Claim Missing Document
Check
Articles

RANCANG BANGUN PENYINKRON SEMI AUTOMATIS GENSET DENGAN SUMBER TEGANGAN SATU FASA MENGGUNAKAN TIGA PARAMETER ARUS BOLAK BALIK Dwi Bimantara, Ardhiaz Satria; Hiendro, Ayong; -, Syaifurrahman
Journal of Electrical Engineering, Energy, and Information Technology (J3EIT) Vol 10, No 2: Juli 2022
Publisher : Faculty of Engineering, Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/j3eit.v10i2.57075

Abstract

Semakin berkembangnya teknologi era sekarang khususnya dunia ketenagalistrikan, semakin besar juga kebutuhan akan ketenaga listrik dalam kehidupan sehari-hari seperti penggunaan perangkat-perangkat elektronik, mesin- mesin industri dan masih banyak lagi. Untuk mengatasi perlu adanya inovasi- inovasi dalam bidang listrik yang bisa menopang beban lebih besar. Salah satu langkah mengatasi hal tersebut adalah dengan menghubungkan beberapa sumber tenaga listrik ke alat singkronisasi. Alat sinkronisasi merupakan alat yang dapat mendeteksi tegangan, frekuensi dan arus. Digunakan relay untuk mensinkronkan kedua sumber, sinkron terjadi jika arus beban melebih 65% dari pembatas arus dan saat peningkatan (pertambahan) beban listrik pada 1450W dengan status relay sinkron ON. Pada saat sinkron tegangan pada jala-jala dan Genset sudah sama, yaitu 220,55V, frekuensi 50,02Hz. Beban yang "ditanggung" jala-jala PLN adalah sebesar 65,91% (955,66W) sedangkan pada Genset 34,19% (494,34W). Pada saat beban listrik 2050W yang tersambung ke jala-jala listrik, jala- jala PLN menanggung 55,75% sedangkan Genset 44,25%. Pada saat beban 3050, jala-jala PLN menanggung beban 52,17% sedangkan Genset 47,83%. Dalam keadaan sinkron jala-jala PLN dan Genset dengan beban penuh 3050W dilakukan penurunan beban bertahap dan Genset "keluar" dari proses sinkron (asinkronisasi)  saat persentase beban menunjukkan angka 65,91%. Dengan demikian jala-jala PLN kembali menanggung beban sendiri.
ANALISIS KONSUMSI BAHAN BAKAR PADA PEMBANGKIT LISTRIK TENAGA UAP (PLTU) KETAPANG 2×1O MW Rizki, Tengku M; Yusuf, M. Ismail; Hiendro, Ayong; Khwee, Kho Hie; -, Yandri
Journal of Electrical Engineering, Energy, and Information Technology (J3EIT) Vol 10, No 2: Juli 2022
Publisher : Faculty of Engineering, Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/j3eit.v10i2.57053

