Claim Missing Document
Check
Articles

Perancangan Sistem Proteksi Petir Eksternal Menggunakan Metoda Collecting Volume pada Gudang TNT di PT Dahana (Persero) VERIYANDI, RENDI; WALUYO, WALUYO; SAODAH, SITI
REKA ELKOMIKA Vol 2, No 4 (2014)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1404.096 KB)

Abstract

Abstrak Gudang TNT merupakan gudang penyimpanan bahan peledak, apabila terjadi ledakan pada gudang TNT maka perusahaan akan mengalami kerugian dan membahayakan korban jiwa. oleh karena itu dibutuhkan sistem proteksi petir eksternal untuk melindungi gudang TNT dari sambaran petir langsung. Untuk Berdasarkan hal tersebut, maka telah dirancang suatu sistem proteksi eksternal menggunakan metoda collecting volume. Dari hasil perhitungan sistem proteksi eksternal dengan sudut 00 dan arus puncak petir 50 kA didapatkan jarak sambaran rs 92,83 m, nilai radius lindung Δmax sebesar 54,53 meter, collecting volume Vcoll 489961,21 m3 dan sudut lindung s 79,610 dengan luas penampang down conductor 50 mm2 dan nilai pentanahan 0,931 W. Kata kunci: Gudang TNT, Proteksi Eksternal, Collecting Volume, Down Conductor, Pentanahan. Abstract TNT warehouse is a warehouse or storage of explosives TNT, if there is an TNT explosion at a warehouse TNT company will suffer losses and endanger lives. therefore required external lightning protection system to protect the warehouse tnt from direct lightning strikes. Based an that reason, if has been design an external protection using collecting volume method. Based an the calculating result of external protection system with angle 00 and the peak current of 50 kA lightning strikes it was obtained the distance rs 92.83 m, the value of protected Δmax radius of 54.53 meters, collecting volume of 489961.21 m3 and the angel protection θs 79.610, with the cross-sectional area of 50 mm2 down conductor and grounding value 0.931W.   Keywords: TNT Warehouse, External Protection, Collecting Volume, Down Conductor, Grounding.
RANCANG BANGUN MODEL PEMBATAS ARUS LISTRIK BERBASIS MIKROKONTROLLER ATMEGA328 DENGAN MODUL ARDUINO UNO PERDANA, SALISTIA PUTRA; SYAHRIAL, SYAHRIAL; SAODAH, SITI
REKA ELKOMIKA Vol 2, No 1 (2014)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (600.687 KB)

Abstract

Abstrak Pada umumnya, pembatasan arus dapat berupa MCB yang dapat disetting dan yang tetap. Pembatasan arus listrik yang mengambil fungsi-fungsi MCB dapat dilakukan dengan sebuah mikrokontroler ATmega328 dengan modul Arduino Uno. Masukan isyarat dicuplik oleh ADC dari sensor arus efek hall bertipe ACS714LLCTR-30A-T untuk menentukan besar arus RMS jala-jala. Waktu tunda pemutusan jala-jala dihitung dengan menggunakan kaidah pertidak-samaan dalam matematika. Pemutusan jaringan listrik dilakukan oleh rangkaian TRIAC BT139 yang didrive optoTriac MOC3041. Keypad, LCD, dan Pushbutton dipasang untuk tujuan antarmuka dengan pengguna. Setelah sistem dibuat, dilakukan pengujian. Pengujian ADC mempunyai kesalahan 0,47%. Pengujian pembacaan sensor arus mempunyai kesalahan sebesar 0,13%. Pada pengujian arus inrush, sistem bekerja dengan baik dengan menghindari trip saat beban dinyalakan. Pada pengujian beban lebih, sistem dapat memberikan waktu tunda untuk memutuskan jaringan sesuai penyetingan yang diberikan pada sistem. Terakhir, pengujian beban hubung singkat, sistem tidak mampu mencegah gangguan ini karena dua hal, arus hubung singkat (Isc>125A, dibuktikan oleh tripnya MCB Heger MY325 C) melebihi batas toleransi arus lebih sensor arus ACS714 (100 A) dan TRIAC BT139 (3 cyle untuk 120 A). Kata kunci: Arduino Uno, MCB, mikrokontroler AtMega328, pembatas arus, sensor arus ACS714, TRIAC BT139. Abstract Generally, a current limiting can do using setted or fixed MCB. In this project, a settable current limiting device has been develoved. Functions of the MCB that taked by eectric current limiting, can be performed by the microcontroller ATmega328 in Arduino Uno module. The input signals were sampled by the input ADC from the hall effect current sensor type ACS714LLCTR-30A-T to determine the magnitude of the RMS current in an electrical grid. A time delay termination electrical grid was calculated by using a mathematical linear inequalities theorem. This termination was done by a series of electrical grid TRIAC BT139 which was driven by the Optotriac MOC3041. The keypad, LCD and pushbutton were installed for user interface. Futhermore the system was created and tested. The ADC testing had 0.47% error. The current sensor reading test had error of 0.13%. In the inrush current testing, the system worked well by avoiding trips when the load was turned on. In other load testing, the system could provide a time delay to decide the appropriate network setup given in the system. Finally in the test load short circuit, the system was not able to work properly because of two factors, i.e short-circuit current (Isc> 125A, evidenced by the MCB trip Heger MY325 C) exceeds the tolerance limit overcurrent of current sensor (ACS714 Overcurrent Transient Tolerance as 100 A) and TRIAC BT139 (3 cyle to 120 A). Keywords: Arduino Uno, MCB, ATmega328 microcontroller, current limiters, ACS714 current sensor, triac BT139.
Perancangan dan Realisasi Solar Charge Controller Maximum Power Point Tracker dengan Topologi Buck Converter untuk Charger Handphone IHSAN, ARIO AMRI; WALUYO, WALUYO; SAODAH, SITI
REKA ELKOMIKA Vol 3, No 2 (2015)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (738.179 KB)

