Claim Missing Document
Check
Articles

Found 4 Documents
Search
Journal : Jurnal JEETech

Analisis Potensi Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Pada Sungai Air Besar Kampung Air Besar Kabupaten Fakfak La Elo, Yulianto; Rusliadi, Rusliadi; Fahrah Syahdinar, Zharin
Jurnal JEETech Vol. 4 No. 1 (2023): Nomor 1 May
Publisher : Universitas Darul Ulum

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32492/jeetech.v4i1.4102

Abstract

Fakfak Regency, West Papua Province has a Watershed and Waterfall, the Air Besar River is one of the rivers that has the opportunity to be used as a Micro Hydro Power Plant (PLTMH). Due to the large difference in flow elevation between upstream and downstream, it is hoped that this local resource can be developed for other potentials, one of which is for Micro Hydro Power Plants (PLTMH). It is hoped that this Micro Hydro Power Plant (PLTMH) will not only be able to use water as a source of energy, but also increase profits with the availability of tourism. The purpose of this research is to detect the ability of the Air Besar River as a Micro Hydro Power Plant (PLTMH). The research method used is the floating method to determine the water rate and the cross section. Furthermore, calculations are carried out to obtain the amount of water discharge, determining the effective fall height (Heff) of the flow to obtain power and energy that can be produced by river flow while account the efficiency of the generator and turbine. From the calculation results, it is known that the large water discharge from the river is 23,826 m3/s, the effective fall height (Heff) flow is 4 m. From the results of these calculations, it is known that the estimated electrical power that can be generated is 620.8159 kW.
Studi Potensi Daya Pembangkit Listrik Tenaga Mikrohidro (PLTMH) di Kampung Ubadari Kabupaten Fakfak Yulianto La Elo; Rusliadi, Rusliadi; Mokan, Muhammadon; Febriyan , Febriyan
Jurnal JEETech Vol. 4 No. 2 (2023): Nomor 2 November
Publisher : Universitas Darul Ulum

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (402.359 KB) | DOI: 10.32492/jeetech.v4i2.4205

Abstract

Fakfak Regency, West Papua Province has several rivers and waterfalls that have the potential to produce electrical energy. One of the areas in Fakfak Regency that has abundant water resource potential is Kayuni District, Fakfak Regency. So far, the use of this river and waterfall has been as a water source for villagers in Kayuni District and as one of the main tourist destinations in Fakfak Regency. Through this research, it is hoped that this resource can be developed for other potentials, one of which is for Micro Hydro Power Plants (PLTMH). Research is carried out by conducting surveys and direct measurements where the results of the measurements will be calculated to determine the potential for river flow discharge and potential for electricity generation. The results of measurements and calculations showed that the average flow of the Ubadari river was 4,674 m3/second, the effective fall height (Heff) of the flow was 4 m. With these results, it is estimated that the electrical power produced will be 111,402 kW.
Frekuensi Gangguan dan Energi Tak Tersalurkan Sebagai Indikator keandalan Sistem Jaringan Tegangan Menengah Rusliadi, Rusliadi; La Elo, Yulianto
Jurnal JEETech Vol. 5 No. 2 (2024): Nomor 2 November
Publisher : Universitas Darul Ulum

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32492/jeetech.v5i2.5208

Abstract

The increasing need for electrical energy must be balanced with improved customer service. Customers will feel comfortable if they can enjoy an uninterrupted electricity supply in the form of a disconnection of the electricity supply for a certain period of time or what is commonly called the ENS (Energy Not Supplied) index and the AENS (Average Energy Not Supplied) index. The reliability of the electric power system is one of the things that is very important in order to maintain the performance of the three main pillars of PT. PLN (Persero). A reliable distribution network can be seen from the number of disruptions that often occur in the distribution network. Disruptions that arise in the distribution network arise due to internal factors such as less reliable distribution network components. In addition, it can also be caused by external factors such as natural disasters or the influence of trees and animals. Based on the results of the research that has been conducted, it is known that the occurrence of disruptions and the length of the duration of the disruption cause the Energy Not Supplied (ENS) value to increase as in April and July, the high duration of the blackout also makes the ENS higher, namely 792.857804 kW and 789.046811 kW. However, the distribution network at the Wagom feeder is still considered reliable in distributing electrical energy based on the SAIDI and SAIFI indices. From the research results, the SAIDI index at the Wagom feeder reached 8.96 hours/customer/year. While the SAIFI index at the Wagom feeder reached 2.08 times/customer/year.
Potensi Energi PLTS Rooftop dalam Rangka Mewujudkan Efisiensi Energi di Lingkungan Politeknik Negeri Fakfak Rusliadi, Rusliadi; La ELo, Yulianto; Husnah, Nurul; Wahyudi, Riva; Lembang, Naomi; Herman HR
Jurnal JEETech Vol. 6 No. 2 (2025): Nomor 2 November
Publisher : Universitas Darul Ulum

