STUDI LITERATUR FAKTOR KEBIJAKAN KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA PEKERJA PROYEK KONSTRUKSI Handayani, Febry; Lendra, Lendra; Happy Puspasari, Veronika
JOURNAL OF CIVIL ENGINEERING BUILDING AND TRANSPORTATION Vol. 8 No. 2 (2024): JCEBT SEPTEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/jcebt.v7i2.10328

Abstract

Examining the effect of the “occupational safety and health (K3) policy on worker performance” is very useful in order to get the influence of OSH involvement when it impacts workers. In construction projects, there are many elements that influence the success of the project, one of which is the quality of worker performance. Aims to find OSH policy factors and OSH policy factors during a pandemic on the performance of construction project workers by carrying out a literature study on several previous studies. The research methodology is conducting a literature search using the Publish or Perish application. Relevant literature is then used as a source of research. The results of the literature study, there are 39 OHS policy factors that are considered to have the potential to affect worker performance consisting of 30 OHS policy factors and 9 OHS policy factors during the pandemic on worker performance. There are 7 factors that are the most common in previous research, namely: the company provides work safety equipment, workers often use personal protective equipment to prevent incidents while carrying out their work. The implementation of the K3 system in order to guarantee the situation “The health of the workers, as well as providing a comfortable environment when they arrive has a good impact on the continuity of the workers in the Company”. Through the implementation of this facilitated programming implementation, the Company can improve the quality of workers and be able to manage their time properly when completing their work.
Pendampingan untuk Optimalisasi Kinerja Proyek Drainase: Produktivitas Alat Berat dan Kontribusi Terhadap Pembangunan Infrastruktur Lendra Lendra; Ruliana Febrianty; Alprido Perdian
Sipakaraya : Jurnal Pengabdian Masyarakat Vol. 4 No. 1 (2025): Sipakaraya : Jurnal Pengabdian Masyarakat
Publisher : Universitas Sulawesi Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31605/sipakaraya.v4i1.5535

Abstract

Pengabdian kepada masyarakat ini bertujuan memberikan pendampingan kerja praktek mahasiswa Teknik Sipil pada proyek pembangunan drainase untuk meningkatkan kompetensi analisis produktivitas alat berat dan berkontribusi pada keberhasilan proyek infrastruktur. Kegiatan dilaksanakan selama enam bulan menggunakan pendekatan pembelajaran eksperiensial melalui orientasi proyek, pendampingan teknis konstruksi, analisis produktivitas alat berat, monitoring berkala, dan penyusunan laporan. Evaluasi pre-post test terhadap empat mahasiswa menunjukkan peningkatan kompetensi rata-rata 68,3%, dengan peningkatan tertinggi pada keterampilan analisis produktivitas (140%). Analisis produktivitas mengungkapkan semua alat berat (excavator standard, excavator long arm, dump truck, concrete mixer, dan concrete truck mixer) mencapai durasi kerja lebih cepat dari jadwal pelaksanaan, mengindikasikan perencanaan optimal. Kontribusi kegiatan meliputi dokumentasi sistematis, analisis terstruktur, dan identifikasi solusi permasalahan teknis. Tantangan utama mencakup koordinasi stakeholder, keterbatasan waktu pendampingan, dan akses data proyek. Pendampingan kerja praktek terbukti efektif meningkatkan kompetensi praktis, soft skills, dan pemahaman industri konstruksi, serta memberikan kontribusi positif terhadap optimalisasi proyek drainase.
PERENCANAAN FASILITAS PENGELOLAAN SAMPAH BERKELANJUTAN: DESAIN TPS3R UNTUK KAMPUS UNIVERSITAS PALANGKA RAYA Alprido Perdian; Lendra Lendra; Nasyiin Faqih
Device Vol. 15 No. 2 (2025): November
Publisher : Fakultas Teknik dan Ilmu Komputer (FASTIKOM) UNSIQ

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32699/d1j31q91

Abstract

The growth of the academic community at Palangka Raya University has led to significant waste problems. Without an appropriate and sustainable management system, the accumulation of waste can have a negative impact on environmental cleanliness, the health of the campus community, and the aesthetics and image of the institution. To address these challenges, a more progressive and sustainability-oriented waste management system is needed through the planning and construction of a Reduce, Reuse, Recycle Waste Management Facility (TPS3R). This planning includes building design and the preparation of a Cost Estimate Plan (RAB) tailored to the needs of Palangka Raya University. The implementation of the construction project requires comprehensive and accurate budget calculations. The preparation of the cost plan must consider the principle of economic efficiency while maintaining consistency with established quality standards and technical specifications. Based on the analysis conducted by the researchers, waste generation data was obtained, and the TPS3R building design for Palangka Raya University is planned to cover an area of 216 square metres with a budget plan of Rp 752,964,900.00. It is hoped that the design planning of the TPS3R building at Palangka Raya University will not only serve as a technical solution to waste management issues but also as a model for campus environmental management that can be replicated in other educational institutions.
OPTIMALISASI SUMBER DAYA MANUSIA MENGGUNAKAN APLIKASI LiPS PADA KEGIATAN PENDAMPINGAN PROYEK DRAINASE KOTA PALANGKA RAYA Lendra Lendra; Robby Robby; Nasyiin Faqih
Jurnal Penelitian dan Pengabdian Kepada Masyarakat UNSIQ Vol. 10 No. 2 (2023): May
Publisher : Lembaga Penelitian, Penerbitan dan Pengabdian Masyarakat (LP3M) UNSIQ