Abstract

Energi listrik merupakan suatu faktor penunjang yang sangat penting bagi perkembangan secara menyeluruh di suatu negara bagian manapun. Hal ini menyebabkan tingginya permintaan akan energi listrik, sehingga memaksa penyedia energi listrik menggunakan pembangkit listrik dengan kapasitas besar guna menjaga kontinyuitas pelayanan. PLTU merupakan salah satu pembangkit listrik yang mengsuplay sebagian besar energi listrik ke konsumen. Produksi batubara di Indonesia sebanyak 606,71 juta ton pada tahun 2021, beberapa jenis batubara yang digunakan pada pembangkit listrik adalah jenis low rank coal dan medium rank coal dengan nilai kalori 4100 kcal/kg sampai dengan 5200 kcal/kg. Salah satu parameter yang digunakan pada suatu sistem pembangkit tenaga berbahan bakar batubara adalah specific coal consumption (SCC). Tujuan penelitian ini adalah mengetahui seberapa besar penggunaan konsumsi penggunaan bahan bakar di PLTU Ketapang 2x10 MW kemudian mengetahui jumlah bahan bakar yang digunakan setiap hari dan persentase campuran bahan bakar tersebut. Perbedaan nilai kalori bahan bakar yang digunakan berpengaruh pada konsumsi dimana semakin besar nilai kalori tinggi dapat menyebabkan konsumsi spesifik bahan bakar menurun. Penggunaan bahan bakar cofiring di PLTU Ketapang dengan kalori 4006 Kcal/Kg dan 3815 Kcal/Kg yaitu pada pembangkit unit 1 dengan daya terbesar dihasilkan dihari berbeda sebesar 10000 kW memiliki konsumsi spesifik sebesar 1305.70 kg/kWh. Sedangkan pada pembangkit unit 2 dengan daya terbesar yang dihasilkan dihari kelima sebesar 9920 kW memiliki konsumsi spesifik sebesar 128.16 kg/kWh. Pengunaan bahan bakar campuran (cofiring) pada pembangkit mampu menghemat penggunaan bahan bakar batubara dimana penggunaan cangkang sawit memiliki nilai kalori yang cukup sama dan dapat digunakan sebagai energi dari bahan organik.
PERANCANGAN OPTIMUM SISTEM PLTS PADA PUSKESMAS TERIGAS DI KABUPATEN SAMBAS Alvian, -; Khwee, Kho Hiee; Hiendro, Ayong; -, Yandri; Gani, Usman A
Journal of Electrical Engineering, Energy, and Information Technology (J3EIT) Vol 10, No 2: Juli 2022
Publisher : Faculty of Engineering, Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/j3eit.v10i2.60234

Abstract

Kabupaten Sambas yang merupakan daerah jika di lihat secara kasat mata merupakan daerah dengan intensitas matahari yang cukup tinggi dengan suhu maksimum mencapai 34ËšC dan minimum 23ËšC menjadi daerah yang potensial untuk di kembangkan sebagai alternatif pembangkit listrik terbarukan. Maka dilakukan perancangan optimum sistem PLTS pada Puskesmas Terigas menggunakan software HOMER.Membandingkan biaya energi listrik antara sistem PLTS dan PLN pada Puskesmas Terigas di Kabupaten Sambas. Pada penelitian ini menggunakan beberapa data sekunder. Data sekunder yang digunakan berasal dari beberapa sumber berbeda yang dapat dipertanggung jawabkan keaslian dan keaabsahannya. Pembangkit Listrik Tenaga Surya (PLTS) dapat memenuhi kebutuhan energi listrik yang ada di Puskesmas Terigas selama 24 jam, dengan asumsi beban sebesar 60,74 kWh/hari.energi listrik selama 1 tahun sebesar 22.170 kWh/tahun. Mengunakan perencanaan ini adalah PLTS Off grid dengan konfigurasi dari panel surya "“ inverter "“ baterai. Hasil analisis teknis untuk memenuhi kebutuhan energi listrik secara off grid yang paling optimal, menggunakan panel surya sebesar 18,8 kW, inverter sebesar 6 kW, dan baterai sebanyak 30 buah. Daya yang dapat diproduksi oleh PLTS ini sebesar 27.276 kWh per tahun. .Berdasarkan analisis ekonominya maka didapat nilai NPC sebesar Rp397.653.399,95 Annualized Cost (AC) sebesar Rp28.148.217,50 serta biaya energi yang di keluarkan oleh PLTS sebesar Rp1.269,65 / kWh. Biaya energi PLN sebesar Rp1.699,53/kWh,biaya energi PLTS sebesar Rp1.269,65 / kWh lebih rendah dibangdingkan biaya energi dari PLN.
PERANCANGAN ENERGI OPTIMUM SISTEM PLTS UNTUK BASE TRANSCEIVER STATION Ariansyah, Ahmad; Hiendro, Ayong; -, Yandri; Khwee, Kho Hie; Abidin, Zainal
Journal of Electrical Engineering, Energy, and Information Technology (J3EIT) Vol 10, No 2: Juli 2022
Publisher : Faculty of Engineering, Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/j3eit.v10i2.60671

