Analisis Perbandingan Upah Harian dengan Borongan (Studi Kasus Proyek Peningkatan Kualitas Permukiman Kumuh Desa Lagasa) Lisman, Lisman; Sufrianto, Sufrianto; Hakiman, Hakiman; Ilham, Vickky Anggara
Sultra Civil Engineering Journal (SCiEJ) Vol 4 No 2 (2023): Sultra Civil Engineering Journal (SCiEJ)
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sciej.v4i2.528

Abstract

There are several types of wage systems in a construction project, including a time-based wage system, namely providing wages based on time for work that has been carried out by craftsmen, such as daily work. There is also a piece rate wage system, which provides wages directly based on the amount of workmanship produced by the craftsman. Contractors must be careful in providing wages to workers, so that the work is in accordance with the planned time, whether the contractor benefits or not. If the work time is less or even ineffective for the journeyman, then it is certain that the contractor will suffer losses because the resulting productivity is small. Based on the analysis for the productivity of daily workers and piece workers, the productivity of piece workers is greater than that of daily workers in the work of Improving the Quality of Lagasa Village Slum Settlements. For piece work on taluds for area A it is 62.47 m3/day, while daily work on taluds for area A is 7,809 m3/day, for work on drainage for area B it is 78.15 m^1/day while daily work on drainage for area B is 9, 77 m^1/day and for wholesale block paving work in area C it is 526.65 m^2/day while daily block paving work in area C is 65.83083 m^2/day
Studi Karakteristik Marshall Pada Campuran Lapis Aspal Beton (Laston) dengan Bahan Tambah Limbah Kain Nilon Yusnianti, Yusnianti; Sufrianto, Sufrianto; hujiyanto, hujiyanto; Syamsuddin, Syamsuddin
Sultra Civil Engineering Journal (SCiEJ) Vol 4 No 2 (2023): Sultra Civil Engineering Journal (SCiEJ)
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sciej.v4i2.530

Abstract

The use of nylon fabric waste as adding material for concrete asphalt layers can be one of the solutions, because it can reduce pollution in the environment.The level of variation in adding nylon fabric waste is 0%, 5%, 10% and 15%. Sample testing as many as 24 test specimens. . The purpose of this study is to determine the physical properties of the asphalt with the added material of the nylon fabric waste and to determine the properties of the concrete asphalt layer mixture (Laston) with the added material of the nylon fabric waste. The results of testing the addition of nylon fabric waste levels as added material to the asphalt show that the value of the physical properties of asphalt is penetration, soft point, specific gravity, flame point and fuel point and asphalt dactality meets the standard specifications of the 2018 SNI Marga. As well as the addition of nylon substitution waste a number of asphalt at 5%, 10% and 15% content can affect the nature of concrete asphalt layers (Laston). In variations of 5%, 10% and 15% density value of 2,336 gr/cm, 2,327 gr/cm, 2,343 gr/cm, stability of 1892,4 kg, 2239,0 kg, 1953,6 kg, VMA of 15,9%, 16,2%, 15,6%, VIM of 4,4%, 4,7%, 4,1%, VFB of 73,6%, 70,9%, 74,0%, melting of 3,93 mm, 3,43 mm, 3,02 mm and MQ of 480,1 kg/mm, 652,9 kg/mm, 691,5 kg/mm.
Analisis Pengaruh Peningkatan Jalan Lingkar Kota kendari Terhadap Nilai Jual Lahan (Study pada ruas jalan bts kota Kendari dan Kab Konawe Selatan) Hujiyanto, Hujiyanto; Lakawa, Irwan; Sufrianto, Sufrianto; Muhsar, Muhammad
Sultra Civil Engineering Journal (SCiEJ) Vol 5 No 1 (2024): Sultra Civil Engineering Journal (SCiEJ)
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sciej.v5i1.578

