Short-Term Electricity Load Forecasting Model Based DSARIMA Mado, Ismit; Rajagukguk, Antonius; Triwiyatno, Aris; Fadllullah, Arif
International Journal of Electrical, Energy and Power System Engineering Vol. 5 No. 1 (2022): International Journal of Electrical, Energy and Power System Engineering (IJEEP
Publisher : Electrical Engineering Department, Faculty of Engineering, Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31258/ijeepse.5.1.6-11

Abstract

Forecasting short-term electrical load is very important so that the quality of the electrical power supplied can be maintained properly. The study was conducted to measure the results of electrical load forecasting based on parameter estimates and the presentation of time series data. It is important to manage stationary data, both in terms of mean and variance. Data presentation is done by determining the value of variance through the Box-Cox transformation method and the mean value based on the ACF and PACF plots. This study considers the pattern of electricity consumption which contains double seasonal patterns. The results of previous studies show the electric power prediction model, the DSARIMA model with a MAPE of 2.06%. The condition of the model used to predict the electrical load still has a tendency not to be normally distributed and it is estimated that there are outliers. Improvements to the AR and MA parameters that meet the standard error tolerance value of 5 percent are increased in this study. The results showed improvement of parameters to predict electrical load with DSARIMA model. The significance of this study was obtained by the MAPE value of 1.56 percent when compared to the actual data.
Perancangan Algoritma Optimasi Menggunakan Particle Swarm Optimization (PSO) Untuk Model Wind Turbine Farm Habiby, Jawwad Sulthon; Triwiyatno, Aris; Andromeda, Trias
AutoMech : Jurnal Teknik Mesin Vol 1, No 01 (2021): Nopember
Publisher : Universitas Muhammadiyah Ponorogo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24269/jtm.v1i01.4123

Abstract

Di Indonesia dengan tuntutan energi listrik yang terus meningkat, produksi bahan bakar yang berupa batu bara dan minyak bumi mungkin akan mencapai batasnya dalam beberapa dasawarsa, disertai peningkatan sejumlah kasus cuaca ekstrim dan pemanasan global. Oleh karena itu, perlu dicari semacam solusi terhadap pemenuhan listrik dengan pemanfaatan energi alternative terbarukan yang cukup berpotensi di Indonesia. Salah satu energi alternatif terbarukan yang saat ini adalah penggunaan teknologi turbin angin dimana energi angin yang diperoleh bebas dari alam, akan diubah sedemikian rupa hingga menjadi energi listrik. Dalam tesis ini dipelajari tentang efek dari penggunaan turbin angin dengan jarak hub yang berbeda di sebuah wilayah produksi pembangkitan listrik tenaga angin, untuk mencari jarak dan jumlah turbin terbaik yang digunakan. Disajikan sebuah formulasi matematis dalam membangun sistem multi-turbin. Mengingat turbin angin dengan jarak dan jumlah turbin yang bervariasi maka model tersebut diselesaikan menggunakan metode Algoritma Particle Swarm Optimization (PSO). Dengan hasil konfigurasi turbin yang terbaik akan diperoleh biaya yang minimum dan  pembangkitan daya yang maksimum.
Economic Operation of Hybrid Power Plant The Wind In Bantul D.I. Yogyakarta Winardi, Bambang; Imam Santoso; Aris Triwiyatno
Journal of International Multidisciplinary Research Vol. 2 No. 5 (2024): Mei 2024
Publisher : PT. Banjarese Pacific Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62504/m7jmtm21

Abstract

Hybrid Power Plants (PLTH) are power plants consisting of PLTS with wind turbines. The Bayu Baru PLTH must be regularly evaluated because the PLTH components are susceptible to damage. This evaluation aims to ensure that electrical energy continuity is maintained. PLTH performance can be measured through the performance of each generation component. The performance of PLTH solar panels and wind turbines can be measured from the output power of these components. With HOMER software simulation, you can calculate the economic level of a hybrid generating system based on the lowest NPC value. Simulation results with HOMER software show that the most economical generating components in PLTH are wind turbines with a capacity of 5kW and 2.5kW based on LCOE values ​​of $0.190 and $0.171/kWh.
Utilization of Solar Energy in Improving Energy Efficiency of Urban Households: A Bibliometric Review Soelistianto, Farida Arinie; Triwiyatno, Aris; Winardi, Bambang; Vandika, Arnes Yuli
West Science Interdisciplinary Studies Vol. 2 No. 11 (2024): West Science Interdisciplinary Studies
Publisher : Westscience Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58812/wsis.v2i11.1469

