Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Retensi

REVITALISASI BANGUNAN BALAI PERTEMUAN MENJADI GEDUNG OLAHRAGA BULUTANGKIS DIKABUPATEN KAPUAS HULU: REVITALISASI BANGUNAN BALAI PERTEMUAN MENJADI GEDUNG OLAHRAGA BULUTANGKIS DIKABUPATEN KAPUAS HULU Aji, Egi Setia; Syafriadi, syafriadi; muhtadi, ahmad
RETENSI Vol. 2 No. 2 (2022): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v2i2.476

Abstract

The Kapuas Hulu District Government established a Meeting Hall Building in North Putussibau District, BecauseNorth Putussibau District is the capital of Kapuas Hulu District, the Kapuas Hulu District Meeting Hall building beganconstruction in 2009 and was completed in 2010. The meeting hall building is usually used for events. weddings,traditional gatherings and so on. The Meeting Hall building since it was completed in 2010, has not been used at all,because the building has land ownership problems between local residents and the government, so the building isabandoned. This meeting hall building has a building area of 2,220 m2, the current condition of the building is verypoor, starting from the cracked walls of the building, the broken glass of the building and the roof of the building thatleaks in several places, causing the ceiling of the building to collapse.The purpose of this study is to be able to identifythe damage to the building of the Kapauas Hulu Regency Meeting Hall, to be able to plan the meeting hall buildingto become a badminton sports building and to be able to plan the building according to SNI 03-1733-2004 concerningresidential and urban environmental planning. The formulation of the problem in writing this report is How toRevitalize the Meeting Hall Building in Kapuas Hulu Regency, therefore the author tries to revitalize the Kapuas HuluRegency meeting hall building.The methods used in solving this problem are qualitative methods and quantitativemethods. The qualitative method is subjective in nature, the research conducts direct interactions with the object understudy.From the results of the Revitalization of the Meeting Hall Building into a Badminton Sports Building, it can beconcluded that the Kapuas Hulu district meeting hall building is very suitable to be used as a badminton sportsbuilding, seen from several aspects such as building area, area and population. Based on the results of the revitalizationof this building, it has several advantages, in terms of architecture, planning of parking lots and parks. This buildingis also designed to follow the standards for the badminton court, starting from the height of the building and thebuilding area.
PERENCANAAN MANAJEMEN PROYEK KONSTRUKSI PEMBANGUNAN GEDUNG PARKIR KEPOLISIAN RESORT KOTA SINGKAWANG: PERENCANAAN MANAJEMEN PROYEK KONSTRUKSI PEMBANGUNAN GEDUNG PARKIR KEPOLISIAN RESORT KOTA SINGKAWANG Aulia, Rahayu; Syafriadi, syafriadi; Iswani, Shilvi
RETENSI Vol. 3 No. 2 (2023): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v3i2.657

Abstract

Construction Project Management plays an important role in the construction of a building from the beginning of the building until finally the building is ready for occupancy. The parking building is one of the facilities provived by the Singkawang City police resort which aims to accommodate motorized vehicles effectively and efficiently within the Singkawang City police resort. To realize this development, careful planning is needed, so as not to cause problems that harm various parties, in order to create effective and efficient planning, Construction Project Management is the right solution asa a solution to this problem. The results of this plan aim to build a parking building at the Singkawang City police resort. In this paper, present calculations and estimates of costs, time, human resouces, occupational safety and health and quality management systems to support the planning process of building parking facilities in Singkawang City police resort environment.
PERANCANGAN MANAJEMEN STRUKTUR PADA BANGUNAN GEDUNG 5 LANTAI SEKOLAH SD/SMP KRISTEN IMMANUEL KABUPATEN KUBU RAYA Syahwalitya Fahdila, Sucy; Eka Pratami, safitri; Syafriadi, syafriadi; Purnama, Ikhwan Arief
RETENSI Vol. 4 No. 2 (2024): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v4i1.765

Abstract

Improving school building facilities and infrastructure is very necessary because of the rapid development in the world of education. Building planning is very influential because it will produce a building that meets the requirements of being sturdy, economical and aesthetic in order to avoid damage to the building. Construction management is a very appropriate solution for planning the needs of cost, quality, time, and human resources as well as Occupational Safety and Health (K3). In planning the management of the Immanuel Elementary/Junior High School Building, Kubu Raya Regency, an analysis of the working drawings used as the object of management planning is carried out first. So that a job description is obtained from the work drawing to analyze cost management, quality management, time management by making a Network Planning using the Critical Path Method (CPM), human resource management, and occupational health safety management. In this write, the author uses data sources in the form of primary data and secondary data. Primary data is in the form of working drawings and field documentation, while secondary data is in the form of 2020 Unit Price Analysis (AHS), work plans and requirements (RKS), laws/government regulations, and literature. Based on the processed data, the final results include the Draft Budget (RAB) of Rp. 13,751,000,000 , the duration of the work is 228 days, project quality management is made an analysis of the quantity of work in which there are specifications for each job in detail and in accordance with existing guidelines and in accordance with standards, Human Resources (HR) results in the highest number of workers a lot for reinforcement work as many as 88 people and at least on the work of installing bolts and anchors, installing 12mm plates and installing 16mm plates on the roof as many as 2 people. Occupational Health and Safety (K3) is the result of risk control and the need for personal protective equipment that is in accordance with standards and needs.