Application of Ultrasonic and Coating Material Thickness Testing on Post-Fire Steel Construction Citra, Zel; Antonius; Biantoro, Agung Wahyudi
Rekayasa Sipil Vol. 19 No. 2 (2025): Rekayasa Sipil Vol. 19 No. 2
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2025.019.02.12

Abstract

Steel has advantages over other construction materials, including flexibility and processing time. Steel has better elasticity and relatively faster processing time compared to reinforced concrete. However, the weakness is that steel is also very susceptible to temperature changes. If a steel material experiences an increase in temperature, for example, if it is directly exposed to fire, its yield and tensile strength will decrease drastically. This can cause the function of the steel material as a structural element to change. In early 2023, a fire occurred in a steel construction tower used for animal feed processing, PT. XYZ in the Lampung area. As a result of the fire, there is a concern about the risk of structural failure, which could cause worker fatalities in the building. So, it is necessary to test the thickness of steel tower structural elements such as columns, beams, and bracing using the Non-Destructive Test method with an Ultrasonic Material Gauge and Material Coating Thickness. The test samples were taken in as many as 20 samples with the test structure including column elements, beam elements, and bracing at each level or elevation of the fire-affected floor. Test sample include WF200X100X5,5x8, WF250X125X6X9, WF300X150X6,5X9, WF400X200X8X13, HB400X400X13X21 and Pipe Ø6”. The results of the post-fire steel structure measurement, the thickness of columns, beams, and bracing from 20 samples, showed that 95% still met the thickness tolerance of 0.7 mm- 1.2 mm based on the SNI 07-0329-2005. The thickness of the post-fire coating, 95% steel structural coating, did not meet the standards below 240mm. Only 5% met the minimum coating thickness standards, such as pipe bracing Ø6" with a coating thickness of 397 microns. And for repair, repainting is recommended. Repainting must be done to prevent corrosion and restore the structure's safety.
Kondisi Struktur Tower Baja Terdampak Kebakaran Melalui Inspeksi Secara Visual Zel Citra; Antonius Antonius; Biantoro, Agung Wahyudi
Prosiding Seminar Nasional Ilmu Teknik Vol. 1 No. 2 (2024): Desember : Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v1i2.40

Abstract

Building fires can significantly degrade the strength and integrity of steel structures, so post-incident evaluation is crucial to ensure building safety and feasibility. This study aims to evaluate the condition of the steel tower structure after the fire through a visual inspection method. A total of 35 structural elements were examined, including columns, beams, and bracing, to identify damage caused by heat exposure. The inspection results showed that 6 elements (17%) were in the category of Acceptable, 8 elements (23%) Needs Attention, 5 elements (14%) Not Acceptable, and 1 element (3%) Not Applicable because they had been removed. Steel columns generally remain upright without deformation, but suffer damage to the protective layer (coating). In contrast, most blocks lose their protective layers, are directly exposed to fire, show early signs of corrosion, and some suffer severe damage such as flange tears and cuts. These findings confirm the importance of systematic documentation and classification of element conditions as the basis for technical decision-making for structural improvement. Visual inspection proved effective as an initial step in the evaluation process, providing a relevant initial picture of the extent of damage and the need for intervention. This study recommends follow-up in the form of advanced structural analysis and material testing to ensure the feasibility of reusing the affected steel elements.
INTEGRASI METODE PERT DAN PARAMETRIC ESTIMATING BERBASIS APLIKASI JAVA PADA STUDI KASUS PEKERJAAN FACADE PRECAST DAPAT MENINGKATKAN KINERJA BIAYA PROYEK Malinda, Yosie; Wibowo, Paksi Dwiyanto; Citra, Zel; Mana Marang, Maria Natalia; Christian Bessie, Steaven
JURNAL TEKNIK SIPIL Vol 11, No 2 (2022): Volume 11 Nomor 2 November 2022
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v11i2.27519

