Impact of Green Building Implementation on Health and Well-being of Building Users in Indonesia Lendra, Lendra; Jesica, Jesica; Febrianty, Ruliana
Jurnal Presipitasi : Media Komunikasi dan Pengembangan Teknik Lingkungan Vol 22, No 1 (2025): March 2025
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/presipitasi.v22i1.1-14

Abstract

This research conducts a systematic literature review, adopting the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines, to examine the impact of green building implementation on health and well-being of users in Indonesia. The aim is to systematically categorize and analyze both the positive and negative effects of green building practices on occupants while identifying specific challenges that influence occupant comfort and safety. After analyzing articles from 2018 to 2023, a total of 15 papers were identified as primary resources for this study. The research found that green buildings have both positive and negative impacts. Positive impacts include minimal air pollution, good natural lighting, cool natural ventilation, and reduced noise disturbance. There are negative impacts such as insufficient natural lighting and ventilation in some areas, high noise levels, and security issues. This research provides insights for improving green building concepts to better support public health and occupational safety. By considering these impacts, future building environments can be designed to be healthier and more conducive to promoting public health and well-being. Future research should address operational challenges by exploring hybrid systems that integrate natural and artificial elements for consistent comfort, along with innovative solutions for noise and wildlife control.
Faktor-Faktor Penyebab Keterlambatan Penyelesaian Proyek Konstruksi Gedung di Kota Palangka Raya Muntadhimah, In; Nuswantoro, Waluyo; Lendra, Lendra
Portal: Jurnal Teknik Sipil Vol 17, No 1 (2025): April Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v17i1.6440

Abstract

Keterlambatan dalam pelaksanaan proyek bangunan dapat diakibatkan oleh berbagai macam peristiwa. Contoh penundaan dalam proyek konstruksi terjadi ketika proyek membutuhkan waktu lebih lama dari yang diharapkan untuk diselesaikan. Di Kota Palangka Raya masih banyak proyek yang mengalami keterlambatan dalam proses pelaksanaannya. Dengan fokus pada proyek konstruksi bangunan di Kota Palangka Raya, tujuan dari penelitian ini adalah untuk mengidentifikasi penyebab keterlambatan proyek dan memastikan faktor mana yang paling banyak terjadi. Pengumpulan data dilakukan dengan penyebaran kuesioner dan studi literatur yang disebarkan kepada 47 kontraktor. Pengolahan data dibantu software SPSS dan Ms. Excel untuk menganalisis dan mengolah data meliputi uji validitas dan uji reliabilitas, analisis deskriptif dengan nilai mean dan standar deviasi. Delapan faktor signifikan yaitu tenaga kerja, material, peralatan, kondisi lapangan, desain, manajerial, keuangan, dan kejadian tak terduga ditemukan sebagai penyebab keterlambatan proyek di Kota Palangka Raya setelah analisis dilakukan. Tiga faktor dominannya, kelangkaan material di pasar (mean 4,596), bencana alam (mean 4,511) dan keterlambatan pengiriman material ke lokasi proyek (mean 4,383).
Pendampingan untuk Optimalisasi Kinerja Proyek Drainase: Produktivitas Alat Berat dan Kontribusi Terhadap Pembangunan Infrastruktur Lendra, Lendra; Febrianty, Ruliana; Perdian, Alprido
Sipakaraya : Jurnal Pengabdian Masyarakat Vol 4 No 1 (2025): Sipakaraya : Jurnal Pengabdian Masyarakat
Publisher : Universitas Sulawesi Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31605/sipakaraya.v4i1.5535

