Claim Missing Document
Check
Articles

Kebutuhan Alat Teknis Reklamasi PIT 3 Selatan PT. Wijaya Mandiri Energi di Kabupaten Paser, Kalimantan Timur Galih Handhika; Henny Magdalena; Lucia Litha Respati
Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan Vol. 2 No. 3 (2024): Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/globe.v2i3.402

Abstract

Reclamation is an activity carried out throughout the stages of the mining business to organize, restore, and improve the quality of the environment and ecosystem so that it can function again according to its designation (Law No. 3 of 2020). In PT Wijaya Mandiri Energi's mining activities that have been completed, the required activity is to carry out reclamation. In planning reclamation activities, technical reclamation tools are needed. Therefore, in this study, calculations were carried out to determine the number of technical equipment requirements used in reclamation activities that will be carried out in pit 3 south. Based on observations of mining activities carried out in pit 3 south, data is obtained in the form of productivity values of digging-loading equipment, transport equipment and displacement equipment. In this research, the quantitative analysis method is used by calculating the value of the area, productivity and actual working hours so as to obtain the value of the need for digging tools, transport tools and displacement tools needed in reclamation activities to achieve optimal value. As for the research conducted with an area of 5.95Ha and a production target of 208,250 m3, with the productivity of Doosan 500LCV excavator equipment of 218.64 m3 / hour, dump truck of 58.84 m3 / hour and SEM 822D bulldozer of 351.64 m3 / hour, the number of excavator Doosan 500LCV digging and loading equipment is 2 units, Beiben 2642 dump truck of 8 units and SEM 822D bulldozer of 2 units.
Optimalisasi Penggunaan Fly Ash Untuk Reduksi Kadar Besi (Fe) Dan Mangan (Mn) Serta Peningkatan pH Dalam Air Asam Tambang Rofi Taufiqurrahman; Shalaho Dina Devy; Windhu Nugroho; Agus Winarno; Henny Magdalena
Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri Vol. 2 No. 3 (2024): September : Manufaktur : Publikasi Sub Rumpun Ilmu Keteknikan Industri
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/manufaktur.v2i3.470

Abstract

Coal mining activities often result in acid mine drainage (AMD), which can cause environmental pollution if not properly managed. This study aims to evaluate the potential use of fly ash from the Stream Power Plant (PLTU) Tenggarong to mitigate the impacts of AMD, specifically targeting iron (Fe), manganese (Mn), and pH parameters. Acid Mine drainage is formed when sulfide minerals oxidize, producing acidic compounds that can harm the environment. This research focuses on analyzing the ability of fly ash to adsorb iron and manganese from AMD solutions, as well its capability to increase solution pH. Based on the conducted research, the optimum pH value was achieved when using 10 grams and 15 grams of fly ash in the adsorption process. The optimum concentration of iron (Fe) was attained using 10 grams to 15 grams of fly ash, while for manganese (Mn), it was achieved with 20 grams to 25 grams of fly ash. The adsorption process using 25 grams of fly ash showed the highest efficiency in reducing iron (Fe) concentration by 93.78 % and manganese (Mn) concentration by 75.47 %.
Deashing Batubara Dengan Metode Leaching Menggunakan NaOH Dan HCL Di PT Bukit Baiduri Energi, Kabupaten Kutai Kartanegara, Kalimantan Timur Saskiyah Saskiyah; Harjuni Hasan; Henny Magdalena
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 4 (2024): Agustus : Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i4.412

Abstract

Coal is one of the energy sources that is the basis for meeting energy and electricity needs in various countries, including Indonesia. Coal obtained from mining contains impurities, which can occur during coalification or during the mining process. There are impurities elements found in coal such as sulfur, ash and various other minerals found in coal. The sampling location was carried out at the mining location at PT Bukit Baiduri Energi, Kutai Kartanegara Regency, East Kalimantan Province. The solutions used in the deashing process using the leaching method are NaOH and HCl.
Studi Perhitungan Biaya Pada Kegiatan Pengupasan Overburden Pada PIT 5 PT. Indochin Resources Jobsite PT. Energi Cahaya Industritama: Cost Calculation Study On Overburden Removal Activities At Pit 5 Pt. Indochin Resources Jobsite Pt. Industritama Light Energy Hikmawati; Magdalena, Henny; Nugroho, Windhu; Hasan, Harjuni; Respati, Lucia Litha
Jurnal Pengetahuan dan Pendidikan Vol 2 No 3 (2023): Journal of Media, Sciences and Education
Publisher : Yayasan Baru Haji Samsudin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36312/jomet.v2i3.38

