Claim Missing Document
Check
Articles

Found 9 Documents
Search

Structural Failure Analysis of Building E ITERA Due to The Pounding Effect with Non-Linear Time History Nugraha Bintang Wirawan; Siska Apriwelni
JURNAL SAINTIS Vol. 20 No. 01 (2020)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1044.848 KB) | DOI: 10.25299/saintis.2020.vol20(01).4832

Abstract

[EN] Lampung, a province where Institut Teknologi Sumatera (ITERA) is located, is an area that has a high level of seismicity. This research takes a case study of the Building E ITERA which has a dilatation building concept. Due to dilatation, inter-buildings have the risk of collisions because of earthquake loads. The purpose of this study is to determine the value of joint displacement in adjacent buildings when given a dynamic load of Time History and determine whether the adjacent buildings experience a pounding effect. A Time History earthquake load data that has been matched with the Lampung region response spectrum by software is applied to the model of Building E. Building E is modeled according to the as built drawing data and the results of field checking. Structure is analyzed using software. The results of the study showed that the structure of the Building E which was loaded by Loma Prieta earthquake that has been matched would experience inter-building collisions. Further research using earthquake record data taken in areas within certain radius from ITERA is need to be conducted to obtain more accurate results.
Kuat Tekan Beton Mutu Tinggi dengan Memanfaatkan Fly Ash dan Bubuk Kaca Sebagai Bahan Pengisi: High Quality Concrete Compressive Strength by Using Fly Ash and Glass Powder as Filler Siska Apriwelni; Nugraha Bintang Wirawan
JURNAL SAINTIS Vol. 20 No. 01 (2020)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (600.018 KB) | DOI: 10.25299/saintis.2020.vol20(01).4846

Abstract

(ID) Penelitian ini membahas pengaruh kuat tekan beton mutu tinggi dengan memanfaatkan limbah fly ash dan limbah kaca. Tujuan dari penelitian ini untuk mengetahui kuat tekan beton pada masing-masing variasi, mengetahui persentase campuran beton untuk menghasilkan kuat tekan maksimum, dan mengetahui apakah fly ash dan serbuk kaca efektif digunakan secara bersamaan sebagai bahan campuran beton. Komposisi fly ash terdiri dari 5 variasi yaitu persentase 0%, 5%, 10%, 15%, dan 20%. Sedangkan untuk komposisi serbuk kaca terdiri dari 2 variasi yaitu persentase 5% dan 10%. Jumlah benda uji 30 buah silinder berukuran diameter 15 cm dan tinggi 30 cm dengan 3 benda uji untuk setiap variasi. Perencanaan campuran beton menggunakan SNI 03-2834-2000 yang dimodifikasi. Pengujian kuat tekan diuji pada umur beton 28 hari. Beton dengan fly ash 0% dan serbuk kaca 10% memiliki kuat tekan paling tinggi dibandingkan dengan beton dengan tambahan fly ash, yaitu 46,77%. Selain itu, dapat disimpulkan bahwa semakin bertambahnya jumlah persentase serbuk kaca yang digunakan menunjukkan bahwa kuat tekan beton semakin bertambah juga. Penambahan fly ash pada campuran beton mempengaruhi kuat tekan beton yang dihasilkan. Pada variasi fly ash 0% memiliki kuat tekan tertinggi baik pada saat campuran serbuk kaca 5%dan 10%. Variasi fly ash 15% adalah kondisi optimum campuran beton dengan kuat tekan beton yaitu 43,31 Mpa. Kedua limbah ini dapat dikombinasikan dan dimanfaatkan dengan baik dan digunakan dalam pembuatan beton mutu tinggi. (EN) This study discusses the effect of high quality concrete by utilizing fly ash and glass waste. The purpose of this study is to determine the compressive strength of concrete in each variation, to determine the contribution of concrete to produce compressive strength, and to find out that fly ash and glass powder are effectively used in full as a concrete admixture. Fly ash composition consists of 5 variations, namely the percentage of 0%, 5%, 10%, 15%, and 20%. While for the composition of glass powder consists of 2 variations, namely the percentage of 5% and 10%. The number of specimens is 30 cylinders with a diameter of 15 cm and a height of 30 cm with 3 specimens for each variation. Concrete mixture planning using SNI 03-2834-2000 was developed. Compressive strength testing on concrete age 28 days. Concrete with 0% fly ash and 10% glass powder have the highest compressive strength compared to concrete with additional fly ash, which is 46.77%. In addition, it can increase the amount of glass powder addition that is used to show the concrete compressive strength is increasing as well. The addition of fly ash in the concrete mixture has an effect on the compressive strength of the concrete produced. In the variation of 0% fly ash has the highest compressive strength when the glass powder mixture of 5% and 10%. The 15% fly ash variation is the optimal concrete mixture with compressive strength of 43.31 MPa. These two wastes can be combined and utilized properly and are used in making high quality concrete.
Strengthening of Nurul Ilmi Mosque with Concrete Jacketing Fauzan Fauzan; Febrin Anas Ismail; Siska Apriwelni; Imelia Faradiza; Zev Al Jauhari
INSIST Vol 1, No 1 (2016)
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (184.268 KB) | DOI: 10.23960/ins.v1i1.12

