Claim Missing Document
Check
Articles

Found 12 Documents
Search

ANALISIS HASIL BELAJAR SISWA KELAS X BERDASARKAN NILAI UN DAN PILIHAN PSB ONLINE SMK NEGERI 5 PADANG 327-331 , Putri Ayu Dwiyana
CIVED Vol 2, No 1 (2014): Maret 2014
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (148.584 KB) | DOI: 10.24036/cived.v2i1.3395

Abstract

ABSTRACT   This study aimed to analyze student learning outcomes based on the value of the UN and the PSB online selection of class X in SMK Negeri 5 Padang Academic Year 2012/2013. Type of research is comparative and correlational research. Sampling technique that is proportional random sampling with a sample of 224 students. Based on the results of different test data analysis with One Way ANOVA significance value 0.766> 0.05, then there is no difference in the value of the learning outcomes of students who pass option 1, 2 and 3 of each course. In correlation with Product Moment analysis shows generate significant value 0.611> 0.05 alpha so there is no relationship between the value of the UN with the learning outcomes of students of class X of SMK Negeri 5 Padang Academic Year 2012/2013. Keywords : PSB Online , Value UN , Learning Outcomes
Kolaborasi Pemangku Kepentingan dalam Identifikasi Penentuan Lokasi Pembangunan Gedung Galeri Dekranasda Kota Pangkalpinang Ilpandari, Ilpandari; Sabri, Fadillah; Maini, Miskar; Yudi, Ahmad; Ribowo, Anggarani Budi; Yuliyanto, Andry; Sitepu, Arif Rahman Hakim; Kiranaratri, Ayudia Hardiyani; Aprilia, Ayu Sinta; Khanza, Ayu Kamila; Marina, Bernaditha Catur; Saputra, Cahyo Agung; Zhafira, Elian; Prayogi, Galih Rio; Tambunan, Hermon Frederik; Fitriana, Indri Rahmandhani; Hayati, Julita; Susanti, Junita Eka; Kirtinanda. P, Kirtinanda. P; Mardika, M Gilang Indra; Michael, Michael; Nadi, Muhammad Abi Berkah; Dwiyana, Putri Ayu; Kurniawan, Rahmat; Ekaputra, Reza Asriandi; Apriwelni, Siska; Syuhada, Syahidus; Sihombing, Tera Melya Patrice
Jurnal Pengabdian Masyarakat Bangsa Vol. 2 No. 12 (2025): Februari
Publisher : Amirul Bangun Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpmba.v2i12.2031

Abstract

Pembangunan Gedung Galeri Dekranasda di Kota Pangkalpinang merupakan langkah strategis untuk mendukung pengembangan sektor ekonomi kreatif, khususnya kerajinan tangan khas Bangka Belitung. Gedung ini dirancang sebagai pusat promosi, pameran, dan pemasaran produk kerajinan lokal, sekaligus menjadi simbol identitas budaya daerah. Salah satu aspek penting dalam perencanaan pembangunan adalah penentuan lokasi yang strategis, dengan mempertimbangkan aksesibilitas, konektivitas, dan potensi pengembangan kawasan. Kegiatan pengabdian kepada masyarakat ini bertujuan untuk mendampingi proses kolaborasi pemangku kepentingan dalam menentukan lokasi pembangunan Gedung Galeri Dekranasda. Metodologi yang digunakan meliputi observasi lapangan, analisis spasial, dan diskusi kelompok terfokus dengan pemerintah daerah, pengrajin, komunitas lokal, serta akademisi. Pendekatan kolaboratif ini bertujuan untuk memastikan bahwa keputusan yang diambil bersifat inklusif, berbasis data, dan berkelanjutan. Hasil kegiatan ini memberikan alternatif lokasi terbaik untuk pembangunan Gedung Galeri Dekranasda berdasarkan kajian teknis dan social yaitu direncanakan pada tiga alternatif lokasi, yaitu Lokasi 1 (Taman Mandara), Lokasi 2 (Tumpuk Pinangpura), dan Lokasi 3 (Tugu Remangok, Jl. Selindung). Ketiga lokasi tersebut telah dikaji berdasarkan berbagai aspek teknis, termasuk aksesibilitas melalui jalan lokal, ketersediaan jaringan air bersih, listrik, telekomunikasi tetap, penerangan jalan, dan kedekatan dengan tempat pembuangan sampah sementara (TPS). Namun, infrastruktur pemadam kebakaran belum tersedia di ketiga lokasi tersebut.
Pendampingan Teknis Identifikasi Pedagang untuk Proyek Relokasi dan Perluasan Pasar Muntok di Kabupaten Bangka Barat Ilpandari, Ilpandari; Sabri, Fadillah; Maini, Miskar; Yudi, Ahmad; Ribowo, Anggarani Budi; Yuliyanto, Andry; Sitepu, Arif Rahman Hakim; Kiranaratri, Ayudia Hardiyani; Aprilia, Ayu Sinta; Khanza, Ayu Kamila; Marina, Bernaditha Catur; Saputra, Cahyo Agung; Zhafira, Elian; Prayogi, Galih Rio; Tambunan, Hermon Frederik; Fitriana, Indri Rahmandhani; Hayati, Julita; Susanti, Junita Eka; Kirtinanda. P, Kirtinanda. P; Mardika, M Gilang Indra; Michael, Michael; Nadi, Muhammad Abi Berkah; Dwiyana, Putri Ayu; Kurniawan, Rahmat; Ekaputra, Reza Asriandi; Apriwelni, Siska; Syuhada, Syahidus; Sihombing, Tera Melya Patrice
Jurnal Pengabdian Masyarakat Bangsa Vol. 2 No. 12 (2025): Februari
Publisher : Amirul Bangun Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpmba.v2i12.2032