Abstract

During the stripping and hauling of overburden, there are several things that affect this activity, namely the productivity of the equipment, working front conditions, loading methods, and working hours. Before carrying out mining activities, it is necessary to calculate a budget, the aim is to provide an overview of the costs to be incurred by the company for mining activities. The results of research that has been carried out for one month shows that the productivity of the tools used for stripping overburden is obtained as follows. The productivity of the Sany SY365H PRO excavator in fleet 1 was 221.13 bcm/hour and the productivity of the Sany SY365H PRO excavator in fleet 2 was 226.11 bcm/hour. And the productivity of the DT SYZ322C-8S conveyance in Fleet 1 is 37.37 bcm/hour and the productivity of the DT SYZ322C-8S conveyance in Fleet 2 is 37.38 bcm/hour. The costs that must be incurred for the tools used in overburden stripping activities are obtained as follows. The ownership cost of the Sany SY365H PRO Excavator digging-loading equipment is US$ 9.93/hour, operating costs are US$ 32.55/hour. The cost of owning the DT SYZ322C-8S means of transportation is US$ 0.54/hour, and operating costs are US$ 12.14/hour.
RENCANA PENAMBANGAN BATUBARA TRIWULAN PADA CV. KUTAI KUMALA ENERGY KECAMATAN LOA KULU, KABUPATEN KUTAI KARTANEGARA, PROVINSI KALIMANTAN TIMUR : QUARTERLY COAL MINING PLAN AT CV. KUTAI KUMALA ENERGY LOA KULU DISTRICT, KUTAI KARTANEGARA REGENCY, EAST KALIMAN Zwageri, Rizky; Devy, Shalaho Dina; Nugroho, Windhu; Winarno, Agus; Magdalena, Henny
Journal Transformation of Mandalika, e-ISSN: 2745-5882, p-ISSN: 2962-2956 Vol. 3 No. 5 (2022): Mei
Publisher : Institut Penelitian dan Pengembangan Mandalika Indonesia (IP2MI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36312/jtm.v3i5.1182

Abstract

Mining design is part of the planning stages of mining as a very important factor is determined before the actual mining plan begins. CV. Kutai Kumala Energy is a company engaged in coal mining which has a Mining Business License located in Loa Kulu District, Kutai Kartanegara Regency, East Kalimantan Province. On CV. Kutai Kumala Energy pit BC was calculated with the aim of meeting the overburden of 5,095,565.38 BCM and the coal stripping target of 673,541.31 MT. In determining production targets for 1 year and in accordance with the capabilities of the tools at the research location.
STUDI ADSORBSI LOGAM BESI (Fe) DAN MANGAN (Mn) PADA AIR ASAM TAMBANG OLEH KOMPOSIT: CLAYSTONE – ZEOLIT - KARBON AKTIF TERAKTIVASI ADSORPTION STUDY OF LOGAM BESI (Fe) AND MANGANESE (Mn) ON ACID MINE WATER BY CLAYSTONE COMPOSITE - ZEOLITE - ACTIVATED CARBO Ginting, Emdananta; Devy, Shalaho Dina; Henny Magdalena; Oktaviani, Revia; Respati, Lucia Litha
Journal Transformation of Mandalika, e-ISSN: 2745-5882, p-ISSN: 2962-2956 Vol. 3 No. 5 (2022): Mei
Publisher : Institut Penelitian dan Pengembangan Mandalika Indonesia (IP2MI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36312/jtm.v3i5.1184

Abstract

Composites are a combination of two or more different materials and their properties to form new materials that have better characteristics. The composite was previously composed of activated claystone, activated zeolite, and coconut shell activated charcoal with 3 ratios, namely: (claystone [C] : zeolite [Z] : activated charcoal [A] = 60:20:20; 20:20:60; and 20:60:20. This composite acts as an adsorbent in the adsorption process of acid mine water samples. Based on the results of the adsorption test, it was concluded that the composite cannot neutralize the pH of acid mine water. Of the three types of composites, Composite A (claystone [C] : zeolite [Z] : activated charcoal [A] = 60:20:20) showed a significant influence with a decrease in the concentration of heavy metals Iron and Manganese within 30 min of contact time. Fe adsorption capacity is 20,7 mg/g and Mn is 24,3 mg/g.
Evaluasi Unjuk Kerja Alat Gali-Muat pada Kegiatan Penambangan Batubara di PT. Insani Bara Perkasa Site Kam 11 Loajanan Kalimantan Timur Ruslan Patur; Harjuni Hasan; Henny Magdalena; Shalaho Dina Devi; Ardhan Ismail; Tommy Trides
Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan Vol. 3 No. 3 (2025): Agustus : Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/globe.v3i3.950