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32492/jeetech.v6i2.6204

Abstract

Pertembuhan populasi dan kemajuan teknologi yang sangat signifikan menjadikan kebutuhan energi yang sebelumnya bergantung pada energi fosil semakin meningkat. Ketergantungan ini menyebabkan adanya kekhawatiran akan sumber daya alam yang terbatas dan juga emisi karbon yang tinggi. Oleh karena itu, diperlukan transisi energi ke energi terbarukan yang juga merupakan salah satu langkah penting untuk menjaga keberlanjutan energi nasional. Salah satu solusi yang paling potensial adalah Pembangkit Listrik tenaga Surya (PLTS) yang sumber energinya berasal dari energi matahari. Indonesia memiliki peluang lebih tinggi untuk radiasi matahari rata -rata 4,8 kWh/m² per hari. Fakta ini meningkatkan urgensi penggunaan energi matahari di daerah seperti Kabupaten Fakfak di Papua Barat. Ini juga merupakan tantangan dalam ketersediaan energi karena ketergantungannya pada jaringan listrik tradisional. Penelitian ini bertujuan untuk menganalisis secara kuantitatif potensial energi matahari sebagai pembangkit tenaga listrik serta mengebangkan system PLTS rooftop yang optimal pada lingkungan politeknik negeri fakfak. Metode yang digunakan dalam penelitian ini meliputi studi literaur, pengamatan lokasi, pengumpulan data radiasi matahari dari BMKG dan analisis konsumsi energi kampus. Penelitian ini dilengkapi dengan perangkat lunak PVSYST untuk mensimulasikan dan menetukan desain yang efisien. Hasil simulasi menunjukkan bahwa perkiraan iradiasi pertahun mencapai 2091,9 kWh dengan energi efektif yang dapat disalurkan sebesar 61.393 kWh/Tahun atau dapat mensuplai energi sebesar 170 kWh/Hari. Adapun rugi-rugi daya yang muncul akibat pengaruh suhu sebesar -10,73% dan konversi daya oleh inverter sebesar -4,62%.
Co-Authors Abdul Haris Adilla, Deane Marza aditya, Rendi ahmad yani Aina, Asri Nur Al-Farid, Laren Amir Al-Farid, Laren Amir Al-Farid Alfinda, Rudi Aminudin, Arif Aminullah, Arif Anggani, Dewi Annavi, Riski Aprianti, Rahma Ariansyah, Sepri Asiddiqqi, Hasby Ayyub, Muhammad B Hutabarat, Geral B Sianturi, Benny Buchari, Rd Achmad Candra, Andre Maryan Deni Efizon Devindra, M. Ilham DIAN LESTARI Elo, Yulianto La Eni Sumiarsih Fahrah Syahdinar, Zharin Fathi’ah , Syalaisa Amani Fatmawati, Fatmawati Febriansyah Febriansyah Febriyan , Febriyan Firmansyah, Rodhi H. R., Herman Hasriadi, Hasriadi Herfiko, Zulfa Herman HR HR, Herman Husnah, Nurul Ida Widianingsih Iskandar Putra Iswadi Amiruddin Junita, Riska Kafara, Hajija Jafar Kelkulat, Ramla La Elo, Yulianto Lembang, Desi Lembang, Naomi Lestari M P Alibasayah Lisa Legawati Lubis, Muhammad Reza Idris Manik, Retno Aprita Manurung, Fazhira Ryunisyah Masjudi, Heri Meiza, Maharanny Mestawaty As.A Mestawaty As.A Mifna, Nur Izatul Mokan, Muhammadon Morian Saspriatnadi Mulyadi Mulyadi Mutamima, Anisa Mutamima, Annisa Nainggolan, Evy Purnama Nasution , Indah Dewiana Nasution, Indah Dewiana Niken Ayu Pamukas Nur, Abidin Nurbaiti, Dinda Nurfadli, Muhammad Oktaviani , Ullia oktavianus, Petrus Padli, Khairul Pajri Ananta Yudha Pasaribu, Jeriko Prastoro, Wiko Prianto, Robi Puspita, Dian Permata Putra, Widodo Rahmini Hustim, Rahmini Ramadhani Ramadhani Renaldi, Irwan Renolafitri, Hendrini Ronal Kurniawan SAHARUDDIN, A Sahputra, Erwin Wahyu Sari, Anelia Diah Wintang sari, Chici Arum Sari, Mira Rahmita Shafiq, Muhammad Sihaloho, Ulfah Oktarida Sitanggang, Rosita Siti Aisyah Situmorang, Romaida Sodipta, Yae Lia Sohni Subaedah, Subaedah Suloi, Andi Fitra Syafrida Syafrida, Syafrida Syahroni, Desty Syamsul, Muhammad Ayyub Syaputra, Mai Liandro Pratama Syarifah Aini Syifa Rachmania Komara Tampubolon, Yohanes Hasiholan Tobing, Olaelita L Ulfa, Fadilah Nur Usman Muhammad Tang Virdina, Mita Wahyudi, Riva Windarti Windarti Yulianto La Elo Yulianto La Elo Yulindra, Ade Zahlan, Alfadita Zuqni Meldha