Abstract

The utilization of solar energy has emerged as a critical solution for improving energy efficiency and achieving sustainability in urban households. This study conducts a bibliometric review to explore the research landscape on solar energy adoption, focusing on technological advancements, socio-economic implications, environmental benefits, and policy frameworks. The analysis identifies key themes such as photovoltaic innovations, smart grid integration, and energy storage technologies, as well as the influence of government incentives and community-based projects on adoption rates. While solar energy offers significant environmental and economic benefits, challenges such as high installation costs, energy variability, and aesthetic concerns remain. The findings highlight the need for interdisciplinary approaches and emerging technologies, including artificial intelligence and decentralized systems, to overcome these barriers. This review provides valuable insights for researchers, policymakers, and stakeholders to advance solar energy utilization and contribute to sustainable urban development.
Perancangan Mikrogrid di Pulau Tunda Menggunakan Aplikasi HOMER Pro Wibowo, Arie; Triwiyatno, Aris; Soetrisno, Yosua Alvin Adi
Jurnal Profesi Insinyur Indonesia Vol 2, No 4 (2024): JPII
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/jpii.2024.24583

Abstract

Sumber energi terbarukan, khususnya energi matahari, memiliki potensi besar untuk memenuhi permintaan energi di daerah terpencil yang jauh dari jaringan listrik yang ada. Artikel ini menyajikan penggunaan optimal energi matahari yang ditangkap oleh panel photovoltaic (PV), dikombinasikan dengan sistem penyimpanan baterai, konverter dan generator diesel untuk menyediakan listrik di Pulau Tunda, Banten, Indonesia. Simulasi sistem Mikrogrid dilakukan dengan menggunakan perangkat lunak HOMER Pro. Hasil optimal HOMER diurutkan berdasarkan Net Present Cost (NPC) terendah. Hasil simulasi HOMER menunjukkan bahwa konfigurasi sistem paling optimal terdiri dari generator diesel 130 kW, panel PV 500 kW, 75 rangkaian penyimpanan baterai dan konverter sistem 125 kW. Kata kunci: Mikrogrid, PV, energi terbarukan, HOMER
Analisis Saluran Kabel Tanah pada Proyek Pembangunan Saluran Kabel Tegangan Tinggi 150kV Kawasan Industri Kapasitas 170MVA Sepanjang 6,5 kmr Kartojo, Ismail Hartanto; Triwiyatno, Aris; Nisworo, Sapto
Jurnal Profesi Insinyur Indonesia Vol 2, No 4 (2024): JPII
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/jpii.2024.24584

Abstract

Karya ilmiah ini disusun untuk melakukan analisis pembangunan transmisi berkapasitas 170 MVA dan panjang 6,5 kmr guna memenuhi kebutuhan pelanggan tegangan tinggi di kawasan industri. Pelanggan akan disuplai dari dua sub sistem yang berbeda dan pasokan listrik mulai digunakan dalam jangka waktu satu tahun. Sehubungan jangka waktu konstruksi yang singkat, maka pasokan listrik tahap satu akan disuplai melalui SKTT. Agar pembangunan SKTT dilaksanakan secara tepat mutu, biaya dan waktu maka dilakukan analisis untuk menentukan saluran kabel tanah yang akan digunakan meliputi jenis dan ukuran penampang kabel, metode penggelaran kabel, proteksi mekanis kabel serta memenuhi aturan yang berlaku dengan mempertimbangkan perkembangan teknologi kabel tanah. Berdasarkan hasil analisis yang dilakukan maka pembangunan SKTT menggunakan kabel konduktor aluminium 2000 mm2 dengan metallic sheath corrugated aluminium sheath. Sesuai hasil perhitungan KHA, pada kedalaman 7 meter dengan konfigurasi trefoil dan metode HDD, saluran kabel dapat mengaliri arus senilai 760 A atau setara 197 MVA. Kata kunci: Analisis SKTT, kawasan industri, KHA, trefoil, HDD, corrugated aluminium sheath
Peninjauan Keandalan Sistem Pentanahan Tower SUTT 150 kV Jakabaring-Keramasan Terhadap Arus Gangguan Junaedi, Junaedi; Triwiyatno, Aris; Sumardi, Sumardi
Jurnal Profesi Insinyur Indonesia Vol 2, No 5 (2024): JPII
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/jpii.2024.24592