Abstract

Perkembangan manajemen proyek terus meningkat sejalan dengan perkembangan ilmu pengetahuan dan teknologi.Efektivitas pengelolaan proyek besar dapat diusahakan dengan menerapkan metode kerja yang tepat. Tahun 2021 menjadi tren bangunan precast. Struktur precast diklaim dapat menghemat 35% biaya pelaksanaan dan 27,33% lebih cepat dibandingkan dengan struktur konvensional. Hasil implementasi metode Pert pada studi kasus proyek bangunan facade precast rusunawa dapat meningkatkan efisiensi total durasi proyek sebesar 8,2 % yaitu direduksi sebesar 30 hari menjadi 335 hari. Hasil impelementasi metode parametric estimatingpada studi kasus proyek bangunan facade precast rusunawa dapat meningkatkan efisiensi biaya proyek sebesar 10,19% yaitu menjadi Rp. 34.127.000.000,-.
Optimasi Proporsi Sumber Daya Proyek dengan Menggunakan Aplikasi Java pada Bangunan Konstruksi Pabrik Apdeni, Risma; Citra, Zel; Wibowo, Paksi Dwiyanto; Malinda, Yosie
CIVED Vol. 9 No. 3 (2022): September 2022
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v9i3.350112

Abstract

Proporsi sumber daya dalam suatu konstruksi proyek sangat penting direncanakan secara tepat dan efisien. Sumber daya tersebut terdiri dari tenaga kerja (manusia), bahan bangunan (material), serta peralatan yang digunakan. Penelitian ini ditujukan untuk mengidentifikasi, menganalisis, dan menentukan proporsi sumber daya proyek untuk proyek konstruksi bangunan pabrik gudang Finish Good PT Charoen Pokphand Indonesia. Pada penelitian ini, proporsi optimal sumber daya proyek dianalisis menggunakan aplikasi Java dan dibatasi pada analisis sumber daya material, tenaga kerja, dan peralatan. Proyek pembangunan gudang Finish Good sesuai rencana anggaran biaya pekerjaan menelan biaya sebesar Rp 21.651.400.000 dengan luas bangunan ±6000 m2, dan durasi pelaksanaan pekerjaan selama 120 hari. Dari hasil analisis data penelitian diperoleh proporsi kondisi optimal sebesar 66,053% untuk sumber daya material dengan total biaya senilai Rp 14.301.399.242; sumber daya manusia atau upah sebesar 17,895% dengan total biaya senilai Rp 3.874.518.000; sumber daya peralatan sebesar 9,263% dengan total biaya senilai Rp 2.005.569.182, serta proporsi untuk biaya subkontraktor sebesar 6,789% dengan total biaya senilai Rp. 1.469.913.546.
Integrasi Metode Friedman dan Definitive Technique Berbasis Aplikasi Guna Meningkatkan Probabilitas Menang dan Profit Harapan Tender Proyek Bangunan Precast Citra, Zel; Wibowo, Paksi Dwiyanto; Malinda, Yosie; Apdeni, Risma
CIVED Vol. 9 No. 3 (2022): September 2022
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v9i3.351112

Abstract

Memenangkan tender proyek dengan nilai penawaran rendah tetapi profit yang besar merupakan salah satu masalah yang selalu dihadapi oleh perusahaan konstruksi, termasuk untuk proyek bangunan precast. Tingkat akurasi -5% hingga 10% dalam estimasi biaya diperlukan saat penyusunan penawaran. Penelitian ini menawarkan solusi pemasalahan tersebut melalui penerapan integrasi Definitive Technique berbasis Java dan analisis markup untuk meningkatkan winning ratio. Dalam penelitian ini dilakukan analisis probabilitas menang tender dan profit harapan menggunakan metode Friedman terhadap nilai penawaran tender berdasarkan metode estimasi Definitive Technique berbasis aplikasi Java pada proses tender proyek bangunan precast. Hasil penelitian menunjukkan bahwa efisiensi biaya langsung struktur precast sebesar 29% menggunakan nilai markup optimum sebesar 20,5% dengan probabilitas menang tender sebesar 70,2% serta profit harapan yang akan diperoleh sebesar 14,4%
Evaluasi Biaya Risiko Proyek di Masa Pandemi Covid-19 dengan Menggunakan Java Programming pada Konstruksi Bangunan Gedung Citra, Zel; Wibowo, Paksi Dwiyanto; Malinda, Yosie; Apdeni, Risma
CIVED Vol. 10 No. 1 (2023): March 2023
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v10i1.375112