Abstract

Kalimantan Barat merupakan daerah yang dilalui garis khatulistiwa yang mendapatkan sinar matahari dengan intensitas cahaya matahari yang tinggi dan energi ini tidak terbatas. Penerapan Pembangkit Listrik Tenaga Surya (PLTS) sebagai pemanfaatan konversi energi listrik di daerah Kalimantan Barat merupakan solusi yang tepat sebagai pelengkap kebutuhan energi Alat yang digunakan untuk menyelesaikan permasalahan pada penelitian ini menggunakan aplikasi Homer Energy Modelling. Piranti ini digunakan untuk menganalisis kombinasi terbaik dalam penggunaan energi yang tersedia untuk menyalurkan kebutuhan beban yang berada di BTS XL Pontianak Timur, Kota Pontianak.Kebutuhan untuk memenuhi energi listrik di BTS XL Pontianak Timur 24 jam sebesar 3.6 kWh/hari dan untuk energi listrik selama 1 tahun sebesar 1.313 kWh/tahun.Hasil analisis teknis untuk memenuhi kebutuhan energi listrik secara off-grid yang paling optimal, menggunakan panel surya sebesar 0,975 kW, inverter sebesar 0,275 kW, dan baterai sebanyak 6 buah. Pada konfigurasi ini panel surya dapat menyuplai energi listrik sebesar 1.482 kWh/ tahun, dengan kelebihan energi sebesar 86.2 kWh/tahun yang dapat di simpan ke dalam baterai.Hasil analisis ekonomi pada skenario off-grid, untuk skenario off-grid yang paling ekonomis adalah konfigurasi dari panel surya"“inverter"“baterai dengan biaya keseluruhan sistem selama 25 tahun (NPC) sebesar Rp 34.051.086 untuk biaya keseluruhan sistem 1 tahun (AC) sebesar Rp2.410.333 serta untuk biaya pokok produksi energi listrik (LCOE) sebesar Rp1.835 /kWh.
ANALISIS KINERJA MONITORING PROTOTIPE MODEL KWH METER SATU FASA DENGAN TEKNOLOGI KOMUNIKASI TRANSCEIVER SX 1276 Arpiandi, Muhammad Rizky; Marpaung, Jannus; Yacoub, Redi Ratiandi; Imansyah, Fitri; Hiendro, Ayong
Journal of Electrical Engineering, Energy, and Information Technology (J3EIT) Vol 10, No 2: Juli 2022
Publisher : Faculty of Engineering, Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/j3eit.v10i2.56990

Abstract

Listrik adalah salah satu kebutuhan primer manusia pada era kemajuan teknologi dan komunikasi. Hampir semua aspek kehidupan manusia menggunakan perangkat yang digerakkan dengan listrik. KWh Meter adalah alat penghitung pemakaian energi listrik yang bekerja menggunakan metode induksi medan magnet, dimana medan magnet tersebut menggerakkan piringan yang terbuat dari alumunium. Adanya teknologi transceiver SX 1276 mampu membuat pengukuran kWh meter dengan jarak jauh. Modul transceiver SX1276 memiliki kemampuan untuk berkomunikasi jarak jauh, kecepatan data yang rendah, konsumsi daya rendah, dan transmisi data yang aman. Modul transceiver SX1276 dapat digunakan pada jaringan publik, private, dan hybrid untuk mencapai jangkauan yang lebih luas daripada jaringan seluler. Karena kemampuannya modul transceiver SX1276 sangat cocok digunakan untuk memonitoring keadaan di suatu tempat dari tempat yang lain. Pada penelitian ini berhasil dirancang pengukuran kWh meter kemudian diimplementaskan dengan modul transceiver SX1276 sebagai media transmisi data monitoring kWh meter. Data dari sensor tegangan dan arus yang telah di akuisisi oleh Arduino Uno pada sistem transmitter (Tx) kemudian dikirimkan ke sistem receiver (Rx) oleh bantuan modul transceiver SX1276. Sensor tegangan mampu melakukan akuisisi data dengan akurasi 99,47% dan sensor arus mampu mengakuisisi data dengan akurasi 82,83% sampai 98,22%. Perubahan parameter-parameter transmisi transceiver SX1276 mengakibatkan perubahan pada hasil performa komunikasinya. Pada pengujian variasi Bandwidth dari 62,50 kHz, 125 kHz, 250kHz, 500kHz dengan jarak 50m nilai SNR dan   RSSI terbaik pada BW 62,50kHz. Pada pengujian variasi Coding Rate dari C/R 4/5, 4/6, 4/7, 4/8 dengan jarak pengujian 50m nilai SNR dan RSSI terbaik ada pada C/R 4/8. dan pengujian variasi Spreading Factor dari SF7, SF9, SF10, SF12 dengan pengujian jarak 50m, 100m, 150m, 200m, 250m nilai SNR dan RSSI terbaik ada pada SF 7, semakin tinggi nilai parameter SF maka area komunikasi transceiver SX1276 semakin jauh, namun akan berakibat terhadap ToA yang semakin lama.
Real-time paddy grain drying and monitoring system using long range-internet of things Hiendro, Ayong; Syaifurrahman, Syaifurrahman; Wigyarianto, F. Trias Pontia; Husin, Fitriah
International Journal of Electrical and Computer Engineering (IJECE) Vol 15, No 1: February 2025
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijece.v15i1.pp448-454