Abstract

Abstract—Nurul Ilmi moesque is one of building for worship located in University of Andalas. In 2008 the new building of mosques was designed using previous indonesian seismic code, SNI 1726: 2002. The right side of the new mosque was constructied in 2009. Due to the limitation of the budget, the construction of the left side of the mosque was continued on 2014. However, a new indonesian seismic code SNI 03-1726-2012 was established and the designed mosque should be revised based on the new indonesian seismic code.  Since the right side of the mosque was designed by using the old seismic code (SNI 1726: 2002), so it is necessary to evaluate the strength of the structure by using the seismic code (SNI 03-1726-2012). Based on the analysis results, it was found that the right side of the building structure is not strong enough to resist the combination loads acting on the structure, especially the earthquake load. Therefore, it is necessary to strengthening (retrofitting) the right side of the building structure before connecting with the left side of the building. In this study, the concrete jacketing method  was used to the retrofit the column structure. The results show that the jacketing method is effective to increase the capacity of the column and reduce internal forces and displacements that occur in the structure of the mosque, so the structure can resist the working loadsKeywords—column, concrete jacketing, earthquake, displacement, strengthening.
Bantuan Teknis Perencanaan Pembangunan Tahap II Masjid Nurul Ikhwan di Desa Way Huwi Kabupaten Lampung Selatan Yudi, Ahmad; Fathurrahman, Arif; Apriwelni, Siska; Kirtinanda, Kirtinanda; Rahma, Siti; Maini, Miskar
Jurnal Pengabdian Masyarakat Bangsa Vol. 2 No. 8 (2024): Oktober
Publisher : Amirul Bangun Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpmba.v2i8.1479

Abstract

Pembangunan Masjid Nurul Ikhwan di Desa Way Huwi, Kabupaten Lampung Selatan, telah memasuki tahap kedua yang berfokus pada konstruksi elemen struktur, termasuk kolom, balok, dan plat. Untuk memastikan kualitas serta efisiensi pelaksanaan yang mendukung aktivitas masyarakat setempat, diperlukan pendampingan teknis dalam perencanaan pembangunan tahap ini. Pendampingan tersebut dilakukan dengan menggunakan metode Building Information Modeling (BIM) yang melibatkan perencanaan terintegrasi, evaluasi desain struktur, penyesuaian spesifikasi material, serta estimasi biaya secara detail. Hasil dari kegiatan Pengabdian kepada Masyarakat (PKM) ini adalah perencanaan pembangunan tahap kedua Masjid Nurul Ikhwan yang dirancang menjadi bangunan dua lantai dengan konsep konstruksi beton bertulang. Total rencana anggaran biaya yang diusulkan untuk elemen struktur tahap ini mencapai Rp. 550.077.528. Melalui bantuan teknis ini, diharapkan pembangunan Masjid Nurul Ikhwan dapat terlaksana sesuai dengan standar konstruksi yang berlaku, sehingga memberikan keamanan, kenyamanan bagi masyarakat, serta tercapainya target waktu dan biaya yang efisien dalam pelaksanaannya.
Structural evaluation and analysis of existing house renovation into shophouse based on Building Information Modeling Ahmad Yudi; Nugraha Bintang Wirawan; Siti Rahma; Kartinanda P.; Amantawidya Durratul Hikmah; Annida Evilia Miranda; Siska Apriwelni
Teknisia Vol 29 No 1 (2024): Teknisia
Publisher : Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Islam Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20885/teknisia.vol29.iss1.art1