Abstract

ABSTRAK Pembangunan/Peningkatan prasarana infrastruktur akan memberi dampak pada berbagai hal yang terkait dengan infrastruktur tersebut. Pemerintah Kota Kendari saat ini sedang membangun Jalan Lingkar Kota Kendari yang dilaksanakan secara bertahap (multy year). Dimana pembangunan itu berupa peningkatan jalan yang sudah ada (jalan kolektor) atau pun membangun pada lahan baru. Adanya pembangunan jalan lingkar tersebut secara langsung akan berdampak pada kenaikan harga lahan pada lokasi yang dilakukan pembangunan/peningkatan jalan. Penelitian ini bertujuan untuk mengetahui harga lahan dari sebelum dilakukan pembangunan dan harga lahan pada saat ini. Penelitian ini adalah penelitian Non-eksperimental yang sifatnya deskriptif, yaitu memberikan gambaran terhadap kondisi objek penelitian sebagaimana adanya. Jenis studi dilakukan dengan wawancara dan survey melalui kuesioner kepada responden, kemudian dilakukan analisis untuk menghasilkan suatu kesimpulan berdasarkan data yang ada. Terjadi perubahan harga lahan yang signifikan dari sebelum dibangun jalan lingkar dan harga saat ini. Terjadi kenaikan harga lahan dari tahu 2008 sampai dengan 2015 sebesar 220% dan tahun 2008 – 2023 kenaikan sebesar 210%. Factor Variabel jarak, luas dan lebar jalan berpengaruh signifikan terhadap kenaikan harga lahan. Model Persamaaan perhitungan nilai jual lahan adalah Y = -270683,63 – 2834,15X1 + 3198,80 X2 + 130532,85X3 Kata kunci : harga lahan; Pengaruh; Peningkatan
Analisis Kelayakan Kualitas Material Batu Pecah Dan Pasir Asal Kelurahan Wandoka Kecamatan Wangi-Wangi Kabupaten Wakatobi Sebagai Bahan Konstruksi Gedung Muhsar, Muhammad; Sufrianto, Sufrianto; Hakiman, Hakiman; Hado, Hado
Sultra Civil Engineering Journal (SCiEJ) Vol 5 No 1 (2024): Sultra Civil Engineering Journal (SCiEJ)
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sciej.v5i1.592

Abstract

Concrete is a construction material consisting of cement, fine aggregate, coarse aggregate which is mixed and added with sufficient water to form a dough which then hardens into hard concrete. This study aims to determine technical feasibility, the cost and the difference to the unit price based on the 2021 Regent's Regulation and to analyze the unit cost of construction of local Wakatobi materials and materials outside Wakatobi based on Analisa Harga Satuan Pekerjaan (AHSP). The method used in this study to determine the compressive strength of concrete refers to SNI 1974; 2011 and carried out observations and measurements in the laboratory with 60 specimens in the form of a cylinder with a diameter of 10 cm and a height of 20 cm with a concrete age of 28 days for each mixture variation. The results of the study obtained the compressive strength of aggregate variations on 100% Moramo coarse aggregate on crushed stone and sand with several variations. Comparison of the unit price of the Wakatobi local fine aggregate material with the outer Wakatobi fine aggregate material is 32.40% higher, the Wakatobi local coarse aggregate material unit price and the outer Wakatobi coarse aggregate material unit price is 52.17% higher. The construction unit cost for making 1 m3 of concrete using local Wakatobi materials is Rp. 1,916,756, and the construction unit cost for making 1m3 of concrete using non-wakatobi materials is Rp. 2,678,889. With a large construction unit, making 1m3 of concrete using external Wakatobi materials is 28.45% higher.
Pemilihan Moda Transportasi Udara Terhadap Frekuensi Penggunaan Transportasi Udara Bandara Matahora Sufrianto, Sufrianto; Sudardjat, Catrin; Aris Munandar, Fikri; Akbar, Ade
Sultra Civil Engineering Journal (SCiEJ) Vol 5 No 1 (2024): Sultra Civil Engineering Journal (SCiEJ)
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sciej.v5i1.599

Abstract

This research aimed to determine the characteristics of users of transportation modes and to find out the frequency of using air transportation at Matahora Airport. The research method used was quantitative with a descriptive approach, which involved depicting and explaining in detail the issues studied based on the data collected in the field. The data collection technique in this research used a questionnaire, where respondents were asked to answer a number of questions about the characteristics and factors influencing the choice of air transportation. Data analysis was conducted using descriptive data analysis to explain the data obtained through a questionnaire. The research results indicated that the characteristics of mode selection for transportation were based on reasons influencing the selection of modes from a total of 60 respondents. The analysis of the characteristics of air passenger travelers showed the largest percentage in the male gender at 68%, age between 36-45 years at 41%, the highest education level being a bachelor's degree at 62%, self-employed occupation at 36%, the reason for using air transportation being faster travel time at 93%, and the influence of mode selection on the frequency of air transportation use simultaneously at 33.4%. Partially, the factors influencing the choice of air transportation mode on frequency were cost at 26.1%, security at 12.1%, and comfort at 9.1%.
Kinerja Waktu Pelaksanaan Proyek Pekerjaan Jalan Di Kabupaten Kolaka Utara (Studi Kasus Jalan Poros Lasusua Desa Totallang) Sufrianto, Sufrianto; Ilham, Vickky Anggara; Makkawaru, Andi; Ilahi, La Ode Altakdir
Sultra Civil Engineering Journal (SCiEJ) Vol 5 No 2 (2024): Sultra Civil Engineering Journal (SCiEJ)
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sciej.v5i2.696