Abstract

Grain drying environmental parameters are an important issue throughout the paddy grain production process. A real-time monitoring system requires rapid, online, and accurate measurement results. In the paddy grain drying process, the heated air velocity, temperature, relative humidity, and moisture content have to be carefully monitored and maintained to ensure product quality and safety. This study aimed to propose a real-time paddy grain drying and monitoring system using a long-range internet of things (LoRa-IoT). The real-time monitoring system consisted of sensors, LoRa, and IoT platforms. The LoRa end node and gateway were utilized as a wireless radio communication platform of IoT for long-distance signal transmission. From the experiment, the gateway received data from the end node at a distance of 2 km with a time on air (ToA) of 981 ms. As a result, the proposed monitoring system succeeded in measuring and recording the heated air velocity, temperature, and relative humidity data during the paddy grain drying process from 25% moisture content down to 14%. Regarding moisture content, the accuracy of real-time monitoring information was confirmed with a direct measurement method, resulting in a root mean square error (RMSE) of 6.17%.
Penentuan Sudut Orientasi Optimum untuk Pembangkit Listrik Tenaga Surya di Universitas Tanjungpura Pontianak husin, fitriah; Hiendro, Ayong
Elektron : Jurnal Ilmiah Vol 16 No 2 (2024)
Publisher : Teknik Elektro Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/eji.16.2.515

Abstract

Pengembangan energi surya di Indonesia terus mengalami peningkatan seiring dengan upaya pemerintah dalam mencapai target nol emisi karbon pada tahun 2060. Salah satu langkah strategis dalam mendukung pencapaian tersebut adalah dengan meningkatkan efisiensi Pembangkit Listrik Tenaga Surya (PLTS). Penelitian ini berfokus pada optimalisasi produksi energi listrik di PLTS Universitas Tanjungpura melalui penentuan sudut orientasi panel surya yang paling efektif. Simulasi dilakukan menggunakan perangkat lunak PVsyst dengan variasi sudut kemiringan antara 4° hingga 15° serta delapan arah azimuth, yaitu Utara (0°), Timur Laut (-45°), Timur (-90°), Tenggara (-135°), Selatan (180°), Barat Daya (135°), Barat (90°), dan Barat Laut (45°). Hasil simulasi menunjukkan bahwa konfigurasi optimal terdapat pada sudut kemiringan 5° dengan azimuth -45° (menghadap Timur Laut), yang mampu menghasilkan produksi energi listrik tahunan sebesar 2365 MWh. Angka ini lebih tinggi dibandingkan konfigurasi awal pada sudut kemiringan 13° dan azimuth 135° (menghadap Barat Daya), yang hanya mampu menghasilkan 2308 MWh per tahun. Peningkatan produksi energi listrik sebesar 2,5% ini membuktikan bahwa optimasi sudut orientasi panel surya berperan penting dalam memaksimalkan kinerja sistem PLTS. Hasil penelitian ini tidak hanya memberikan kontribusi pada pengembangan energi terbarukan, tetapi juga mendukung strategi nasional dalam upaya penurunan emisi karbon dan transisi menuju energi bersih di Indonesia.
Solar-Wind Hybrid Power Generation System Planning In Kijing Beach, West Kalimantan Verdian, Rifqi Azzumardi; Hiendro, Ayong; Khwee, Kho Hie
Journal of Electrical Engineering, Energy, and Information Technology (J3EIT) Vol 12, No 3: December 2024
Publisher : Faculty of Engineering, Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/j3eit.v12i3.86759