Abstract

Indonesia's population and economic growth must be supported by adequate facilities and infrastructure, including residences and business premises. Renovating residential houses into shophouses offers an effective way to optimize land use and reduce construction costs. A thorough evaluation of existing structural elements is critical to determining which components can be retained, alongside accurate cost and scheduling assessments to ensure smooth renovation. This research utilizes Building Information Modeling (BIM) to integrate structural, architectural, and MEP work, as well as to streamline scheduling and cost estimation. ETABS is employed for structural design, while Autodesk Revit and Navisworks are used for cost and schedule planning. The assessment follows ASCE 41-17 guidelines to evaluate existing structures, and SNI 1726:2019 and SNI 2847:2019 standards for retrofitting and designing new structures. The evaluation reveals deficiencies in global strength and component ductility, necessitating structural retrofits using concrete jacketing. This study not only addresses the renovation of a residential house into a shophouse but also contributes to broader research in construction. The estimated cost for the structural renovation is Rp. 159,692,607.93, and the duration is projected at 58 days, with 11 days for demolition and 47 days for upper structure construction.
Kolaborasi Pemangku Kepentingan dalam Identifikasi Penentuan Lokasi Pembangunan Gedung Galeri Dekranasda Kota Pangkalpinang Ilpandari, Ilpandari; Sabri, Fadillah; Maini, Miskar; Yudi, Ahmad; Ribowo, Anggarani Budi; Yuliyanto, Andry; Sitepu, Arif Rahman Hakim; Kiranaratri, Ayudia Hardiyani; Aprilia, Ayu Sinta; Khanza, Ayu Kamila; Marina, Bernaditha Catur; Saputra, Cahyo Agung; Zhafira, Elian; Prayogi, Galih Rio; Tambunan, Hermon Frederik; Fitriana, Indri Rahmandhani; Hayati, Julita; Susanti, Junita Eka; Kirtinanda. P, Kirtinanda. P; Mardika, M Gilang Indra; Michael, Michael; Nadi, Muhammad Abi Berkah; Dwiyana, Putri Ayu; Kurniawan, Rahmat; Ekaputra, Reza Asriandi; Apriwelni, Siska; Syuhada, Syahidus; Sihombing, Tera Melya Patrice
Jurnal Pengabdian Masyarakat Bangsa Vol. 2 No. 12 (2025): Februari
Publisher : Amirul Bangun Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpmba.v2i12.2031