Abstract

Pasar Muntok memiliki sejarah panjang sebagai pusat aktivitas ekonomi di Bangka Barat. Namun, peningkatan jumlah pedagang dan kunjungan masyarakat memunculkan berbagai permasalahan, seperti kemacetan, ketidakteraturan tata letak, dan keterbatasan fasilitas pendukung. Untuk mengatasi hal tersebut, Pemerintah Kabupaten Bangka Barat memulai proyek strategis relokasi dan perluasan Pasar Muntok guna menciptakan lingkungan perdagangan yang lebih modern, tertib, dan nyaman. Proyek ini tidak hanya bertujuan meningkatkan kapasitas pasar, tetapi juga mendukung pengembangan ekonomi lokal yang berkelanjutan. Salah satu tahap awal yang krusial dalam pelaksanaan proyek ini adalah identifikasi pedagang terdampak. Langkah ini bertujuan untuk memastikan akomodasi yang sesuai bagi para pedagang berdasarkan kebutuhan dan jenis usaha mereka, sekaligus meminimalkan potensi konflik, meningkatkan transparansi, serta mendorong partisipasi masyarakat. Berdasarkan hasil pendampingan teknis, ditemukan bahwa terdapat setidaknya 55 pedagang yang berjualan di sepanjang Jalan Yos Sudarso, sehingga mengurangi fungsi jalan tersebut sebagai jalur transportasi utama. Para pedagang ini direkomendasikan untuk direlokasi ke lokasi baru yang lebih layak dan mendukung kegiatan jual beli, yaitu di Pasar Muntok.Relokasi ini diharapkan dapat menciptakan pasar yang lebih tertib, aman, dan nyaman. Selain itu, langkah ini juga bertujuan meningkatkan kualitas infrastruktur pasar, memberikan dampak positif terhadap aktivitas ekonomi masyarakat lokal, serta memperlancar arus lalu lintas di kawasan sekitar pasar.
Pembelajaran Interaktif Konsep Cahaya melalui Media Aplikasi dan Eksperimen di SD Alam Lampung Dwiyana, Putri Ayu; Marina, Bernaditha Catur; Maini, Miskar; Khanza, Ayu Kamila; Ribowo, Anggarani Budi; Kirtinanda. P, Kirtinanda. P; Yuliyanto, Andry; Sitepu, Arif Rahman Hakim; Zhafira, Elian; Saputra, Cahyo Agung; Syuhada, Syahidus; Prayogi, Galih Rio; Kiranaratri, Ayudia Hardiyani; Susanti, Junita Eka; Tambunan, Hermon Frederik
Jurnal Pengabdian Masyarakat Bhinneka Vol. 3 No. 4 (2025): Bulan Juli
Publisher : Bhinneka Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58266/jpmb.v3i4.139