Abstract

PLN finds it difficult to meet the electricity needs of the entire Indonesian population. Therefore, it is necessary to develop and optimize New Renewable Energy (EBT) such as solar energy, ocean energy, geothermal, and hydropower. This research uses secondary data that can be accounted for and uses Homer Energy Modeling software to analyze the use of available energy. This research analyzes the planning of a hybrid power plant that uses wind and solar power   to meet energy needs in Kijing Beach from an economic perspective. From the simulations conducted, the analysis results show that the configuration of solar panels "“ wind turbine- inverter - battery in the off grid system results in a total overall cost of Rp2,627,560,16.36.
Workshop Penulisan Artikel Penelitian Tindakan Kelas Bagi Guru Ruqiah Ganda Putri Panjaitan; Kiki Prio Utomo; Yuliati Indrayani; Ayong Hiendro; M. Irfani Hendri
Sasambo: Jurnal Abdimas (Journal of Community Service) Vol. 4 No. 4: November 2022
Publisher : Lembaga Penelitian dan Pemberdayaan Masyarakat (LITPAM)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36312/sasambo.v4i4.836

Abstract

Pengabdian ini dilakukan untuk memberi solusi alternatif dari persoalan yang dihadapi oleh guru yang mengalami kendala pada penulisan artikel penelitian tindakan kelas dan submit ke jurnal sebagai salah satu syarat dalam mengusulkan kenaikan pangkat. Pengabdian ini dilakukan dengan menggunakan metode workshop dan pendampingan penulisan hingga submit ke jurnal, yaitu pengabdi melakukan kegiatan bersama dengan guru mata pelajaran IPA yang tergabung dalam MGMP Kota Pontianak. Kegiatan ini dilaksanakan secara luring dan daring. Ada tujuh guru yang mengikuti secara penuh kegiatan ini. Berdasarkan rangkaian kegiatan yang telah dilakukan, guru merasa sangat terbantu dengan kegiatan yang dilakukan, terutama dengan pendampingan penulisan artikel penelitian tindakan kelas dan submit pada jurnal. Pengabdi menemukan, selama ini banyak terdapat guru-guru yang terkendala dalam melakukan penulisan artikel penelitian tindakan kelas dan sumbit pada jurnal dikarenakan kurangnya pelatihan dan pengetahuan tentang penulisan artikel serta submit pada jurnal. Setelah dilakukan workshop dan pendapingan terhadap penulisan artikel penelitian tindakan kelas dan submit pada jurnal empat guru dapat menghasilkan artikel yang ditulis sendiri dan siap submit pada jurnal. PKM Workshop on Writing Classroom Action Research Articles for Teachers This service is carried out to provide alternative solutions to problems faced by teachers who experience problems in writing classroom action research articles and submitting them to journals as one of the requirements in proposing promotions. This service is carried out using the workshop method and writing assistance to submit to journals, where the devotees carry out joint activities with science subject teachers who are members of the Pontianak City MGMP. This activity is carried out offline and online. There were seven teachers who fully participated in this activity. Based on the series of activities that have been carried out, the teacher feels very helpful with the activities carried out, especially by assisting in writing class action research articles and submitting them to journals. The service found that so far there have been many teachers who were constrained in writing class action research articles and sumbits in journals due to lack of training and knowledge about article writing and submitting to journals. After the workshop and mentoring on writing classroom action research articles and submitting them to journals, four teachers can produce articles written by themselves and ready to be submitted to journals.  
Workshop Penulisan Artikel Penelitian Tindakan Kelas Bagi Guru Putri Panjaitan, Ruqiah Ganda; Indrayani, Yuliati; Utomo, Kiki Prio; Hiendro, Ayong; Hendri, M. Irfani; Setyawati, Dina
Jurnal Pengabdian Masyarakat (ABDIRA) Vol 5, No 3 (2025): Abdira, Juli
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/abdira.v5i3.902