Abstract

Abstrak Pembangkit Listrik Tenaga surya (PLTS) mempunyai kelemahan dimana daya keluaran dari modul surya sangat tergantung pada kondisi sinar matahari. Apabila cuaca mendung, maka daya yang dihasilkan oleh modul surya juga berkurang. Rangkaian MPPT ini adalah solusi untuk mencari daya maksimum modul surya tersebut dalam cuaca cerah atau saat langit mendung. Dalam merancang MPPT ini, penulis memakai mikrokontroler PIC16f1503 sebagai otak dari metoda MPPT ini. Penulis juga menambahkan topologi buck converter untuk menurunkan tegangan dari modul surya menjadi 12 VDC. Hal itu dikarenakan tegangan nominal modul surya adalah 12 VDC dan pada saat siang hari tegangan itu dapat berubah menjadi lebih tinggi, Vmaksimum bisa mencapai 17,19 VDC. Apabila tegangan keluaran modul kurang dari 12 VDC atau pada saat malam hari (Vout modul = 0 VDC) maka beban akan disuplai murni oleh baterai. Penulis juga menambahkan inverter karena perancangan alat ini nantinya akan bisa digunakan secara universal. Dari hasil pengujian alat, diketahui bahwa daya keluaran dari solar charge controller MPPT ini lebih efisien dibandingkan dengan solar charge controller PWM biasa. Presentase rata-rata kelebihan daya keluaran modul surya yang dihasilkan charge controller MPPT ini bisa mencapai 11% dibandingkan dengan charge controller PWM biasa. Kata kunci: baterai, buck converter, charger handphone, inverter, modul Surya, MPPT. Abstract Solar Power Plant has a weakness where the power output of the solar modules is highly depend on sunlight condition. When it’s cloudy, the generated power by the solar modules will be reduced. MPPT is a solution to seek the maximum power of the solar modules in clear weather, or when the sky is overcast. In the designing of MPPT, the authors use a microcontroller PIC16f1503 as the brains of MPPT method. The authors also added buck converter topology to reduce the voltage of the solar modules to 12 VDC. It was due to nominal voltage of the solar module was 12 VDC and during the day the output power could reach higher voltage, voltage maximum could reach 17.19 VDC. When the output voltage of the module was less than 12 VDC or at night (Vout module = 0 VDC), the load would be supplied purely by the battery. The authors also added an inverter because of its design would be used by universally. Based on the results of testing system, the output power of the MPPT solar charge controller was more efficient than that ordinary PWM solar charge controller. The average percentage of excess output power of solar modules produced by MPPT charge controller could reach 11% compared to the PWM charge controller. Keywords : battery, buck converter, charger cell phone, inverter, MPPT, solar module.
Analisis Perhitungan Ekonomi dan Potensi Penghematan Energi Listrik pada Pembangkit Listrik Tenaga Uap di Pabrik Kelapa Sawit PT. X SIHOMBING, VALDO; HARIYANTO, NASRUN; SAODAH, SITI
REKA ELKOMIKA Vol 2, No 2 (2014)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (445.9 KB)