Abstract

Untuk menjaga keandalan proses penyaluran energi listrik dari arus gangguan, proteksi yang digunakan di antaranya adalah sistem pentanahan pada tower-tower Saluran Udara Tegangan Tinggi (SUTT). Penelitian ini bertujuan untuk meninjau atau mengevaluasi SUTT 150 kV Section Jakabaring-Keramasan dikarenakan SUTT ini melewati permukiman dan lahan pertanian masyarakat, tentunya dengan sistem proteksi pentanahan sangat diandalkan melindungi tower dan mahluk hidup dari induksi tegangan listrik maupun dampak sambaran petir. Dari hasil pengukuran resistansi pentanahan di tower SUTT 150 kV masih relatif aman di mana nilai resistansi pentanahan masih dibawah 5 Ω, termasuk dari hasil perhitungan. Dari analisa resistansi pentanahan dengan kondisi tanah memiliki struktur dua lapis melalui Cymgrd dimana potesial terjadinya tegangan langkah ditimbulkan sebesar 208,34 volt dan potensial terjadinya tegangan sentuh 175,12 volt. Sedangkan dari konstruksi sistem pentanahan terpasang melalui simulasi Cymgrd bahwa konstruksi pentanahan sekarang termasuk andal dan mampu meminimalisir Ground Potential Rise (GPR) di sekitar kaki tower menjadi 4,50477 volt dari besarnya arus gangguan yang mencapai 3760 ampere dan dinyatakan masih relatif aman bagi mahluk hidup di permukaan tanah pada lokasi tower. Kata kunci: sistem pentanahan tower, SUTT 150 kV, arus gangguan, keandalan
Load Distribution On The Expansion Of The Medium Voltage Distribution Network From Single Phase To Three Phase In Gondorio Using Etap 12.0 Enda Wista Sinuraya; Aris Triwiyatno; Bambang Winardi; arnoto arnoto
Journal of International Multidisciplinary Research Vol. 3 No. 5 (2025): Mei 2025
Publisher : PT. Banjarese Pacific Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62504/1247

Abstract

The Gondoriyo 1-phase network has a network length of 3.2 km supplied by a 1-phase network that is charged in phase S on BSB 1. The extent of the service area makes the load on phase S jump high. The measurement results obtained by the load current during peak load reached a total of 62A. While the load current of the repeater at the time of peak load is phase R of 32A, phase S of 98A, and phase T of 44A. With such conditions, it is necessary to expand the medium voltage distribution network in the Gondoriyo area with the aim of balancing the load on the BSB 1 extension. To facilitate load sharing in the expansion of the Gondoriyo area, the ETAP powerstaion 7.5.0 simulation program is used. which consists of 1 phase simulation before expansion and 3 phase simulation after expansion. From the results of this engineering shrinkage simulation, the total engineering shrinkage value in the 1-phase network before the expansion was 6480 kW, after the network expansion, the total engineering shrinkage changed to 2510.4 kW. With the simulation that has been made, it is expected to produce a load sharing plan that will make it easier for PT PLN (Persero) Rayon Boja to share the load on the network after the expansion.
Pengendalian Material Semen untuk Mengendalikan Mutu Beton Site Mix Proyek Peningkatan Jaringan Irigasi Sub Daerah Irigasi Wadaslintang Barat Andrianto, Novian; Triwiyatno, Aris; Widayat, Widayat
Jurnal Profesi Insinyur Indonesia Vol 3, No 2 (2025): JPII
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/jpii.2025.26864

Abstract

Luas daerah irigasi Wadaslintang Barat sebesar 13.186 Ha, panjang saluran primer 2,9 km, panjang saluran sekunder 113,2 km dan panjang saluran drainase 7,8 km. Dengan luas daerah irigasi, kondisi jalan akses yang tidak dapat dilalui oleh kendaraan truck concrete mixer, serta keterbatasan personel pengawasan pekerjaan di lapangan, diperlukan upaya melakukan manajemen pengaturan kualitas pekerjaan beton site mix mutu K.225 sehingga mutu yang dihasilkan sesuai dengan spesifikasi yang ditetapkan. Dalam menjaga kualiatas mutu beton, dilakukan prosedur pengendalian material semen dengan metode pengembalian sak semen kosong ke gudang semen untuk ditukar dengan semen isi. Penelitian dilaksanakan di saluran sekunder Wungu HM 47+00 sampai dengan HM 51+50. Terdapat 10 titik pengujian dengan 6 titik di atas kuat tekan 225 kg/cm2 dan 4 titik di bawah kuat tekan 225 kg/cm2. Untuk melihat hasil secara komprehensif diperlukan penelitian pengambilan sampel lokasi yang lebih banyak sehingga data yang dihasilkan lebih komprehensif.   Kata kunci: keterbatasan jalan akses, manajemen kualitas, pengendalian material 
Evaluasi Setting Relay Arus Lebih Dan Relay Gangguan Tanah Pada Gardu Induk Bawen Aris Triwiyatno; Karnoto; Bambang Winardi
urn:multiple://2988-7828multiple.v3i54
Publisher : Institute of Educational, Research, and Community Service