Abstract

The aim of the research is to find out or predict how much a project will cost during implementation and to find out the effectiveness of project control using the Earned Value Method. To overcome existing problems, an Earned Value method is used. There are two parameters or indicators used for analysis, namely BCWS, BCWP. Delay deviations can be identified by looking at the Schedule Variance (SV). This method can also be used to determine the efficiency of resource use in the form of the schedule performance index (SPI). The project implementation time aspect has a negative value up to the 12 th week of (SV) -Rp. 44,776,771.84 or schedule performance index (SPI) = 0.82 < 1. The calculation results are obtained from an effectiveness value of 0.85 for controlling project time using the Method Earned Value. In other words, the results of an effectiveness value that is smaller than 1 (one) can be said to be that the Time Performance for the Implementation of the Concrete Pavement Road Work Project in North Kolaka Regency is less effective. From the results of the time performance study using the Earned Value Method, it can be concluded that the Time Performance for the Implementation of the Concrete Pavement Road Work Project in North Kolaka Regency experienced a delay from the initial plan. It is clear that in weeks 1 to 12 the project performance was delayed from the planned schedule
PENGARUH PEMBERIAN INSENTIF TERHADAP KINERJA KARYAWAN PADA RUMAH PRODUKSI GULA MERAH DI DESA TIRTAMARTANI KECAMATAN ANDOOLO UTAMA KABUPATEN KONAWE SELATAN Manan, La ode Abdul; Sahyunu, Sahyunu; Sufrianto, Sufrianto; Gusriatni Sari, Dwi Inka
Sultra Journal of Economic and Business Vol 4 No 2 (2023): Edisi Oktober 2023
Publisher : Fakultas Ekonomi Dan Bisnis Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sjeb.v4i2.513

Abstract

Penelitian ini bertujuan untuk mengetahui apakah pemberian insentif dapat mempengaruhi kinerja karyawan pada rumah produksi gula merah di Desa Tirtamartani Kecamatan Andoolo Utama Kabupaten Konawe Selatan. Jenis penelitian yang dilakukan penelitian kuantitatif. Metode pengumpulan data melalui Kuesioner, Observasi, Wawancara dan Dokumentasi. Sedangkan Teknik pengolahan dan analisis data yang digunakan adalah Analisis Deskriptif, Regresi Linear Sederhana, Uji Parsial (uji t), Koefisien Korelasi, dan Koefisien Determinasi (R2). Adapun jenis dari sumber data penelitian ini yaitu data primer data yang diperoleh langsung dari sumber atau dimana tempat penelitian dilakukan. Populasi dari penelitian ini adalah seluruh karyawan pada rumah produksi gula merah di Desa Tirtamartani Kecamatan Andoolo Utama Kabupaten Konawe Selatan yang berjumlah 31 orang. Penentuan sampel yang dilakukan adalah sampling jenuh (sensus). Data yang diperoleh dengan menggunakan bantuan SPSS versi 29. Berdasarkan hasil penelitian yang dilakukan di rumah produksi gula merah di Desa Tirtamartani Kecamatan Andoolo Utama Kabupaten Konawe Selatan bahwa pemberian insentif tidak berpengaruh secara signifikan terhadap kinerja karyawan. Hal ini dapat dilihat dari hasil perhitungan statistic melalui pengujian hipotesis secara parsial yang menunjukkan bahwa thitung < ttabel maka Ho diterima Ha ditolak.
ANALISIS DAMPAK PENDAPATAN ASLI DERAH TERHAAP KINERJA KEUANGAN PADA PEMERINTAH KOTA KENDARI Manan, La ode Abdul; Suharlian, Suharlian; Sufrianto, Sufrianto; Septiani, Septiani
Sultra Journal of Economic and Business Vol 5 No 1 (2024): Edisi April 2024
Publisher : Fakultas Ekonomi Dan Bisnis Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sjeb.v5i1.587