Abstract

Abstrak Energi fosil (minyak bumi, batu bara dan gas) persediaanya semakin lama semakin berkurangdan dan untuk perbaharuannya dibutuhkan waktu yang sangat lama. Penghematan energi adalah tindakan mengurangi jumlah penggunaan energi yang berlebihan atau yang terbuang. Penghematan energi merupakan unsur yang penting dari sebuah kebijakan energi, semakin meningkatnya penggunaan energi sejalan dengan berkembangnya perkonomian dan industri, jika terjadi krisis energi akan sangat berpengaruh terhadap kelangsungan perekonomian negara serta dampak lain bagi industri seperti diberlakukannya tarif listrik dua kali lipat. Maka dari itu pembangkitan listrik pada PKS diperlukan penghematan  energi  listrik dan keekonomian. Metoda dalam penghematan energi listrik dan keekonomian, terlebih dahulu melakukan pengukuran  tegangan, arus, daya dan faktor daya pada generator, boiler dan  digester. Pada Penelitian Tugas akhir ini akan dianalisa penghematan energi untuk Pabrik Kelapa Sawit (PKS) PT. X. Dari Hasil penelitian menunjukan bahwa Faktor Kebutuhan oleh generator 1800 kW sebesar 57,3 %, Penghematan pada rugi-rugi boiler dengan menggunakan Economizer dapat menghasilkan penghematan sebesar Rp.116.000.000 pertahunnya dengan payback period 1.7 tahun.   Kata kunci: Penghematan Energi, Faktor Kebutuhan, Faktor Daya, Boiler, Payback Period. Abstract Fossil energy (oil, coal and gas) is increasingly and to takes a very long time. Saving energy is the act of reducing the amount of energy use excessive or wasted. Saving energy is an important element of an energy policy, increasing energy use in line with the development of interconnected economy and industry, in the event of an energy crisis will greatly affect the continuity of the country's economy as well as other effects such as the imposition of tariffs for industrial electricity doubled. Thus the generation of electricity at the PKS required electrical energy savings and frugality. Method in electrical energy savings and frugality, first perform the measurement voltage, current, power and power factor at the generator, boilers and digesters. In this thesis research will analyze the energy savings for palm oil mill (PKS) PT. X. From the results showed that the factors need by 1800 kW generator of 57.3%, savings in loss-boiler with economizer use can result in a savings of Rp.116.000.000 per year with payback period of 1.7 years.   Keywords: Energy Saving, Factor Supplies, Power Factor, Boiler,Payback Perriod
Perancangan dan Realisasi Kebutuhan Kapasitas Baterai untuk Beban Pompa Air 125 Watt Menggunakan Pembangkit Listrik Tenaga Surya DJAUFANI, MUHAMAD BENY; HARIYANTO, NASRUN; SAODAH, SITI
REKA ELKOMIKA Vol 3, No 2 (2015)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1223.061 KB)