Abstract

Pembangunan Gedung Galeri Dekranasda di Kota Pangkalpinang merupakan langkah strategis untuk mendukung pengembangan sektor ekonomi kreatif, khususnya kerajinan tangan khas Bangka Belitung. Gedung ini dirancang sebagai pusat promosi, pameran, dan pemasaran produk kerajinan lokal, sekaligus menjadi simbol identitas budaya daerah. Salah satu aspek penting dalam perencanaan pembangunan adalah penentuan lokasi yang strategis, dengan mempertimbangkan aksesibilitas, konektivitas, dan potensi pengembangan kawasan. Kegiatan pengabdian kepada masyarakat ini bertujuan untuk mendampingi proses kolaborasi pemangku kepentingan dalam menentukan lokasi pembangunan Gedung Galeri Dekranasda. Metodologi yang digunakan meliputi observasi lapangan, analisis spasial, dan diskusi kelompok terfokus dengan pemerintah daerah, pengrajin, komunitas lokal, serta akademisi. Pendekatan kolaboratif ini bertujuan untuk memastikan bahwa keputusan yang diambil bersifat inklusif, berbasis data, dan berkelanjutan. Hasil kegiatan ini memberikan alternatif lokasi terbaik untuk pembangunan Gedung Galeri Dekranasda berdasarkan kajian teknis dan social yaitu direncanakan pada tiga alternatif lokasi, yaitu Lokasi 1 (Taman Mandara), Lokasi 2 (Tumpuk Pinangpura), dan Lokasi 3 (Tugu Remangok, Jl. Selindung). Ketiga lokasi tersebut telah dikaji berdasarkan berbagai aspek teknis, termasuk aksesibilitas melalui jalan lokal, ketersediaan jaringan air bersih, listrik, telekomunikasi tetap, penerangan jalan, dan kedekatan dengan tempat pembuangan sampah sementara (TPS). Namun, infrastruktur pemadam kebakaran belum tersedia di ketiga lokasi tersebut.
Pendampingan Teknis Identifikasi Pedagang untuk Proyek Relokasi dan Perluasan Pasar Muntok di Kabupaten Bangka Barat Ilpandari, Ilpandari; Sabri, Fadillah; Maini, Miskar; Yudi, Ahmad; Ribowo, Anggarani Budi; Yuliyanto, Andry; Sitepu, Arif Rahman Hakim; Kiranaratri, Ayudia Hardiyani; Aprilia, Ayu Sinta; Khanza, Ayu Kamila; Marina, Bernaditha Catur; Saputra, Cahyo Agung; Zhafira, Elian; Prayogi, Galih Rio; Tambunan, Hermon Frederik; Fitriana, Indri Rahmandhani; Hayati, Julita; Susanti, Junita Eka; Kirtinanda. P, Kirtinanda. P; Mardika, M Gilang Indra; Michael, Michael; Nadi, Muhammad Abi Berkah; Dwiyana, Putri Ayu; Kurniawan, Rahmat; Ekaputra, Reza Asriandi; Apriwelni, Siska; Syuhada, Syahidus; Sihombing, Tera Melya Patrice
Jurnal Pengabdian Masyarakat Bangsa Vol. 2 No. 12 (2025): Februari
Publisher : Amirul Bangun Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpmba.v2i12.2032

Abstract

Pasar Muntok memiliki sejarah panjang sebagai pusat aktivitas ekonomi di Bangka Barat. Namun, peningkatan jumlah pedagang dan kunjungan masyarakat memunculkan berbagai permasalahan, seperti kemacetan, ketidakteraturan tata letak, dan keterbatasan fasilitas pendukung. Untuk mengatasi hal tersebut, Pemerintah Kabupaten Bangka Barat memulai proyek strategis relokasi dan perluasan Pasar Muntok guna menciptakan lingkungan perdagangan yang lebih modern, tertib, dan nyaman. Proyek ini tidak hanya bertujuan meningkatkan kapasitas pasar, tetapi juga mendukung pengembangan ekonomi lokal yang berkelanjutan. Salah satu tahap awal yang krusial dalam pelaksanaan proyek ini adalah identifikasi pedagang terdampak. Langkah ini bertujuan untuk memastikan akomodasi yang sesuai bagi para pedagang berdasarkan kebutuhan dan jenis usaha mereka, sekaligus meminimalkan potensi konflik, meningkatkan transparansi, serta mendorong partisipasi masyarakat. Berdasarkan hasil pendampingan teknis, ditemukan bahwa terdapat setidaknya 55 pedagang yang berjualan di sepanjang Jalan Yos Sudarso, sehingga mengurangi fungsi jalan tersebut sebagai jalur transportasi utama. Para pedagang ini direkomendasikan untuk direlokasi ke lokasi baru yang lebih layak dan mendukung kegiatan jual beli, yaitu di Pasar Muntok.Relokasi ini diharapkan dapat menciptakan pasar yang lebih tertib, aman, dan nyaman. Selain itu, langkah ini juga bertujuan meningkatkan kualitas infrastruktur pasar, memberikan dampak positif terhadap aktivitas ekonomi masyarakat lokal, serta memperlancar arus lalu lintas di kawasan sekitar pasar.
STRUCTURAL PERFORMANCE DUE TO ENGINE VIBRATION USING THE LEVELLING TIME HISTORY METHOD Ahmad Yudi; Andrew Andonia First Purba; Ade Prayoga Nasution; M. Abi Berkah Nadi; Siska Apriwelni; Alfinna Mahya Ummati; Kirtinanda, Kirtinanda
Nusantara Hasana Journal Vol. 4 No. 10 (2025): Nusantara Hasana Journal, March 2025
Publisher : Yayasan Nusantara Hasana Berdikari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59003/nhj.v4i10.1398