Abstract

Analisis Dampak Pendapatan Asli Daerah Terhadap Kinerja Keuangan Pada Pemerintah Kota Kendari. Penelitian ini bertujuan untuk mengetahui bagaimana dampak Pendapatan Asli Daerah (PAD) terhadap kinerja keuangan pada Pemerintah Kota Kendari. Penelitian ini merupakan penelitian deskriptif statistik. Sumber data adalah data sekunder. Metode analisis yang digunakan adalah analisis kuantitatif dengan model regresi linear sederhana dengan menggunakan SPSS Versi 26 For Windows. Hasil penelitian ini menunjukan bahwa Pendapatan Asli Daerah mempunyai dampak positif terhadap kinerja keuangan. Berdasarkan hasil Uji t pada penelitian ini dampak PAD terhadap Kinerja Keuangan dengan nilai signifikan 0,000 > 0.05.
Bimbingan Teknis Pengolahan Air Limbah Menggunakan Batang Bambu Di Kelurahan Bende Kota Kendari Lakawa, Irwan; Sufrianto, Sufrianto; Hakiman, Hakiman
Sultra Jurnal Pengabdian Masyarakat Vol 1 No 1 (2024): Sultra Jurnal Pengabdian Masyarakat
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sjpm.v1i1.641

Abstract

Tujuan Kegiatan Pengabdian Pada Masyarakat ini adalah untuk Untuk memberikan pemahaman kepada masyarakat terhadap kebersihan dan kesehatan khususnya dilingkungan tempat tinggalnya dan menjelaskan kepada masyarakat tentang beberapa metode atau teknologi tepat guna untuk pengolahan air limbah dengan menggunakan batang bambu. Beberapa materi penting yang di sampaikan dalam Kegiatan Pengabdian Pada Masyarakat ini yaitu dampak buangan air limbah terhadap kesehatan masyarakat di Kelurahan Bende Kecamatan Kadia Kota Kendari. Dalam kegiatan ini juga diajarkan kepada masyarakat tentang tata cara pengolahan air limbah dengan menggunakan batang bambu. Metode yang digunakan dalam kegiatan ini adalah metode ceramah dan diskusi serta penjelasan teknis terhadap detail gambar kerja dan dilanjutkan dengan diskusi dan tanya jawab dengan masyarakat. Hasil yang diperoleh dari kegiatan ini menunjukkan bahwa masyarakat di Kelurahan Bende Kecamatan Kadia Kota Kendari memiliki respon yang cukup baik terhadap kegiatan Pengabdian Pada Masyarakat oleh Tim Tenaga pengajar (Dosen) Fakultas Teknik Universitas Sulawesi Tenggara ini, dan diharapkan adanya kegiatan- kegiatan sejenis lainnya yang dapat memberikan pengetahuan dan pemahaman kepada seluruh masyarakat terhadap penerapan Ilmu Pengetahuan dan Teknologi Tepat Guna lainnya.
Bimbingan Teknis Pembuatan Desain Prasarana Sederhana di Desa Masagena Kecamatan Konda Kabupaten Konawe Selatan Lakawa, Irwan; Sufrianto, Sufrianto
Sultra Jurnal Pengabdian Masyarakat Vol 1 No 1 (2024): Sultra Jurnal Pengabdian Masyarakat
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sjpm.v1i1.642

Abstract

Tujuan Kegiatan Pengabdian Pada Masyarakat ini adalah untuk memberikan pembimbingan cara membuatan desain prasarana sederhana di desa sekaligus pembuata Rencana Anggara Biaya (RAB). Metode yang digunakan dalam kegiatan ini adalah metode ceramah dan diskusi serta penjelasan teknis terhadap detail gambar kerja dan RAB, dilanjutkan dengan diskusi dan tanya jawab dengan masyarakat. Tujuannya agar masyarakat di desa memahami cara membuat gambar sederhana dari beberapa prasarana yang sering dijumpai di desa. Selain itu, masyarakat juga diberikan pembelajaran cara menghitung koefisien RAB serta administrasi proyek. Hasil yang diperoleh dari kegiatan ini menunjukkan bahwa masyarakat di Desa Masagena Kecamatan Konda Kabupaten Konawe Selatan memiliki respon yang cukup baik terhadap kegiatan Pengabdian Pada Masyarakat oleh Tim Dosen Fakultas Teknik Universitas Sulawesi Tenggara, dan diharapkan adanya kegiatan-kegiatan sejenis lainnya yang dapat memberikan pengetahuan dan pemahaman kepada seluruh masyarakat terhadap penerapan Ilmu Pengetahuan khususnya di bidang ketekniksipilan