Abstract

This study aims to evaluate the performance of the loading and unloading equipment in coal mining activities at the Mahakam Pit, PT Insani Bara Perkasa Site Km 11, East Kalimantan. The research was motivated by the importance of achieving mechanical equipment performance standards according to the Decree of the Minister of Energy and Mineral Resources No. 1827 of 2018. Data were obtained through direct observation and analysis of actual working time and evaluation of operational constraint factors. The results of the analysis showed that before the evaluation, the mechanical availability (MA) value was 87.24%, physical availability (PA) 88.51%, availability utilization (UA) 88.73%, and effective utilization (EU) 78.54%. After evaluating the constraint time, there was an increase in all parameters: MA to 88.71%, PA to 89%, UA increased to 90%, and EU reached 80%. This evaluation also had an impact on increasing the productivity of the loading and unloading equipment from 268.41 bcm/hour to 284.43 bcm/hour. Thus, the evaluation of work obstacles is proven to be effective in increasing the efficiency and productivity of the digging-loading equipment at the research location.
Perhitungan Biaya Pengupasan dan Pengangkutan Overburden pada PIT 3000 Blok 12 PT Trubaindo Coal Mining Liganic Saprudin; Agus Winarno; Henny Magdalena; Windhu Nugroho
Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri Vol. 3 No. 2 (2025): Manufaktur : Publikasi Sub Rumpun Ilmu Keteknikan Industri
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/manufaktur.v3i2.874

Abstract

In stripping overburden activities, calculate the costs in order to provide an overview of the costs that will be incurred by the company. The purpose is to provide an overview of the costs that will be incurred by the company. The results of the research that has been done are as follows with a target of overburden stripping target of 480,000 BCM, Productivity of Komatsu PC digging equipment 300 fleet 1 217.35 BCM/hour, Komatsu PC 300 fleet 2 digging tool productivity 226.22 BCM/hour and Komatsu PC 400 fleet 3 285.87 BCM/hour. Cost The cost of digging equipment ownership is Rp. 172,347/hour and the operational cost of digging equipment is Rp. 3,415,959/hour. The cost of ownership of the conveyance is Rp. 404,437/hour and the operational cost of the conveyance is Rp. 3,415,959/hour. operational costs Rp. 3,502,939 / hour. The company certainly incurs production costs. One of which is operational costs, therefore it is necessary to
Studi Keberhasilan Reklamasi Tahap Operasi Produksi Tambang Batubara Pada Outpit Dump 1 Tiwa Abadi, Bayan Group Tabang Project, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur Prayoga, Yogi Bayu; Respati, Lucia Litha; Magdalena, Henny; Devy, Shalaho Dina; Nugroho, Windhu
JURNAL TEKNOLOGI MINERAL FT UNMUL Vol 13, No 1 (2025): Jurnal Teknologi Mineral FT UNMUL Juni 2025
Publisher : Universitas Mulawarman

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30872/jtm.v13i1.19459

Abstract

Studi Keberhasilan Reklamasi merupakan kegiatan yang penting untuk mengukur perubahan lingkungan yang terjadi pada wilayah bekas tambang. Perubahan lingkungan yang dimaksud salah satunya adalah perubahan kimiawi yang berdampak pada air tanah dan air permukaan. Lebih jauh lagi adalah perubahan iklim disebabkan perubahan kecepatan angin, gangguan flora dan fauna, serta tanah menjadi tandus dan gundul. Menurut Kepmen 1827 K/30/MEM/2018, reklamasi adalah kegiatan yang dilakukan sepanjang tahapan Usaha Pertambangan untuk menata, memulihkan, dan memperbaiki kualitas lingkungan dan ekosistem agar dapat berfungsi kembali sesuai peruntukannya. Kegiatan pengamatan di lapangan dan hasil analisa seluruh tahapan kegiatan reklamasi, dapat dilakukan penilaian keberhasilan reklamasi PT. Tiwa Abadi. Penilaian tabel keberhasilan reklamasi ada 17 kategori dalam setiap penilaian tersebut menggunakan parameter poin yaitu 1,2, dan 3. Hasil poin penilaian mendapatkan rata rata yaitu 3 poin. Menentukan nilai akhir perhitungan yaitu Total Skor Evaluasi untuk masing-masing kriteria dibagi dengan Jumlah Kriteria dikali dengan Nilai Maksimal Tiap Kriteria kemudian dikali 100%. Nilai Pencapaian persentase keberhasilan reklamasi PT. Tiwa Abadi pada tahun 2023 yaitu 78,43%. Kegiatan reklamasi juga melakukan pengelolaan pH Asam Tanah pada PT. Tiwa Abadi dengan pH Tanah (5-6). Dari faktor penghambat keberhasilan reklamasi yaitu tidak tercapai luas area revegetasi, tidak melakukan penanaman (cover crop), pertumbuhan tanaman cepat tumbuh 50%, belum melakukan penanaman tanaman lokal, belum terlihat penutup tajuk, dan belum dilakukannya penyulaman pada area revegetasi.
Estimasi Biaya Pembuatan Jalan Akses Tambang Bidang, Mayleni; Hasan, Harjuni; Magdalena, Henny
JURNAL TEKNOLOGI MINERAL FT UNMUL Vol 13, No 1 (2025): Jurnal Teknologi Mineral FT UNMUL Juni 2025
Publisher : Universitas Mulawarman

