Claim Missing Document
Check
Articles

ANALISIS PENERAPAN MODEL WORK BASED LEARNING PADA PROGRAM KEAHLIAN DESAIN PEMODELAN INFORMASI BANGUNAN DI SMK NEGERI 1 PADANG Dede Ramanda; Fani Keprila Prima; Ari Syaiful Rahman Arifin; Fitra Rifwan
Jurnal Applied Science in Civil Engineering Vol. 6 No. 4 (2025): Jurnal Applied Science in Civil Engineering
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/asce.v6i4.139183

Abstract

Penelitian ini bertujuan untuk menganalisis penerapan model Work Based Learning (WBL) pada Program Keahlian Desain Pemodelan Informasi Bangunan (DPIB) di SMK Negeri 1 Padang. Latar belakang penelitian ini berangkat dari kesenjangan antara kompetensi lulusan SMK dengan kebutuhan industri konstruksi yang menuntut keterampilan praktis, kolaboratif, dan adaptif terhadap perkembangan teknologi. Penelitian menggunakan pendekatan kuantitatif deskriptif dengan responden terdiri dari siswa kelas XII TP.2024/2025, guru pembimbing, dan mitra industri. Pengumpulan data dilakukan melalui kuesioner dan dokumentasi yang mencakup tiga aspek utama: Pembelajaran Kontekstual (kesiapan guru, kurikulum, dan fasilitas), Keterlibatan Dunia Industri (pelaksanaan pembelajaran dan keterlibatan industri), serta Dampak Work Based Learning (kompetensi siswa dan kepuasan mitra industri). Hasil penelitian menunjukkan bahwa model WBL efektif meningkatkan kompetensi teknis dan nonteknis siswa serta memperkuat kemitraan antara sekolah dan dunia industri. Temuan ini menegaskan pentingnya penguatan kolaborasi kurikulum dan evaluasi berbasis industri untuk meningkatkan relevansi pendidikan vokasi terhadap kebutuhan dunia kerja.
Analisis Perbandingan Waktu dan Biaya Pekerjaan Pelat Lantai Menggunakan Metode Konvensional dan Precast Half Slab pada Rumah Sakit X Maulana, Febrio; Arifin, Ari Syaiful Rahman; Yandra, Muvi; Prima, Fani Keprila
MASALIQ Vol 6 No 3 (2026): MASALIQ: Jurnal Pendidikan dan Sains
Publisher : Lembaga Yasin AlSys

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58578/masaliq.v6i3.9677

Abstract

The selection of the floor slab construction method has become an important issue in multi-storey building projects because it directly affects time and cost efficiency, while studies specifically comparing conventional and precast half slab methods in hospital buildings remain relatively limited. This study aims to analyze the comparison of time and cost in floor slab work using conventional and precast half slab methods in the construction of Hospital X. This study employed a quantitative approach with a case study design. Data were collected through field observation, interviews, and project documentation, and were then analyzed using descriptive comparative analysis. The results showed that the conventional method required a duration of 26 days per floor at a cost of Rp594,552,359, whereas the precast half slab method required a duration of 18 days per floor at a cost of Rp425,251,134. These findings indicate that the precast half slab method was 8 days faster and saved Rp169,301,225 compared with the conventional method. Thus, this study confirms that the precast half slab method is more efficient in terms of time and cost, and provides a practical contribution for contractors and project owners in determining a more effective floor slab work method for hospital buildings and multi-storey buildings.