Abstract

ABSTRAK Sistem photovoltaic dengan memanfaatkan energi surya pada sistem pompa air sebagai penyuplai daya adalah salah satu contoh proyek aplikatif pengembangan potensi daya elektrik menggunakan energi surya secara luas di Indonesia. Metoda penelitian ini menggunakan panel surya yang dibebani dengan pompa air pada keadaan cuaca cerah dan mendung. Dari hasil pengukuran dan analisis, didapatkan persentase jatuh tegangan dengan beban yang sama pada sistem fotovoltaik terbesar terjadi pada saat keadaan cuaca mendung sebesar 5,06 % dan jatuh tegangan terkecil pada keadaan cuaca cerah sebesar 4,32 %. Dari hasil pengukuran kapasitas baterai, arus yang terukur pada 10 menit pertama adalah 16,1 ampere, dan 10 menit ke enam sebesar 13,25 ampere, dibandingkan dengan hasil perhitungan sebesar 37,5 Ah. Sisa kapasitas baterai setelah pemakaian adalah 13,25 Ah. Efisiensi rata-rata inverter adalah 46,7835 %. Kebutuhan kapasitas baterai untuk beban pompa air 125 watt menggunakan pembangkit listrik tenaga surya sudah tepat. Kata Kunci : Fotovoltaik, Baterai, Pompa Air, Inverter, Jatuh Tegangan ABSTRACT Photovoltaic can be defined as a process of sunlight conversion directly into electrical energy with the help of solar cells. For instance, using solar energy extensively in Indonesia on water pump system as power supply, is a potential electrical supply project development application. The research method was the solar panel on the loaded water pump on sunny and cloudy condition. As trial and analysis results, the voltage drop percentage with the same debit on biggest photovoltaic system was happened on the cloudy weather, as 5.06 %, and the smallest on the sunny weather, as 4.32%. From the results of measurements of current battery capacity, it was measured in the first 10 minutes of 16.1 amperes, and sixth 10 minutes of 13.25 amperes, compared to the results of the calculation of 37.5 Ah. The remaining battery capacity after 1 hour due to the water pump loaded was 13.25 Ah. The inverter efficiency was 46,7835 % in average. The necessary battery capacity due to the water pump 125 watt loaded using solar power was proper choice. Key word: photovoltaic, battery, water pump, inverter, drop voltage
Studi Gangguan Hubung Tanah Stator Generator Menggunakan Metoda Harmonik Ketiga di PT. Indonesia Power UP. Saguling WALUYO, WALUYO; SEPGIANTO, GARY ANDRI; SAODAH, SITI
REKA ELKOMIKA Vol 4, No 2 (2016)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1458.013 KB)

Abstract

ABSTRAK Generator sinkron merupakan peralatan yang mengubah energi mekanik menjadi energi listrik. Keandalan fungsi generator sangat penting, sehingga  perlu diproteksi untuk mencegah terjadinya kerusakan dari gangguan yang tidak diinginkan yaitu hubung singkat satu fasa ke tanah. Tujuan penelitian ini adalah untuk memperoleh besar perubahan tegangan harmonik ketiga saat terjadi gangguan hubung tanah stator. Untuk menentukan karakteristik harmonik ketiga, maka perhitungan dilakukan pada dua kondisi yaitu kondisi normal dan gangguan. Metode harmonik ketiga pada kondisi gangguan menggunakan tiga skema. Saat skema tegangan kurang besaran tegangan harmonik ketiga adalah sebesar 35-40 Volt. Saat skema tegangan lebih maka besaran tegangan harmonik ketiga adalah sebesar 130-135 Volt. Saat skema rasio tegangan, rasio V3t terhadap V3n, maka saat kondisi normal adalah 0,81, dimana daerah yang terlindungi pada skema ini sebesar 60% dari netral generator. Kata kunci : generator, gangguan hubung tanah stator, harmonik ketiga, skema harmonik ketiga ABSTRACT Synchronous generator is a device that converts mechanical energy into electrical energy. Reliability function generator is very important, so that a protection to prevent damage from unwanted interference, ie one phase short circuit to ground, is necessary. The purpose of study was to obtain third harmonic voltage magnitude changes during disturbances of stator ground fault. To determine third harmonic characteristic, a computation was performed on two conditions, namely normal and fault conditions. The third harmonic method, under fault conditions, used three schemes. When it was under voltage scheme, the third harmonic voltages were 35-40 Volts. When it was the third harmonic over voltage scheme, the magnitudes were 130-135 Volts. When the voltage ratio scheme, the ratio of the current V3t to V3n, so that the normal condition was 0.81, where the protected area in this scheme was 60% of the generator neutral. Keywords: generator, stator ground fault, the third harmonik, the third harmonik scheme
PERANCANGAN DAN REALISASI LISTRIK WIRELESS MENGGUNAKAN RESONANT COUPLING MAGNETIC RAMDHANI, RAMDHANI; WALUYO, WALUYO; SAODAH, SITI
REKA ELKOMIKA Vol 1, No 1 (2013)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (429.014 KB)