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32699/ppkm.v10i2.4697

Abstract

Penelitian ini merupakan hasil pendampingan dan pengabdian kepada masyarakat dan dilaksanakan pada proyek saluran drainase di Jalan Tingang VI, Palangka Raya, yang merupakan sistem penting dalam perencanaan kota untuk mengelola kelebihan air. Tujuan pengabdian ini adalah membantu PT. Tanjong Harapan, kontraktor pelaksana, dan pemilik proyek Balai wilayah Sungai Kalimantan II dalam mencapai pelaksanaan optimal. Metode analisis yang digunakan adalah metode simpleks dengan memproses data dari proyek, seperti RAB, harga upah dan bahan, serta jadwal waktu. Hasil analisis meliputi kebutuhan tenaga kerja dan optimasi durasi proyek menggunakan Microsoft Project, durasi proyek berhasil diperpendek menjadi 258 hari. Selanjutnya, dilakukan optimasi menggunakan Aplikasi LiPS, di mana 14 uraian pekerjaan berhasil dioptimasi menjadi 6 uraian, yaitu pengukuran, galian tanah biasa, pekerjaan lantai kerja beton K-100, pekerjaan L-Gutter (pekerjaan bekisting), pekerjaan L-Gutter (pekerjaan pembesian), dan pekerjaan L-Gutter (pekerjaan beton). Jumlah total tenaga kerja per hari sebelum optimasi adalah 148 orang hari, setelah dioptimasi menjadi 107 orang hari, atau mengalami pengurangan sebesar 41 orang hari. Berdasarkan jumlah tenaga kerja sebelum optimasi, biaya tenaga kerja adalah Rp. 26.360.000,-/hari. Setelah dilakukan optimasi dengan metode simpleks, diperoleh biaya optimum pekerjaan per hari sebesar Rp. 19.310.000,-/hari, yang mengindikasikan penghematan sebesar Rp. 7.050.000,-/hari.
Optimalisasi Manajemen Nilai Hasil untuk Pengendalian Waktu dan Biaya: Studi Kasus Proyek Drainase Lendra Lendra; Lelo Sintani; Salonten Salonten; Robby Robby; Nasyiin Faqih
Journal of Economic, Management, Accounting and Technology (JEMATech) Vol 8 No 1 (2025): February
Publisher : Fakultas Teknik dan Ilmu Komputer, Universitas Sains Al-Qur'an (UNSIQ) Wonosobo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32500/jematech.v8i1.6963

Abstract

Pertumbuhan populasi dan urbanisasi yang cepat di Kota Palangka Raya menyebabkan tekanan besar pada sumber daya ruang dan lingkungan, terutama infrastruktur sanitasi. Pembangunan kawasan perkotaan yang ekspansif membutuhkan infrastruktur yang memadai, termasuk drainase efektif untuk mengurangi risiko banjir. Pembangunan saluran drainase primer di Kota Palangka Raya merespons kompleksitas sanitasi lingkungan di wilayah tersebut, dengan pengendalian waktu dan biaya proyek menjadi krusial untuk kelancaran pembangunan infrastruktur tersebut. Penelitian ini menggunakan metode Earned Value Management (EVM) untuk menginvestigasi efektivitas pengendalian waktu dan biaya dalam pembangunan saluran drainase primer, dengan menerapkan pendekatan studi kasus eksploratif yang mengintegrasikan data kuantitatif, diharapkan memberikan kontribusi pada pemahaman penerapan EVM dalam proyek konstruksi. Terdapat empat tahap dalam pelaksanaan penelitian ini: pengumpulan data dari perusahaan konstruksi terkait, pengolahan data menjadi tabel observasi, implementasi metodologi EVM, dan analisis data serta hasilnya. Hasilnya menunjukkan fluktuasi signifikan dalam CPI dan SPI, menekankan pentingnya pemantauan dan pengendalian yang cermat terhadap kinerja proyek. TCPI > 1 menunjukkan bahwa proyek mungkin menghadapi tekanan biaya untuk mencapai target biaya yang ditetapkan. Perbaikan perlu dilakukan dengan mengidentifikasi penyebab tantangan dalam mengelola biaya dan jadwal, memperbaiki perencanaan dan pengendalian proyek, optimalisasi penggunaan sumber daya, menjaga komunikasi yang efektif, menerapkan manajemen risiko proaktif, dan melakukan evaluasi rutin untuk pembelajaran.