Abstract

Pengabdian kepada masyarakat ini bertujuan memberikan pendampingan kerja praktek mahasiswa Teknik Sipil pada proyek pembangunan drainase untuk meningkatkan kompetensi analisis produktivitas alat berat dan berkontribusi pada keberhasilan proyek infrastruktur. Kegiatan dilaksanakan selama enam bulan menggunakan pendekatan pembelajaran eksperiensial melalui orientasi proyek, pendampingan teknis konstruksi, analisis produktivitas alat berat, monitoring berkala, dan penyusunan laporan. Evaluasi pre-post test terhadap empat mahasiswa menunjukkan peningkatan kompetensi rata-rata 68,3%, dengan peningkatan tertinggi pada keterampilan analisis produktivitas (140%). Analisis produktivitas mengungkapkan semua alat berat (excavator standard, excavator long arm, dump truck, concrete mixer, dan concrete truck mixer) mencapai durasi kerja lebih cepat dari jadwal pelaksanaan, mengindikasikan perencanaan optimal. Kontribusi kegiatan meliputi dokumentasi sistematis, analisis terstruktur, dan identifikasi solusi permasalahan teknis. Tantangan utama mencakup koordinasi stakeholder, keterbatasan waktu pendampingan, dan akses data proyek. Pendampingan kerja praktek terbukti efektif meningkatkan kompetensi praktis, soft skills, dan pemahaman industri konstruksi, serta memberikan kontribusi positif terhadap optimalisasi proyek drainase.
Study of Literature on Risk Management for Employee Health and Safety in Construction Projects Afanda, Delia Monica; Lendra, Lendra; Kristiana, Wita
SITEKIN: Jurnal Sains, Teknologi dan Industri Vol 21, No 1 (2023): December 2023
Publisher : Fakultas Sains dan Teknologi Universitas Islam Negeri Sultan Syarif Kasim Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24014/sitekin.v21i1.23074

Abstract

Assessing possible risks in construction projects helps predict risks and plan risk management strategies. In construction projects, many factors can affect project completion, including the risk of work accidents. This research aims to look for Occupational Health and Safety risk factors for COVID-19 in construction projects by conducting a literature study on several previous studies. The research methodology is a literature search using the Publish or Perish application. Relevant literature is then used as a source of research. Based on the results of a literature study, twenty-eight risk factors are considered to have the potential to occur in construction projects consisting of eighteen OHS risk factors and ten COVID-19 risk factors. The five most common risk factors for OHS in previous studies were: falling from a height, being hit by material, being electrocuted, being scratched by workers, being punctured by material, and being hit by heavy equipment.
Optimalisasi Manajemen Nilai Hasil untuk Pengendalian Waktu dan Biaya: Studi Kasus Proyek Drainase Lendra, Lendra; Sintani, Lelo; Salonten, Salonten; Robby, Robby; Faqih, Nasyiin
Journal of Economic, Management, Accounting and Technology (JEMATech) Vol 8 No 1 (2025): Februari
Publisher : Fakultas Teknik dan Ilmu Komputer, Universitas Sains Al-Qur'an (UNSIQ) Wonosobo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32500/jematech.v8i1.6963

