ini sesuai dengan data obeservasi terlihat ketersediaan alat perlindungan diri dengan jumlah pekerja tidak sebanding. Dari masalah ini berakibat terjadinya kecelakaan baik itu bersifat ringan maupun sedang. Metode penelitian dilakukan dengan penyebaran kuesioner. Teknik analisis data  yang dipakai adalah metode kuantitaif menggunakan software SPSS 26. Analisis data dimulai dari uji validitas, uji reliabilitas dan analisis regresi linear berganda. Dari hasil analisis yang dilakukan, terdapat pengaruh signifikan (X1) berdasarkan Thitung 3,068>Ttabel 2,059. (X2) dengan nilai signifikan berdasarkan Thitung  3,508>Ttabel 2,059. dan (X3) dengan nilai siknifikan berdasarkan Thitung  3,809>Ttabel  2,059 terhadap Perlindungan K3 (Y). dan berdasarkan Fhitung 107,246>Ftabel 2,74 sehingga Hi diterima, maka keputusan yang diambil Perlindungan K3 (Y) dipengaruhi secara parsial/individu dan simultan/bersama-sama oleh (X1),(X2) dan (X3). Korelasi parsial antara variabel (X1) dengan (Y) diperoleh nilai r = 0,883. Variabel (X2) dengan (Y) diperoleh nilai r = 0,851 dan variabel (X3) dengan (Y) diperoleh nilai r = 0,923. Nilai dari ketiga variabel menunjukan hubungan yang kuat positif terhadap Perlindungan K3. maksud kuat positif disini adalah terjadi hubungan yang searah antara varibel (X) dan (Y). korelasi secara simultan antara variabel (X1),(X2) dan (X3) terhadap Perlindungan K3 memberikan kontribusi sebesar 86% sisanya 14% dipengaruhi oleh variabel lain, pada Proyek Rehabilitas Jaringan Irigasi di Way Apu Sistem (Sub. D.I Way Pamali, Way Leman, Way Lo).
Pengaruh Karakteristik Tenaga Kerja Terhadap Produktivitas Kerja Pada Proyek Pembangunan Gedung Baru Madrasah Ibtidaiyah Negeri 5 Kabupaten Maluku Tengah Saleh, Arsana; Serang, Rudi; Abdin, Maslan; Matitaputty, Apri Adam; Kakaly, Sulastri
Jurnal Penelitian Multidisiplin Bangsa Vol. 1 No. 6 (2024): November
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v1i6.77

Abstract

Produktivitas kerja adalah salah satu faktor utama dalam kesuksesan suatu proyek konstruksi. Salah satu faktor yang memiliki potensi besar dalam mempengaruhi produktivitas kerja adalah karakteristik tenaga kerja. Karakteristik tenaga kerja mencakup berbagai aspek seperti tingkat kedisiplinan, lingkungan, keterampilan, dan faktor lain yang terkait dengan individu yang bekerja dalam suatu proyek konstruksi. Pada pembagunan Gedung Ruang Kelas Baru Madrasah Ibtidaiyah Negeri 5 Maluku Tengah masalah yang yang terjadi  yaitu para tenaga kerja yang sering datang terlambat, keterbatasan lokasi proyek, dan kurangnya keterampilan para pekerja.Dari ketiga faktor di atas  berpengaruh terhadap proyek kontruksi yang di kerjakan. Tujuan dari penelitian ini untuk Menganalisis hubungan yang signifikan antara karakteristik tenaga kerja terhadap produktivitas kerja dan Menganalisis pengaruh karakteristik tenaga kerja terhadap produktivitas kerja pada proyek pembangunan Gedung Ruang Kelas Baru Madrasah Ibtidaiyah Negeri 5 Maluku Tengah. Penelitian  Proyek Pembangunan Gedung Ruang Kelas Baru  Madrasah Ibtidaiyah Negeri 5 Maluku Tengah yang berlokasi di Jln.Panditalow-Tulehu, Kecamatan Salahutu kabupaten Maluku Tengah, Provinsi Maluku. Berdasarkan hasil analisis karakterisitk tenaga kerja memiliki Hubungan yang signifikan terhadap produktivitas (Y), dengan nilai variabel kedisiplinan (X1) yaitu sebesar 23,2 %, variabel faktor lingkungan sebesar 18,3 %, dan variabel keterampilan (X3) sebesar 16,7 %. Dengan demikian variabel kedisiplinan (X1) memiliki pengaruh yang lebih dominan terhadap variabel Y. sedangkan pengaruh karakteristik tenaga kerja terhadap produktivitas kerja sebesar 0,582 atau 58,2% dan sisahnya sebesar 41,8% dipengaruhi oleh variabel lain yang tidak di uji dalam penelitian ini.