Abstract

Mahasiswa dan dosen Program Studi Teknik Sipil Institut Teknologi Sumatera (ITERA) melaksanakan kegiatan pengabdian kepada masyarakat bertema "Cahaya Interaktif" di SD Sekolah Alam Lampung. Kegiatan ini bertujuan untuk meningkatkan pemahaman siswa sekolah dasar terhadap konsep dasar cahaya dan sifat-sifatnya melalui pendekatan pembelajaran yang menyenangkan, interaktif, dan partisipatif. Metode pelaksanaan meliputi penyampaian materi melalui presentasi interaktif, praktik langsung menggunakan alat peraga Kotak Cahaya, serta simulasi digital berbasis web untuk memperkuat pemahaman visual siswa. Guna mendorong keterlibatan aktif, siswa diberikan sistem poin dan hadiah sebagai bentuk apresiasi terhadap partisipasi mereka. Sebagai bentuk keberlanjutan program, alat peraga Kotak Cahaya dihibahkan kepada pihak sekolah untuk mendukung proses pembelajaran sains di masa mendatang. Hasil kegiatan menunjukkan peningkatan signifikan dalam pemahaman siswa terhadap konsep cahaya, yang tercermin dari partisipasi aktif lebih dari 90% siswa dalam eksperimen dan diskusi. Pemanfaatan media peraga dan pendekatan interaktif berbasis teknologi terbukti mampu menciptakan suasana belajar yang menyenangkan, kolaboratif, dan bermakna bagi siswa sekolah dasar.
Peningkatan Literasi Lalu Lintas Melalui Magang Eksternal Sebagai Asisten Dosen Cilik untuk Siswa SD di FTIK Institut Teknologi Sumatera Marina, Bernaditha Catur; Kurniawan, Rahmat; Maini, Miskar; Prayogi, Galih Rio; Michael, Michael; Nadi, Abi Berkah; Ribowo, Anggarani Budi; Dwiyana, Putri Ayu; Kirtinanda P., Kirtinanda P.; Sitepu, Arif Rahman Hakim
Jurnal Pengabdian Masyarakat Bhinneka Vol. 3 No. 4 (2025): Bulan Juli
Publisher : Bhinneka Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58266/jpmb.v3i4.157

Abstract

Prodi Teknik Sipil ITERA merangkul Sekolah Alam Lampung dalam melaksanakan program pembelajaran. Program ini bertujuan untuk mengenalkan konsep dasar rekayasa lalu lintas kepada siswa kelas 5 SD Alam Lampung melalui program magang eksternal bertema ‘asisten dosen cilik’. Kegiatan dilaksanakan di Fakultas Teknologi Infrastruktur dan Kewilayahan Institut Teknologi Sumatera (ITERA), berlangsung selama 3 (tiga) hari dengan metode experiental learning: mulai dari pengenalan lingkungan kampus, pengamatan lalu lintas secara langsung, hingga pengolahan data penghitungan lalu lintas dalam bentuk diagram batang. Hasil kegiatan menunjukkan bahwa siswa magang mampu memahami konsep dasar elemen dalam rekayasa lalu lintas berikut fungsinya, dan dapat berperan aktif dalam pengamatan kendaraan dan simulasi penghitungan lalu lintas. Program ini juga menunjukkan bahwa pendekatan pembelajaran konstekstual di lingkungan pendidikan tinggi dapat meningkatkan literasi lalu lintas sejak dini.  
STUDI PERENCANAAN DAN ESTIMASI BIAYA PADA TEBAL PERKERASAN KAKU DAN JALUR PEDESTRIAN Dwiyana, Putri Ayu; Prayogi, Galih Rio; Yuliyanto, Andry
Nusantara Hasana Journal Vol. 4 No. 12 (2025): Nusantara Hasana Journal, May 2025
Publisher : Yayasan Nusantara Hasana Berdikari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59003/nhj.v4i12.1453