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30872/jtm.v13i1.19164

Abstract

Jalan akses tambang adalah sarana infrastruktur yang vital di dalam lokasi penambangan dan sekitar-nya. Kondisi jalan tambang di desain sesuai dengan ketentuan pada KepMen ESDM No 1827 K/30/MEM/2018, apabila tidak sesuai maka perlu dilakukan evaluasi pada geometri jalan untuk mengetahui kerusakan dan biaya yang diperlukan untuk melakukan perbaikan atau pembuatan jalan. Oleh karena itu, penelitian ini dilakukan untuk memberikan rekomendasi desain geometri jalan akses ideal, mengetahui volume dan lama pengerjaan, serta memberikan estimasi biaya yang diperlukan untuk melakukan pembuatan jalan akses. Salah satu metode yang dapat digunakan untuk melakukan pengukuran geometri jalan akses yaitu dengan menggunakan UAV (Unmanned Aerial Vehicle), merupakan kamera digital bersistem navigasi yang dapat dikontrol melalui piranti lunak perencanaan pemotretan. Berdasarkan hasil penelitian diperoleh lebar jalan lurus sebesar 9 meter dengan cross slope sebesar 0,18 meter. Lebar jalan belokan diperoleh sebesar 16 meter dengan jari-jari tikungan sebesar 416,04 meter dan superelevasi sebesar 6%, serta kemiringan jalan yang ditetapkan oleh perusahaan yaitu sebesar 6%. Volume material cut sebesar 5.679,74 BCM dan fill sebesar 28.150,37 BCM, dengan lama pengerjaan kurang lebih 10 hari. Sehingga diketahui total estimasi biaya untuk melakukan pembuatan jalan akses sesuai dengan rekomendasi jalan ideal yaitu sebesar Rp. 291.577.909.
Co-Authors Abdul Malik Agus Winarno Agus Winarno Agus Winarno, Agus Agus Winarno Ainayah Al Fatihah Albertus Juvensius Pontus Albertus Juvensius Pontus Alfiyanda, Ahmad Ardhan Ismail Bandaso, Surya Bidang, Mayleni Bunga Bunga Deni Saldi Devi, Shalaho Dina Devy, Shalaho Dina Dina Devy, Shalaho Dwi T. S. Fambudi Evita Endar Apriliana Fajar Ramadhan Fauzan Dwi Syahputra Febryantho Pasiakan Ferry Potik Kurniawan Fransiska Yuniari Saksono Galih Handhika Galih Handhika Gideon Samari Suno Ginting, Emdananta Harjuni Hasan Harjuni Hasan Harjuni Hasan Hasan , Harjuni Hikmawati Ilma Nurjanah Indri Tenri Datu Indri Tenri Datu Joniardi , Jovanda Ego Prisitama Jovensius Pontus, Albertus Ketut Swarningsih Koeshadi Sasmito Lhita Respati, Lucia Liganic Saprudin Litha Respati, Lucia Lucia Litha Respati Lucia Litha Respati Lucia Litha Respati Lucia Litha Respati M Dandy Al Fansya Miranda, Virgita Muhammad Ashar Alias Suara MUHAMMAD ILHAM Mushawir Mushawir Mutiara Eli Nimasari Nimasari Nirwana Putri Nugroho, Windhu Nurfaysa Permadi, Singgih Prayoga, Yogi Bayu Respati, Lucia Litha Rety Winonazada Revia Oktaviani Revia Oktaviani Revia Oktaviani Revia Oktaviani Revia Oktaviani Rexy Maulana Rofi Taufiqurrahman Roland Fatar Fernados Sirait Ruslan Patur S. Depari, Raja Kami Saeppudin, Ahmad Sakdillah Sakdillah Sakdillah S Sakdillah Sakdillah Saksono, Fransiska Yuniari Saskiyah Saskiyah Satriana Aulia, Andi Sendana, Aprianto Aris Shalaho Dina Devi Shalaho Dina Devy Shalaho Dyna Devy Sitepu, Anysa Ariel Siti Fadlah Musarofah Tommy Trides Tommy Trides Tommy Trides Tommy Trides Tommy Trides Tommy Trides Trides, Tommy Upiani, Ihsan Vivi Widiawati windhu Nugroho Windhu Nugroho Windhu Nugroho Windhu Nugroho windhu Yeriko, Kamril Zwageri, Rizky