Abstract

In this case study, earthquake is one of the loads that is considered in designing and analyzing buildings. So that the earthquake becomes the author's calculation in analyzing the building against the strength and safety of the structure in receiving earthquake loads that occur with the anticipation of another earthquake history such as the El Centro earthquake. The author aims to analyze the performance of the structure that occurs against earthquake loads, the analysis also pays attention to the level of value that can be achieved by the building nonlinearly, namely the increase in the value of the initial acceleration of the earthquake (Level Aog) that occurred. The analysis is carried out on steel buildings that have bracing, concrete reinforcement, and there are machine activities. Structural performance analysis uses numerical methods and iterations which are assisted by a structural analysis program. The analysis is carried out by defining the hinge on the structural element. The analysis process is carried out in stages with the condition of the machine which is also considered in the leveling time history method. Time history which is also a history of vibration and machine vibration activity adds to the input parameters of the analysis carried out on the building. The response of the building due to engine vibration will be compared with the condition of the building when the engine is off which does not cause vibration. Structural performance analysis is carried out by increasing Aog until the structural elements of the building are no longer able to withstand shear forces and loads that occur when severe damage or conditions are above Collapse Prevention (CP). The results of the structural analysis will produce output in the form of Aog levels with plastic checks with color visuals, deviation checks and rotation checks based on FEMA 356 so as to produce structural strength capabilities. Based on the vibrations that occur with machine activity, the frequency can still be held by the building. The machine vibrations that occur, dampen the vibrations caused by the earthquake so that the leveling indicator becomes larger.  
Pendampingan Teknis Perencanaan Perkuatan Struktur Power House PLTU Tarahan dengan Bracing dan Analisis Levelling Time History Yudi, Ahmad; Alexander, Rionaldo; Kirtinanda. P, Kirtinanda. P; Apriwelni, Siska; Ummati, Alfinna Mahya; Nadi, Muhammad Abi Berkah; Maini, Miskar
Jurnal Pengabdian Masyarakat Bangsa Vol. 3 No. 1 (2025): Maret
Publisher : Amirul Bangun Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpmba.v3i1.2171

Abstract

Kegiatan pengabdian ini bertujuan untuk menganalisis efektivitas perkuatan struktur bangunan terhadap beban gempa melalui pemasangan bracing. Beban gempa yang digunakan dalam analisis time history adalah gempa Kobe. Kegiatan ini mengevaluasi kinerja struktur dengan mempertimbangkan percepatan awal gempa (Aog) secara nonlinear menggunakan metode Levelling Time History. Analisis dilakukan dengan meningkatkan Aog hingga elemen struktur tidak mampu lagi menahan gaya geser dan beban, serta mengalami kerusakan parah atau mencapai kondisi Collapse Prevention (CP). Hasil analisis menunjukkan bahwa pada kondisi eksisting, struktur mengalami kegagalan sebelum pemasangan bracing. Hal ini terlihat dari perbandingan nilai base shear, periode getar, partisipasi massa, simpangan antar lantai, serta rasio kapasitas momen kolom-balok sebelum dan sesudah pemasangan bracing. Berdasarkan kriteria kinerja struktur menurut FEMA 356, bangunan ini masih tergolong aman terhadap gempa Kobe dengan indikator Immediate Occupancy (IO) berdasarkan pengecekan sendi plastis untuk arah X dan Y. Setelah dilakukan perkuatan, analisis rotasi dan simpangan maksimum menunjukkan bahwa struktur mampu menahan gempa hingga 6×Aog untuk arah X dan 8×Aog untuk arah Y sebelum mengalami kegagalan pada balok dan kolom. Dengan demikian, pemasangan bracing terbukti meningkatkan ketahanan struktur secara signifikan, berfungsi sebagai pengaku, dan memperkuat kekakuan serta stabilitas bangunan.