Abstract

The western gate of ITERA. serves as one of the main access points for entering and exiting the campus, however, the pavement in this area has experienced structural deterioration, and pedestrian activities frequently occur on the roadway, posing safety concerns. This study aims to design the rigid pavement la.yer thickness and prepare a cost estima.tion (Bill of Quantities), as well as to plan a pedestrian walkwa.y a.t the western gate of ITERA. The design of the rigid pavement and pedestrian path was carried out using the 2024 Road Pavement Design Manual and the 2023 Technical Guidelines for Pedestrian Facility Planning. The proposed rigid pavement type is Jointed Plin Concrete Pavement (JPCP), consisting of a 150 mm thick concrete slab, a 100 mm thick lean concrete subbase, and a 150 mm thick Class A aggregate base layer. The longitudinal joints are designed using 13 mm dia.meter tie bars with a length of 600 mm and spaced at 750 mm intervals, while the tra.nsverse joints utilize 24 mm diameter dowel bars with a length of 450 mm, spaced at 300 mm intervals, and placed at every 4-meter distance. The total estimated cost for the pa.vement construction is RP 2,118,111,173.31. The pedestrian walkway is planned with a sidewalk width of 1.85 meters and a height of 20 centimeters.
Cost and Time Performance Evaluation Based on Earned Value Analysis Method Laila Putri Rahmadani; Susanti, Junita Eka; Putri Ayu Dwiyana
Journal of Civil Engineering and Planning (JCEP) Vol. 6 No. 1 (2025)
Publisher : Program Studi Sarjana Teknik Sipil Universitas Internasional Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37253/jcep.v6i1.10691

Abstract

The execution of construction projects frequently encounters a range of challenges in the field, leading to deviations between the initial project plan and actual implementation, particularly in terms of time and cost performance. Such deviations may significantly affect the overall efficiency and effectiveness in achieving the intended project objectives. Consequently, there is a critical need for an evaluation method capable of providing a comprehensive and real-time assessment of project performance. This study aims to evaluate the performance of an infrastructure development initiative, namely the ABC toll road construction project, by employing the Earned Value Analysis (EVA) method. EVA integrates three key components—cost, schedule, and work performance—offering a quantitative framework to assess both cost efficiency and schedule adherence. The performance weights used in this study are derived from both planned values and actual on-site progress to reflect the true execution status. The data utilized in the analysis include the Budget Plan (Rencana Anggaran Biaya/RAB), planned S-curve, and weekly progress reports obtained during project implementation. The findings at the 67th week of project execution indicate an Actual Cost of Work Performed (ACWP) of Rp1,231,597,458,600.00, a Budgeted Cost of Work Performed (BCWP) of Rp1,109,547,260,000.00, and a Budgeted Cost of Work Scheduled (BCWS) of Rp1,570,000,000,000.00. The Cost Performance Index (CPI) value of 0.901 indicates that the project experienced a cost overrun of 9.9% compared to the planned budget (CPI < 1 signifies cost inefficiency). 
Focus Group Discussion (FGD) Penyusunan Kurikulum 2025 - 2030 Program Studi Teknik Sipil Institut Teknologi Sumatera Kurniawan, Rahmat; Michael, Michael; Syuhada, Syahidus; Maini, Miskar; Fitriana, Indri Rahmandhani; Hayati, Julita; Dwiyana, Putri Ayu; Mardika, M Gilang Indra; Aprilia, Ayu Sinta; Khanza, Ayu Kamila; Saputra, Cahyo Agung; Prayogi, Galih Rio; Ribowo, Anggarani Budi; Yudi, Ahmad; Nadi, Muhammad Abi Berkah
Jurnal Pengabdian Masyarakat Bhinneka Vol. 4 No. 1 (2025): Bulan September
Publisher : Bhinneka Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58266/jpmb.v4i1.463

Abstract

Penyusunan kurikulum berbasis Outcome Based Education (OBE) merupakan upaya strategis untuk memastikan ketercapaian kompetensi lulusan yang relevan dengan kebutuhan dunia kerja, perkembangan teknologi, dan tantangan pembangunan berkelanjutan. Sejalan dengan hal tersebut, Program Studi Teknik Sipil Institut Teknologi Sumatera (ITERA) menyelenggarakan Focus Group Discussion (FGD) sebagai wadah kolaboratif dalam merumuskan Kurikulum 2025–2030. Proses ini melibatkan pemangku kepentingan internal dan eksternal, termasuk dosen, mahasiswa, alumni, praktisi, asosiasi profesi, serta pengguna lulusan. Kurikulum yang dikembangkan dirancang sesuai dengan standar Outcome Based Education (OBE) dan kriteria akreditasi LAM Teknik, dengan penekanan pada penguatan kompetensi inti bidang teknik sipil, integrasi teknologi digital, prinsip keberlanjutan lingkungan, serta pengembangan soft skills mahasiswa. Hasil FGD ini menghasilkan rekomendasi kurikulum yang adaptif, aplikatif, dan berorientasi pada capaian pembelajaran lulusan (CPL) yang selaras dengan standar nasional maupun internasional, sekaligus mendukung visi ITERA untuk menjadi perguruan tinggi yang unggul dalam sains, teknologi, dan inovasi.
ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK GEDUNG BERTINGKAT MENGGUNAKAN METODE SEVERITY INDEX DAN CONSTRUCTION SAFETY ANALYSIS Azzakiyah, Narindha Nasywa; Zhafira, Elian; Rajiman; Dwiyana, Putri Ayu
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 4, November 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i4.34577

