Claim Missing Document
Check
Articles

Found 26 Documents
Search

PERBANDINGAN ANTARA SRPMK DAN SISTEM GANDA PADA GEDUNG RUMAH SAKIT GIGI MULUT UNIVERSITAS UDAYANA angganawibawa I Gusti; I Putu Ellsa Sarassantika; Ida Ayu Cri Vinantya Laksmi; I Wayan Gde Erick Triswandana; I Putu Deny Surastika Aditama
Jurnal Rekayasa Teknik Sipil dan Lingkungan - CENTECH Vol. 5 No. 2 (2024): Jurnal Rekayasa Teknik Sipil dan Lingkungan, Oktober 2024, ISSN 2722-0230 (Onli
Publisher : UKI Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33541/cen.v5i2.6100

Abstract

Bali is one of the provinces that are destinations for foreign and domestic tourists. This causes Bali to follow developments in several sectors, one of which is the construction sector. Of course, every building in Bali must guarantee its safety and comfort. Especially in infrastructure buildings, the security of which must be guaranteed because it involves the safety of many people inside. For example, hospital buildings included in risk category IV need to pay attention to their deviations. For example, in the Udayana University oral dental hospital building which was previously planned using SRPMK, the design deviation value met the requirements or did not exceed the permit deviation. This oral dental hospital building will be re-planned using a dual system. So these two structural systems are chosen for comparison regarding the deviation values ​​between the two to provide information regarding which structural system is more optimal. In this writing, the analysis shows that the deviation value produced by the dual system is smaller than the special moment resisting frame system. Namely, with a maximum value of the double system of 8.96 mm and SRPMK with a maximum value of 21.696 mm with a clearance of 30.77 mm on the 2nd floor in the x direction and in the Y direction the maximum value of the double system is 12.60mm and SRPMK with the The maximum value is 20.07 mm with a permit of 26.92 mm on the 3rd floor.
Cost Analysis of Project Planning for the G2 Building Structure Construction at Warmadewa University Using the Building Information Modeling (BIM) Method Nodya Dharmastika; Ida Ayu Cri Vinantya Laksmi; Made Mas Surya Wiguna; Putu Gede Suranata
Jurnal Rekayasa Teknik Sipil dan Lingkungan - CENTECH Vol. 6 No. 1 (2025): Jurnal Rekayasa Teknik Sipil dan Lingkungan, April 2025, ISSN 2722-0230 (Online
Publisher : UKI Press

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Cost planning is a crucial aspect of construction project execution to ensure budget efficiency and project success. This study aims to analyze the cost planning for the construction of the G2 Building structure at Warmadewa University using the Building Information Modeling (BIM) method. BIM is employed as the primary tool to generate a 3D model integrated with accurate and efficient cost estimation (quantity take-off). The study begins by collecting initial project design data, technical specifications, and a conventional budget plan (BOQ). Subsequently, this data is implemented in BIM software to create a 3D model of the building structure. This model is used to conduct quantity analysis and cost estimation based on the work volume automatically generated by BIM. The results show that the BIM method produces a cost planning estimate of IDR 13,622,950,957, while the conventional method estimates IDR 14,648,621,255, resulting in a difference of IDR 1,025,670,298 or 7%. Keywords: Building Information Modeling (BIM); cost planning; cost estimation
REDESAIN STRUKTUR GEDUNG 5 LANTAI FAKULTAS TEKNIK UNIVERSITAS WARMADEWA BERBASIS SISTEM KOMPOSIT Ida Ayu Cri Vinantya Laksmi
Jurnal Kajian Teknik Sipil Vol 11, No 1 (2026): JURNAL KAJIAN TEKNIK SIPIL
Publisher : Universitas 17 Agustus 1945 Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52447/jkts.v11i1.9382

Abstract

Perkembangan teknologi konstruksi menuntut sistem struktur yang lebih efisien, kuat, dan ekonomis. Struktur komposit yang menggabungkan elemen baja dan beton merupakan salah satu alternatif yang dapat meningkatkan kinerja struktur dibandingkan sistem beton bertulang konvensional. Gedung G2 Fakultas Teknik dan Perencanaan Universitas Warmadewa yang semula direncanakan menggunakan beton bertulang kemudian dianalisis kembali dengan sistem struktur komposit. Permasalahan dalam penelitian ini adalah bagaimana merencanakan ulang struktur gedung menggunakan sistem komposit serta membandingkan kinerja struktur terhadap simpangan antar lantai dengan struktur beton bertulang eksisting. Metode yang digunakan meliputi pengumpulan data gambar dan data tanah, perencanaan pembebanan sesuai standar SNI, pemodelan struktur menggunakan perangkat lunak ETABS v.21, serta perencanaan elemen struktur komposit yang meliputi pelat lantai dengan deck baja bergelombang, balok baja IWF, kolom komposit, sambungan, dan pondasi tiang pancang. Hasil analisis menunjukkan bahwa struktur komposit memiliki kinerja yang lebih baik dibandingkan struktur beton bertulang eksisting. Nilai simpangan maksimum struktur komposit sebesar 30,176 mm pada arah X dan 25,334 mm pada arah Y, sedangkan struktur beton bertulang eksisting mencapai 35,649 mm pada arah X dan 32,866 mm pada arah Y. Hal ini menunjukkan bahwa sistem struktur komposit lebih efektif dalam meningkatkan kekakuan dan mengurangi simpangan bangunan.
Cash Flow Analysis for Financial Control in the SDN 6 Kuta Building Construction Project I Gede Wahyu Adi Putra; Ida Ayu Cri Vinantya Laksmi; Kadek Windy Candrayana
Jurnal Ilmiah Telsinas Vol 9 No 1 (2026)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/telsinas.v9i1.7492