Abstract

ABSTRAK   Transfer energi listrik dapat dilakukan dengan metoda resonansi, yaitu dengan menyamakan frekuensi pada sisi pengirim (transmitter) dengan sisi penerima (receiver). Frekuensi yang digunakan adalah 22 khz yang dihasilkan pada rangkaian inverter setengah gelombang dengan tegangan output 100 Vac, dihubungkan dengan kapasitor dan kumparan pengirim. Pada listrik wireless ini dilakukan tiga kali percobaan yaitu kumparan pada 50 lilitan, 30 lilitan dan 20 lilitan. Ini dilakukan untuk mengetahui besar impedansi yang dihasilkan, yang berpengaruh untuk transfer energi listrik. Untuk kumparan optimalnya adalah 20 lilitan, Karena pada 30 dan 50 lilitan impedansi yang dihasilkan lebih besar dari pada 20 lilitan. Jarak transfer maksimal dari kumparan pengirim (transmitter) kepada kumparan penerima (receiver) adalah 25 cm dengan tegangan 6,32 Vac dan jarak minimal adalah sebesar 10 cm dengan tegangan 15,6 Vac. Ini membutikan jika jarak semakin jauh maka tegangan semakin kecil dan daya pancarnya semakin kecil dan jika jaraknya semakin dekat  maka tegangan semakin besar. Kata kunci: induksi, wireless, jarak ABSTRACT Electricity Energy Transfer can be done with the method resonansi, that is with frequency on the sender side equalize (transmitter) with a side of receiver (receiver). The frequency used is 22 khz resulting in a series of half-wave voltage inverter with 100 Vac, output is connected to the capacitor and the coil is the sender. Wireless electricity is conducted at three times the experiment is at 50 coil, 30 coil and 20 coil. This is done to know the large impedance is produced, the influential for the transfer of electrical energy. For optimal coil is a coil 20, because at 30 and 50 coil impedance resulting is greater than 20 coils.Transfer maximum distance of the coil the sender (transmitter) to coil the recipient (receiver) is 25 cm to voltage 6,32 Vac and a minimum distance is as much as 10 cm to voltage 15,6 Vac. This proves that if the far distance then the smaller voltage and if the distance getting closer voltage so thet the emissitivity is getting better. Keywords: induction, wireless, distance
Analisis Penalaan Rele Jarak sebagai Proteksi Utama pada Saluran Udara Tegangan Tinggi 150 kV Bandung Selatan – Cigereleng SUDRAJAT, RHAMANDITA; SAODAH, SITI; WALUYO, WALUYO
REKA ELKOMIKA Vol 2, No 1 (2014)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1332.98 KB)

Abstract

Abstrak Transmisi daya listrik menggunakan saluran udara tegangan tinggi, Saluran tersebut sangat rentan terhadap gangguan karena jarak yang sangat jauh. Oleh karena itu, dibutuhkan kehandalan sistem proteksi yang tinggi untuk mengamankan saluran udara tersebut. Untuk memenuhi kehandalan dari sistem proteksi, maka perlu dilakukan penalaan rele jarak, Dalam kasus penelitian ini, diambil saluran transmisi yang menghubungkan gardu induk Bandung Selatan – Cigereleng. Dalam penalaan rele jarak tersebut dibagi ke dalam tiga Zona proteksi.  Dari hasil perhitungan, penalaan rele jarak untuk Zone 1 sebesar 0,205 ∠69,39o Ohm dengan waktu operasi trip 0 detik, Zone 2 sebesar  1,201 ∠70,76o Ohm dengan waktu operasi trip 0,4 detik, dan Zone 3 sebesar  2,175 ∠70,804o Ohm dengan waktu operasi trip 1,6 detik.   Kata kunci: Rele Jarak,Zona Proteksi,Saluran Transmisi,Sistem Proteksi. Abstract Electrical power transmission’s use overhead lines high voltage , The overhead lines are very vulnerable to disturbance because of long distances. It is needed realiability protection system to serves the protection of overhead high voltage. To meet the reliability of protection system, it is necessarsary it setting lines the distance relay for transmission lines. In this research sampel, it was the transmission line that  Connecting the substation Bandung selatan – Cigareleng. the setting of distance relay, it divided into three zones of protection. Wore done the result of calculation, the distance relay setting for Zone 1 was 0.205 ∠ 69.39o Ohm with the trip operating time 0 seconds, Zone 2 was 1.201 ohm ∠ 70.76o with trip operation time of o.4 seconds , and Zone 3 was 70.804 ∠ 2.175o Ohm with trip operating time of 1.6 seconds.   Keywords: Distance Relay,Zone Protection,Transmission Line,Protection System.
Analisis Perhitungan Cable Sizing Sistem Pembangkit Listrik Tenaga Mikro Hydro Nua 2 X 4.4 MW GRADY, GREGORIUS; SAODAH, SITI
REKA ELKOMIKA Vol 5, No 1 (2017)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAK PLTMH NUA 2 X 4,4 MW adalah salah satu pembangkit listrik tenaga mikrohidro yang diharapkan dapat membangkitkan daya yang cukup bagi masyarakat di sekitarnya. Oleh karena itu setiap komponen ataupun peralatan utama pada PLTMH NUA harus tersuplai dengan baik melalui konduktornya yaitu kabel. Berdasarkan hal tersebut maka diperlukan perhitungan yang akurat mengenai perhitungan ukuran kabel yang didasarkan pada arus beban penuh, penurunan kemampuan hantar arus kabel akibat adanya derating factor, dan besarnya drop voltage. Hasil perhitungan tersebut harus memenuhi syarat yaitu 14ICC>IMCC>IFL"> dan 14%VD<3%"> saat kondisi beban penuh dan saat kondisi starting adalah 14%VD<15%"> . Hasil perhitungan menunjukkan bahwa setiap persyaratan telah terpenuhi oleh masing-masing kabel. Kata kunci : PLTMH NUA, Kabel, Arus beban penuh, Derating Factor, Drop Voltage
Analisis Pemilihan Pentanahan Titik Netral Generator Pada PLTMH 2 x 4,4 MW Nua Ambon AGRISELIUS, ASYER; SYAHRIAL, SYAHRIAL; SAODAH, SITI
REKA ELKOMIKA Vol 2, No 2 (2014)
Publisher : REKA ELKOMIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (840.133 KB)