Abstract

The dominance of the construction sector presents its own challenges, one of which is the risk of occupational accidents. This fact is evidenced by cases of work-related accidents in structural work at the Crystal Boulevard Shop House development project in Summarecon Bekasi. This situation is driven by the occurrence of unsafe actions and unsafe conditions during the implementation of work activities. This study aims to identify potential occupational accident risks, analyze the level of these risks, and assess risk control measures in structural work, including rebar installation, formwork, and concreting activities. The methods employed in this study are the Severity Index and Construction Safety Analysis. The results are 27 risk variables related to occupational accidents were identified in structural work, with 27% categorized as low risk and 73% as medium risk. The risk control analysis conducted refers to the hierarchy of controls based on ISO 45001:2018 standards. This approach provides systematic results by organizing controls according to priority order, include substitution, engineering controls, administrative controls, and the use of personal protective equipment (PPE). Abstrak Dominasi sektor konstruksi memunculkan tantangan tersendiri, salah satunya adalah risiko kecelakaan kerja. Fakta ini diperkuat oleh adanya kasus kecelakaan kerja pada pekerjaan struktur di proyek pembangunan Ruko Crystal Boulevard Summarecon Bekasi. Hal tersebut dipicu oleh adanya tindakan tidak aman dan kondisi tidak aman selama pelaksanaan pekerjaan. Penelitian ini bertujuan untuk mengidentifikasi potensi risiko kecelakaan kerja, menganalisis tingkat risiko dan menganalisis pengendalian risiko pada pekerjaan struktur yaitu pembesian, perancah, bekisting dan pengecoran. Metode yang digunakan yaitu Severity Index dan Construction Safety Analysis (CSA). Hasil penelitian menunjukkan bahwa terdapat 27 variabel risiko kecelakaan yang teridentifikasi pada pekerjaan struktur, diantaranya 27% risiko rendah (low) dan 73% risiko sedang (medium). Analisis pengendalian risiko yang dilakukan mengacu pada hierarki pengendalian berdasarkan standar ISO 45001:2018. Pendekatan ini memberikan hasil yang sistematis dengan menyusun pengendalian berdasarkan urutan prioritas, yaitu subtitusi, engineering control, administratif dan Alat Pelindung Diri (APD).
Cost and Time Optimization Analysis using the Time Cost Trade Off Method Dwiyana, Putri Ayu; Siti Agmaliza; Rajiman
Journal of Civil Engineering and Planning (JCEP) Vol. 6 No. 2 (2025)
Publisher : Program Studi Sarjana Teknik Sipil Universitas Internasional Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37253/jcep.v6i2.11446

Abstract

The implementation of construction projects often faces delays that are difficult to avoid, as experienced in the construction of the City X Hospital Building, where there was a discrepancy between the initial plan and actual field implementation, resulting in a two-week delay in weekly progress. This study aims to analyze time and cost efficiency and compare the effectiveness of alternatives between extending working hours and adding labor using the Time Cost Trade Off method. This research is comparative, comparing the total cost and duration of the project for both acceleration alternatives. The total project cost under normal conditions was recorded at IDR 7,289,386,643.45 with a duration of 86 days until the completion of the third floor. The analysis shows that extending working hours by 1 to 4 hours resulted in costs of IDR 14,584,817,481; IDR 21,871,659,072; IDR 28,672,701,971; and IDR 34,564,808,294, with cost efficiency of –100.08%, –200.05%, –293.35%, and –374.18%, respectively. The project duration was reduced to 64, 50, 41, and 36 days, with time efficiency of 26%, 42%, 53%, and 58%. Meanwhile, the alternative of adding labor resulted in a total cost of IDR 13,660,989,499 with a cost efficiency of –87.41% and a project duration of 64 days (26% time efficiency). Based on these results, both extending working hours by one hour and adding labor showed the most efficient outcomes, but overall, adding labor was considered more optimal as it achieved the same acceleration with the lowest total cost.