Abstract

Pertumbuhan populasi dan urbanisasi yang cepat di Kota Palangka Raya menyebabkan tekanan besar pada sumber daya ruang dan lingkungan, terutama infrastruktur sanitasi. Pembangunan kawasan perkotaan yang ekspansif membutuhkan infrastruktur yang memadai, termasuk drainase efektif untuk mengurangi risiko banjir. Pembangunan saluran drainase primer di Kota Palangka Raya merespons kompleksitas sanitasi lingkungan di wilayah tersebut, dengan pengendalian waktu dan biaya proyek menjadi krusial untuk kelancaran pembangunan infrastruktur tersebut. Penelitian ini menggunakan metode Earned Value Management (EVM) untuk menginvestigasi efektivitas pengendalian waktu dan biaya dalam pembangunan saluran drainase primer, dengan menerapkan pendekatan studi kasus eksploratif yang mengintegrasikan data kuantitatif, diharapkan memberikan kontribusi pada pemahaman penerapan EVM dalam proyek konstruksi. Terdapat empat tahap dalam pelaksanaan penelitian ini: pengumpulan data dari perusahaan konstruksi terkait, pengolahan data menjadi tabel observasi, implementasi metodologi EVM, dan analisis data serta hasilnya. Hasilnya menunjukkan fluktuasi signifikan dalam CPI dan SPI, menekankan pentingnya pemantauan dan pengendalian yang cermat terhadap kinerja proyek. TCPI > 1 menunjukkan bahwa proyek mungkin menghadapi tekanan biaya untuk mencapai target biaya yang ditetapkan. Perbaikan perlu dilakukan dengan mengidentifikasi penyebab tantangan dalam mengelola biaya dan jadwal, memperbaiki perencanaan dan pengendalian proyek, optimalisasi penggunaan sumber daya, menjaga komunikasi yang efektif, menerapkan manajemen risiko proaktif, dan melakukan evaluasi rutin untuk pembelajaran.
The Assessment of Occupational Safety and Health Risk Management on Construction Projects During the Covid-19 Pandemic Lendra, Lendra; Gawei, Apria Brita Pandohop; Sintani, Lelo; Afanda, Delia Monica; Tjakra, Jermias
International Journal of Disaster Management Vol 6, No 1 (2023)
Publisher : TDMRC, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/ijdm.v6i1.30811

Abstract

The Covid-19 pandemic has weakened various business sectors, including the construction services business. This research aims to identify OHS risks in building construction projects during the Covid-19 pandemic, provide an assessment and provide control solutions for these risks. The research method begins with identifying risk factors and distributing risk assessment questionnaires to thirty building construction companies. Then determine the risk rating with the Relative Importance Index (RII) and the risk category using the AS/NZS 4360:2004 standard. The risk control questionnaire was finally distributed to three selected respondents, including a director, a project manager, and an OHS manager, all of whom have at least an undergraduate degree. Based on the analysis, it is found that there is a similarity in the ranking of risk factors from the calculation of the RII value and the AS/NZS 4360:2004 standard, indicating that there is a positive and significant relationship between these two methods. The top three risk factors based on RII are: Covid-19 spread, falling from a height, and being electrocuted. Based on the AS/NZS 4360:2004 standard, these three factors are considered high and moderate risk, while the risk control solutions are: comply with and implement health protocols, use PPE, strong/sturdy scaffolding, install safety nets, arranging safe electrical lines, conduct socialization, and educate workers about Covid-19.
FEASIBILITY EVALUATION OF HEAVY EQUIPMENT RENTAL INVESTMENT IN SOUTH KALIMANTAN Purwantoro, Almuntofa; Wibowo, Guswiem; Lendra, Lendra
Jurnal Disprotek Vol 15, No 1 (2024)
Publisher : Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/jdpt.v15i1.4967