Abstract

Abstrak Pentanahan titik netral generator pada pembangkit tenaga listrik sangat penting dalam hal proteksi peralatan dari gangguan hubung singkat ke tanah, pengamanan terhadap manusia dan penyaluran daya listrik, oleh karena itu diperlukan perhitungan dan perancangan agar generator dapat terproteksi jika terjadi gangguan hubung singkat ke tanah. Dalam penelitian ini, untuk menentukan jenis pentanahan titik netral generator dengan kapasitas 2 x 4,4 MW maka dilakukan perhitungan dan simulasi gangguan hubung singkat 3 phasa ke tanah, gangguan hubung singkat 1 phasa ke tanah, pemilihan metoda pentanahan titik netral generator, perhitungan tegangan sentuh dan perhitungan tegangan langkah. Dimana jenis pentanahan yang dipilih adalah pentanahan dengan tahanan yaitu 72 Ω, sedangkan model pentanahan yang dipilih untuk pengamanan area pembangkit adalah pentanahan menggunakan grid dengan jumlah batang konduktor yang terpasang = 12 batang, sehingga diperoleh Es sebenarnya = 225,3 Volt lebih kecil dari nilai Es yang diizinkan = 730,5 Volt dan El yang sebenarnya = 102,6 Volt lebih kecil dari nilai El yang diizinkan = 2429,7 Volt. Dengan demikian design pentanahan yang dilakukan telah memenuhi persyaratan. Pembahasan ini berdasarkan perhitungan dan simulasi menggunakan batasan-batasan yang terdapat dalam teori. Kata kunci: Pentanahan, Generator 2 x 4,4 MW, Gangguan Hubung Singkat,  Es,  El, Sistem Grid, Konduktor Abstract Neutral grounding Generator point on the power plant is very important in terms of equipment protection from short circuit to ground disturbance, human security and distribution of electrical power, therefore the necessary calculations and design so that the generator can be protected in the event of a short circuit fault to ground. In this study, to determine the type of grounding the neutral point of the generator with a capacity of 2 x 4.4 MW, the calculation and simulation of 3-phase short circuit fault to ground, short circuit interruption 1 phase to ground, the selection method of grounding the generator neutral point, touch voltage calculation and calculation of the voltage step. Where grounding type chosen is grounded with a resistance that is 72 Ω, while grounding the model chosen for securing the grounding area using a grid generation is the number of conductor bars are attached = 12 rods, in order to obtain the actual Es = 225.3 volts less than the value of Es which allowed = 730.5 Volts and actual El = 102.6 volts less than the allowable value of El = 2429.7 Volt. Thus the grounding design has been undertaken to meet the requirements. This discussion is based on calculations and simulations use restrictions contained in the theory. Keywords: Grounding, Generator 2 x 4.4 MW, Short-circuit Disorders, Es, El, Grid Systems, Conductor