Abstract

The success of education is greatly influenced by the role of teachers, not only as educators but also as professionals who continuously improve their competencies through reflection and research, one of which is through Classroom Action Research (CAR). This CAR is conducted by teachers to improve the quality of learning and solve problems in the classroom. Despite its importance, many teachers still experience difficulties in writing CAR articles, mainly due to a lack of training in scientific writing. Therefore, this workshop was held to improve academic skills and encourage active participation in scientific writing. This workshop was held offline with 10 teachers. The activity included four main stages: initial planning, socialization, presentation of material by resource persons, discussion and question and answer sessions, and evaluation through post-tests and participant testimonials. The results showed that this workshop was effective in improving teachers' understanding and skills in writing CAR articles.
Co-Authors - Abdurrahim - Imamsyah - Nopryansyah - Sarjono -, Syaifurrahman -, Yandri A.A. Ketut Agung Cahyawan W Abdul Rosyid Al-Ubaedah Lubis Abdurrahim, - Abqori Aula Agus Tianto Hendri Putra Alamsyah, Tomi Alvian, - Andri Andri Ariansyah, Ahmad Arisfati Fauzi Arpiandi, Muhammad Rizky Aula, Abqori Baehaqi Burhanuddin Burhanuddin Dedi Triyanto Dedy Suryadi Dedy Suryadi Dina Setyawati Dwi Bimantara, Ardhiaz Satria F. Trias Pontia Wigyarianto Fauzi, Arisfati Fitri Imansyah Fitriah Fitriah Fitriah Husin Ginanjar, - Hartono, Rudi Hasan Ashari Oramahi Hastama, Kurnia Hendri Putra, Agus Tianto Ilmi, Muhamad Imamsyah, - Imatua Sinaga, Victor Doan Intan Putri Iqbal Arsyad Ismail Yusuf Ismail Yusuf Ismail Yusuf, Ismail Ismail, Muhammad Yusuf Ivan Sujana Jannus Marpaung Januardi, Oki Junaidi - Junaidi Junaidi Junaidi Junaidi Junaidi Junaidi Junaidi, J Kho Hie Khwee Kho Hie Khwee Kho Hie Khwee Kho Hie Khwee Kho Hiee Khwee Khwee, Kho Hiee Kiki Prio Utomo Kiki Prio Utomo Kiki Prio Utomo Kurnia Hastama M. Irfani Hendri M. Irfani Hendri M. Irwanto M. Ismail Yusuf Managam Rajagukguk Managam Rajagukguk Misli, - Mohd Hafeez Muhamad Ilmi Muhammad Reza Pahlevi Muhammad Taufiqurrahman, Muhammad Muhammad, Dustin Muhammad, Roofi Mundus, Ray Neilcy Tjahja Mooniarsih Nopryansyah, - Oki Januardi Pindra, Willy Pratama, Bayu Angga Prio Utomo, Kiki Raditya, Zeldi Rahmansyah, Agum Ray Mundus Ridwan, Muhammad Daflie Rivani, Reko Rizki Nofetra Yudi Rizki, Tengku M Rocki Mahendra Rudi Kurnianto Rudi Kurnianto Rudy Gianto Ruqiah Ganda Putri Panjaitan Ruqiah Ganda Putri Panjaitan Sanjaya, Willie Suwarno Suwarno Syafrudin Masri Syaifurrahman - Syaifurrahman Syaifurrahman Syaifurrahman Syaifurrahman Syukrillah, Muhammad Tomi Alamsyah Tri Wahyuda Trias Pontia Wigyarianto Ulwan, Nasih Usman A. Gani Utomo, Kiki Prio Verdian, Rifqi Azzumardi Victor Doan Imatua Sinaga Wibowo, Dandy Putra Wigyarianto, F. Trias Pontia Willy Pindra Yandri - Yandri Yandri Yandri, - Yohannes M Simanjuntak Yohannes M. Simanjuntak Yudi, Rizki Nofetra Yuliati Indrayani Yuliati Indrayani Yusuf, M. Ismail Yusuf, Muhammad Ismail Zainal Abidin Zainal Abidin Zatira, Alya Zeldi Raditya