Abstract

Penyebaran virus corona (Covid-19) berdampak pada industri konstruksi. Beberapa proyek berisiko tidak selesai karena berbagai faktor yang disebabkan oleh virus corona. Pasar konstruksi diperkirakan berangsur normal dari triwulan 2021 sesudah turun pertumbuhan akibat pandemi COVID-19 2020. Kualitas, mutu dan biaya proyek yang sudah direncanakan harus bisa terealisasi dan tercapai secara optimal. Khusunya pada estimasi anggaran biaya harus disusun secara detail, sesuai tujuan anggaran biaya proyek. Selain itu juga penting meminimalkan kerugian dan namun harus meningkatkan efisiensi, efektivitas, dan profitabilitas kerja. Pada suatu proyek, biaya pada dasarnya dikelompokkan menjadi tiga kategori yaitu biaya langsung, biaya tidak langsung dan biaya tambahan atau biaya risiko proyek. Pada penelitian ini dilakukan analisis biaya risiko pada proyek bangunan gedung dengan menggunakan aplikasi perangkat lunak Java akibat adanya efek dari pandemi Covid-19. Hasilnya biaya pembangunan normal sebesar Rp. 6.800.000.000,- dengan durasi proyek 150 hari, Membutuhkan adanya tambahan biaya risiko sebesar 3,646%. Dengan demikian, jumlah biaya keseluruhan untuk proyek pembangunan gedung kantor pusat tersebut adalah Rp. 7.047.928.000,-. Jadi jumlah biaya risiko adalah Rp 247.928.000,-.
Penilaian Risiko Proyek Infrastruktur Kereta Api Cepat Jakarta – Bandung Ashadi, Reza Ferial; Citra, Zel; Sari, Intan Purnama
CIVED Vol. 10 No. 2 (2023): June 2023
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v10i2.413

Abstract

Masa depan adalah hal yang tidak pasti tapi risiko adalah suatu keniscayaan yang pasti terdapat dalam setiap proyek. Oleh karena itu perlu dilakukan suatu pengelolaan risiko untuk meminimalisisr dampak negatif yang mungkin terjadi yang menimbulkan kerugian dalam proyek tersebut. Seni mengelola risiko adalah tujuan dari manajemen risiko yang dapat digunakan untuk menilai suatu risiko, sehingga dapat mengidentifikasi, menganalisis, serta mengevaluasi risiko yang dapat terjadi pada suatu proyek konstruksi, seperti pada proyek infrastruktur. Proyek Kereta Api Cepat Jakarta Bandung adalah suatu mega proyek infrastruktur yang pengerjaannya dilakukan secara bersama oleh Indonesia dan China ditenggarai mempunyai risiko yang sangat tinggi sehingga diperlukan suatu pengelolaan risiko yang tepat untuk meminimalisisr dampak negatifnya. Dalam penelitian ini diambil studi kasus proyek tersebut pada Seksi II yaitu dari Karawang-Purwakarta. Metode yang digunakan adalah HIRADC yang dikombinasikan dengan metode Severity Index untuk analisis risikonya. Penelitian ini dibatasi hanya dari sudut pandang kontraktor. Dari hasil penelitian didapatkan 30 jenis risiko yang bisa diklasifikasi kedalam 9 kategori pada tahap konstruksi. Dari 30 jenis risiko tersebut, berdasarkan hasil analisis terdapat 3 jenis risiko tinggi yaitu keterlambatan pembayaran oleh pemilik proyek, kesulitan akses menuju lokasi proyek, dan ketidakpastian kondisi di lapangan.
Evaluasi Mutu Beton dengan Core Drill Test Berdasarkan SNI 2847-2019 pada Struktur Kolom Bangunan Gedung Laboratorium Citra, Zel; Wibowo, Paksi Dwiyanto; Malinda, Yosie; Wibisono, Anom; Apdeni, Risma
CIVED Vol. 10 No. 2 (2023): June 2023
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v10i2.417