Abstract

Development in the construction sector in Indonesia is one of the reasons investment is why heavy equipment has increased, but in 2020 Indonesia's economic growth contracted by 2.07 due to Covid-19. Economic growth in Indonesia in 2020 affected heavy equipment rental companies, especially in South Kalimantan. To assess the feasibility of investments that have been carried out in this study, one of them relies on the analysis of the investment break-even point and its sensitivity. The evaluation aims to determine the feasibility of the business that has been implemented. Based on Break Even Point that occurred at 2.46 years at that time revenue amounted to Rp. 98,784,716,825. The results of the sensitivity analysis stated that the assumption of fixed income and expenditure costs increased by 50% resulting in an NPV of Rp. 67,126,506,911 declared feasible, the break-even point obtained at 4.50 years or 4 years 163 days of income of Rp. 67,126,506,911. Revenue decreased by 50% and fixed expenses resulted in an NPV of -Rp. 24,104,127,174 declared unfeasible, the break-even point did not find results because the company still suffered losses until 2026. Revenue fell by 50% and income increased by 50% resulting in NPV -Rp. 100,720,629,289 declared unfeasible, the break-even point did not find results because the company was still experiencing losses until 2026.EVALUASI KELAYAKAN INVESTASI PENYEWAAN ALAT BERAT DI KALIMANTAN SELATANPembangunan di bidang konstruksi di Indonesia menjadi salah satu alasan investasi mengapa peralatan alat berat mengalami peningkatan namun pada tahun 2020 pertumbuhan ekonomi Indonesia mengalami kontraksi sebesar 2,07 akibat covid-19. Pertumbuhan ekonomi di Indonesia pada tahun 2020 berimbas perusahaan penyewaan alat berat khususnya di Kalimantan Selatan. Untuk menilai kelayakan investasi yang telah dilaksanakan dalam penelitian ini salah satunya bergantung pada analisis break even point inventasi dan sensitivitasnya. Evaluasi tersebut dimaksud bertujuan untuk mengetahui kelayakan usaha yang telah di laksanakan. Berdasarkan Break Even Point terjadi pada 2,46 Tahun pada saat itu pendapatan sebesar Rp. 98.784.716.825. Hasil analisis sensitivitas menyatakan bahwa asumsi pemasukan tetap dan biaya pengeluaran naik 50% menghasilkan NPV yaitu Rp. 67.126.506.911 dinyatakan layak, titik impas mendapatkan pada 4,50 tahun atau 4 tahun 163 hari pendapatan sebesar Rp. 67.126.506.911. Pemasukan turun 50% dan biaya pengeluaran tetap menghasilkan NPV yaitu -Rp. 24.104.127.174 dinyatakan tidak layak, titik impas tidak menemukan hasil karena perusahaan masih mengalami kerugian sampai tahun 2026. Pemasukan turun 50% dan pemasukan naik 50% menghasilkan NPV -Rp. 100.720.629.289 dinyatakan tidak layak, titik impas tidak menemukan hasil karena perusahaan masih mengalami kerugian sampai tahun 2026.
PEMANFAATAN APLIKASI MENDELEY DALAM MENINGKATKAN KUALITAS ARTIKEL INTERNASIONAL: PELATIHAN BERBASIS TEKNOLOGI Purwanti, Ari; Lendra, Lendra; Punggeti, Ratna Novita; Nurtamam, Mohammad Edy; Warastuti, Diah; Wisma, Nur
Community Development Journal : Jurnal Pengabdian Masyarakat Vol. 5 No. 3 (2024): Volume 5 No. 3 Tahun 2024
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/cdj.v5i3.28551

Abstract

Kegiatan pengabdian kepada masyarakat ini bertujuan untuk meningkatkan kualitas artikel internasional melalui pemanfaatan aplikasi Mendeley dalam pelatihan berbasis teknologi. Manajemen referensi yang efisien menjadi kunci dalam penyusunan artikel ilmiah yang berkualitas. Namun, banyak peneliti mengalami kesulitan dalam hal ini. Kegiatan dilaksanakan pada tanggal 29 April 2024 melalui platform virtual Zoom, diikuti oleh 29 peserta dari berbagai latar belakang. Materi pelatihan mencakup pengenalan Mendeley, fitur-fitur utamanya, dan praktik penggunaannya dalam manajemen referensi. Metode pelatihan melibatkan presentasi interaktif, demonstrasi langsung penggunaan Mendeley, serta sesi latihan dan diskusi kelompok. Hasilnya menunjukkan peningkatan pemahaman dan keterampilan peserta dalam menggunakan Mendeley, serta peningkatan kualitas artikel internasional yang dihasilkan. Kegiatan ini memberikan dampak positif yang signifikan bagi peserta dan komunitas ilmiah, dengan meningkatkan kualitas penelitian yang dihasilkan.
PELATIHAN PENYUSUNAN BUKU BER-ISBN: KUNCI SUKSES KARIER DOSEN Purba, Ulfani Ikhwana; Nofirman, Nofirman; Dahlan, Akhmad; Witjaksana, Budi; Lendra, Lendra; Amalia, Mekar Meilisa
Community Development Journal : Jurnal Pengabdian Masyarakat Vol. 5 No. 3 (2024): Volume 5 No. 3 Tahun 2024
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/cdj.v5i3.28594