Abstract

The construction industry plays a significant role. Construction projects carry a high level of risk, particularly in financial management and in balancing cash flow between revenue and expenditure. This study aims to analyze cash flow and evaluate the financial condition of the SDN 6 Kuta building construction project based on the schedule. The method used is descriptive quantitative, utilizing secondary data in the form of the Implementation Budget Plan, time schedule, and project progress reports. The results indicate that the project's Implementation Budget Plan Rp 1,975,413,914, with a payment system in installments and a 10% down payment. An analysis of the existing cash flow indicates a cash flow imbalance. In some periods, particularly until the middle of the project, cash outflows exceeded cash inflows, resulting in a deficit (overdraft), requiring the contractor to use personal funds to maintain the project. The implementation of alternative policies, such as increasing the down payment to 25% and adding additional funding sources, resulted in a more stable cash flow pattern, with cash receipts tending to exceed expenditures for most of the project period. Although the profit under the existing policy is higher at 12.58% compared to the alternative policy at 9.45%, the alternative policy is considered more optimal because it reduces the risk of overdrafts and improves the project's financial stability. Therefore, proper cash flow management through adjustments to payment systems and funding strategies significantly impacts the success of construction projects, not only in terms of profitability but also in terms of liquidity and project sustainability.
Pendampingan Pembuatan Sabun Natural sebagai Suvenir Khas Desa Wisata Ekologi (DWE) Nyambu komang ayu agustini; Ida Ayu Cri Vinantya Laksmi; Dewa Ayu Dyah Pertiwi
Jurnal ABDIRAJA Vol 9 No 2 (2026): Jurnal Abdiraja
Publisher : LPPM Universitas Wiraraja Sumenep, Jalan Raya Sumenep Pamekasan KM. 5 Patean Sumenep 69451, Telp. (0328) 673399 Fax. (0328) 673088

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24929/adr.v9i2.5215

Abstract

Desa Nyambu memiliki potensi sumber daya alam yang besar, terutama hamparan sawah yang luas serta sumber air yang melimpah. Aktivitas wisata yang dilakukan di Desa Nyambu seperti bersepeda (cycling), trekking, serta pengenalan budaya. Kategori sebuah desa wisata yaitu memiliki konsep something to see, something to do, dan something to buy. Namun, permasalahan saat ini di Desa Nyambu adalah belum memiliki suvenir khas yang dapat dibeli dan menjadi ciri khas desa. Sabun natural dapat menjadi branding ekowisata di Desa Nyambu dengan memanfaatkan bahan-bahan alami yang ada di sekitar desa. Pengabdian ini menggunakan metode partisipatif, yaitu pelatihan dan pendampingan pembuatan sabun natural khas desa. Tahapan pengabdian terdiri dari identifikasi permasalahan dan solusi, FGD, pelatihan dan pendampingan, serta evaluasi. Sebanyak 12 anggota pokdarwis mengikuti kegiatan ini, di mana 87,5% di antaranya belum pernah mengikuti pelatihan sabun natural. Evaluasi dilakukan melalui pengisian kuesioner sebelum dan setelah pelatihan. Hasil pengabdian ini menunjukkan 87,5% peserta merasa mampu membuat sabun natural secara mandiri, di mana 57,1 % di antaranya merasa siap menjelaskan pembuatan sabun natural kepada wisatawan.
Analisis perbandingan limbah batu hitam sanggah dengan agregat 1-2 cm ex. Karangasem pada penerapan hardscape infrastruktur hijau I Nyoman Dinton Vicky Budi Laksana; Ida Ayu Cri Vinantya Laksmi; Ni Made Diah Ayu Kendran
Jurnal Arsitektur Lansekap Vol.12, No.2, Oktober 2026
Publisher : Prodi Arsitektur Lanskap, Fakultas Pertanian, Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/JAL.2026.v12.i02.p03

Abstract

The growing demand for infrastructure development—particularly regarding the application of hardscape concepts within green infrastructure—necessitates innovation in the selection of eco-friendly construction materials. Hardscape refers to the non-vegetative elements of a landscape, such as walkways, paving blocks, and aesthetic features, which play a crucial role in creating sustainable open spaces. A key challenge in implementing green infrastructure is the use of materials with a low carbon footprint. Test results conducted in accordance with the SNI 1969:2016 standard revealed that "sanggah" (traditional shrine) waste stone aggregate (size 1–2) had an average specific gravity of 1.914 and an absorption rate of 8.128%, whereas Karangasem aggregate (size 1–2) showed an average specific gravity of 2.567 and an absorption rate of 2.094%. This study aims to demonstrate the viability of using "sanggah" waste stone aggregate as a substitute material in green infrastructure applications—such as rainwater management optimization, urban heat island mitigation, and the filtration layers of rooftop gardens. A quantitative research method with an experimental approach was employed to analyze the samples; primary data derived from laboratory testing underwent descriptive processing. The use of materials characterized by low specific gravity (lightweight) and high absorption (porous nature) is fundamental to green infrastructure efficiency, as this combination offers significant technical and ecological advantages in both rainwater management and construction