Abstract

Kelayakan suatu bangunan harus memenuhi standar kelayakan untuk menahan beban dan faktor keamanan. Pengujian analisa kelayakan untuk kekuatan atau mutu struktur bangunan dapat menggunakan metode Non Destructive Test (NDT) dan Destructive Test (DT). Salah satu metode pengujian terkait mutu beton bisa menggunakan Core Drill Test dimana pengujian ini termasuk ke dalam kategori Destructive Test (DT). Penelitian dan pengujian Core Drill ini dilakukan untuk melihat kondisi beton pada bangunan gedung laboratorium PT. CPI yang terletak di pinggir pantai Ancol. Hasil pengujian dan analisa data untuk mutu beton struktur kolom sebagian besar belum memenuhi persyaratan minimum kuat tekan beton struktur khusus berdasarkan SNI-2847-2019. Data dari uji tekan untuk sampel Core Drill yang diambil pada struktur kolom laboratorium terlihat mutu beton yang memenuhi syarat SNI-2847-2019 hanya pada CD 1- beton kolom lantai dasar dengan nilai 25,11 Mpa. Struktur lainnya mulai dari CD2 – beton kolom lantai dasar, CD3 – beton kolom lantai 1, CD4 – beton kolom lantai 2, dan CD 5 – beton kolom lantai 3 dimana mutu beton di bawah standar SNI yang mempersyaratkan minimal 21Mpa.
Evaluation of Project Budget Due to Price Fluctuations Based on Digital Technology in Factory Construction Projects Citra, Zel; Wibowo, Paksi Dwiyanto; Malinda, Yosie
CIVED Vol. 10 No. 3 (2023): September 2023
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v10i3.440

Abstract

The development of industrial construction requires adequate resources to avoid the failure and risk of the project. The resources required are materials (building materials), human resources (human resources), machines (equipment), capital (money), methods (methods of implementation), timing, and information on the implementation of the construction. According to data from the Central Statistical Agency (BPS), wages of labor in Indonesia of Rs. 2.89 million increased by 1.12% by 2022. In addition, the price of construction materials has also increased, such as steel, steel bones, concrete, and other construction materials. Especially steel price increases, starting in the second year of the pandemic, have risen about 30%–40%. Generally, the construction of factory buildings uses more steel profiles for the construction of warehouses—storage of raw materials or warehousing of production sites. This has a huge impact on the project budget that has been estimated prior to material price fluctuations. Therefore, the re-evaluation of the project budget in PT. XYZ, which has been estimated by the company at Rp. 219.5 billion, has a total budget change to Rp. 276.1 billion.
Testing of Concrete Structures with Non-Destructive Test Method (NDT) Using Ultrasonic Pulse Velocity (UPV) at the Building on the Ancol Beach Citra, Zel; Wibowo, Paksi Dwiyanto; Malinda, Yosie; Wibisono, Anom; Apdeni, Risma; Herol, Herol
CIVED Vol. 11 No. 1 (2024): March 2024
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v11i1.530

Abstract

The UPV test procedure with the PUNDIT device is set based on the concept of the wave flow speed passing through a solid object bound to the elastic properties of a tangible medium. When used properly and correctly, this tool will provide a lot of information about the condition of the surface or the inside of the concrete. Classification for pulse velocity results according to the speed criteria of concrete quality presented in BS 1881: Section 203:1986 as follows: 4500 m/s = excellent concrete condition, 3400 – 4500 m/s = good concrete conditions, 3000-3500 m/s = medium concrete situation, < 3000 m/ s = concrete problem condition (doubtful concrete condition). The pulse velocity test results are measured by three methods: direct transmission, semi-direct transmission and indirect or surface transmission. The test results for the structure of the beams, cylinders, tie beams, and floor plates of the office building on the edge of the anchor showed that it is in medium concrete condition. The average value of the estimated quality of concrete results of the test UPV Pundit for Beams was 25,29MPa, Slabs was 25,17MPa, Tie Beam was 25,06MPa, and Pilecap was 25,46MPa. The result has met the minimum requirement for concrete solid pressure of 21MPa for the quality of unique structures concrete according to SNI-2847-2019.