Abstract

Pelatihan Penyusunan Buku ber-ISBN: Kunci Sukses Karier Dosen dilaksanakan untuk mengatasi kesulitan yang dihadapi dosen dalam menyusun dan menerbitkan buku ber-ISBN, yang penting untuk peningkatan karier akademik dan kontribusi ilmiah. Kegiatan ini diikuti oleh 28 peserta dari berbagai kalangan dan dilaksanakan melalui aplikasi Zoom pada 19 Februari 2024. Metode pelatihan meliputi sesi pembukaan, materi inti, praktik, dan diskusi interaktif. Hasilnya menunjukkan peningkatan pemahaman dan keterampilan peserta dalam menyusun naskah buku, serta kesadaran akan standar penulisan dan prosedur penerbitan. Evaluasi pasca-pelatihan menunjukkan peningkatan signifikan dalam pengetahuan peserta dan kepercayaan diri untuk menerbitkan buku ber-ISBN. Pelatihan ini juga memperkuat jaringan antara dosen, membuka peluang kolaborasi, dan memberikan wawasan tentang tren penerbitan digital. Kesimpulannya, pelatihan ini efektif dalam membekali dosen dengan keterampilan praktis dan pengetahuan mendalam, yang penting untuk pengembangan karier dan kontribusi terhadap pendidikan tinggi di Indonesia.
ANALISIS PENGGUNAAN METODE PEMBELAJARAN BERBASIS TEKNOLOGI DALAM PENINGKATAN KUALITAS PENDIDIKAN DI PERGURUAN TINGGI Ati, Hesti Mustika; Wiliyanti, Vandan; Hasnah, Sitti; Sriwati, Meny; Kasnawati, Kasnawati; Lendra, Lendra
Jurnal Review Pendidikan dan Pengajaran Vol. 7 No. 3 (2024): Volume 7 No 3 Tahun 2024
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jrpp.v7i3.29868

Abstract

Penelitian ini bertujuan untuk menganalisis penggunaan metode pembelajaran berbasis teknologi dalam meningkatkan kualitas pendidikan di perguruan tinggi. Dengan menggunakan metode studi literatur, penelitian ini mengkaji berbagai literatur yang relevan untuk memahami dampak teknologi seperti e-learning dan blended learning terhadap aksesibilitas, fleksibilitas, keterlibatan, dan hasil akademik mahasiswa. Hasil penelitian menunjukkan bahwa metode pembelajaran berbasis teknologi mampu meningkatkan kualitas pendidikan dengan memberikan fleksibilitas dalam waktu dan tempat belajar, serta meningkatkan interaktivitas dan keterlibatan mahasiswa dalam proses pembelajaran. Meskipun demikian, penelitian ini juga mengidentifikasi beberapa tantangan dalam penerapan teknologi dalam pembelajaran, termasuk keterbatasan infrastruktur dan kesiapan sumber daya manusia. Untuk mengatasi tantangan ini, perguruan tinggi perlu meningkatkan investasi dalam infrastruktur teknologi dan menyediakan pelatihan bagi dosen untuk meningkatkan kompetensi mereka dalam menggunakan teknologi. Selain itu, kurikulum perlu disesuaikan untuk mengakomodasi pendekatan pembelajaran yang lebih modern dan interaktif. Dengan strategi yang tepat, teknologi dapat menjadi alat yang kuat untuk mendukung proses belajar-mengajar yang lebih efektif dan efisien, serta mempersiapkan mahasiswa untuk menghadapi tantangan di dunia kerja yang semakin digital dan terintegrasi.