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sistem distribusi merupakan bagian dari sistem tenaga listrik yang berfungsi menyalurkan energi listrik ke konsumen. Penggunaan energi listrik akan terus berkembang dan hal ini mengharuskan adanya perkembangan jaringan distribusi, sehingga kerja dari sistem proteksi membutuhkan keandalan dalam menjaga peralatan penyaluran dari gangguan diantaranya gangguan hubung singkat. Oleh karena itu untuk meminimalisir gangguan tersebut diperlukan sistem proteksi yang memenuhi persyaratan sensitifitas, keandalan, selektifitas dan kecepatan, yang semuanya tergantung pada ketepatan dalam setting peralatan proteksinya. Salah satu peralatan proteksi yang digunakan adalah relai arus lebih (OCR) dan relai hubung tanah (GFR),yaitu relai yang berfungsi mengistruksikan PMT untuk membuka sehingga gangguan pada jaringan yang terganggu dapat dipisahkan dari sistem pendistribusian tenaga listrik. Pada penulisan penelitian ini akan dibahas evaluasi antara setting OCR dan GFR BWN 02 dan BWN 09 pada Gardu Induk Bawen. Hasil perbandingan setting koordinasi proteksi perhitungan dengan simulasi, menunjukkan bahwa setting koordinasi proteksi perhitungan dapat bekerja dengan baik dibanding dengan simulasi yang terpasang di Gardu Induk Bawen. Hasil perhitungan dari setting OCR pada sisi incoming di dapat nilai TMS = 0,151, sedangkan setting OCR pada sisi outgoing didapat nilai TMS = 0,127. Penyetelan GFR pada sisi incoming di dapat nilai TMS = 0,345, sedangkan setting GFR pada sisi outgoing didapat nilai TMS = 0,172. Koordinasi antar relay pada perhitungan sudah sesuai dengan standart IEC 60255 dengan granding time 0,3-0,5 detik.
Co-Authors . Widayat Achmad Abdul Jabbar Achmad Hidayatno Aditya Eka Mulyono Adrian Bela Widodo, Adrian Bela Afif Rohiki Makhtum Annas, Afif Rohiki Makhtum Afrino, Rendi Afrisal, Hadha Aghus Sofwan Agung Imam Rahmanto, Agung Imam Airlangga, Fatoni Gea Akbar, Muhamad Rizqi Al Vandy Reactor Muhammad Albab, Muhamad Edwin Aldo Dwi Yuniar, Aldo Dwi Alfrian Dwi Vamiko Amali, Fariz Nur Andhika Dwipradipta Andreas Surya, Andreas Andrianto, Novian Anggita P. Septiani Antonius Rajagukguk, Antonius Ari Santoso Ari Santoso Ari Santoso Arie Wibowo Arif Fadllullah Arif Widagdo Arifyanto, Aziz Nur Arigusman, Revalgi Ilham Aristya Panggi Wijaya Arnes Yuli Vandika arnoto arnoto Arsyad Arsyad ashegaf, farhan taufiqurrahman Azis, Muhammad Abdul Bagus Okto Tetuko Prasetyawan Bambang Winardi Bambang Winardi Bayu Gigih Prasetyo Bimantoro, Benediktus Bryan Budi Setiyono Budi Setiyono Budiman, Achmad Catur Ardy Bayu Pamungkas Darjat Darjat Dino Budi Prakoso, Dino Budi Ditya Satriya Nugroho Hadi Edo Herwinantyo, Edo Enda Wista Sinuraya Enda Wista Sinuraya Erwin Nashrullah Esa Apriaskar Ezufatrin Ezufatrin, Ezufatrin Fadilah, Aldi Nur Fahmi Rezza Djuliandri, Fahmi Rezza Fahreza Yusril Mahendra Fatimah Avtur Alifia Fauzan Akbar Fergy Romadhany Gunawan, Khoe Happy Habiby, Jawwad Sulthon Hafidz Aly Hidayat Hanif, Muhammad Harisuddin Helmi, Andy Saputra I Nyoman Sutantra I Nyoman Sutantra Ilham Bayu Pratama Putra IMAM SANTOSO Iwan Setiawan Iwan Setiawan Judijanto, Loso Junaedi Junaedi Karnoto Karnoto . Kartojo, Ismail Hartanto Kurniawan Kurniawan Kurniawan Nur Aryadi, Kurniawan Nur Kurniawan, Akhmad Riko Kurniawan, Yuniar Dwi Aman Laksmita, Aurelia Ketawang Tunjung Lanang Febriramadhan, Lanang Lathifah Alfat, Lathifah Lestari, Dwi Fitri Luthfi Gani Hakim M Arif Syukur D Mado, Ismit Maman Soemantri, Maman Meilia Safitri Mochammad Facta Mohammad Adhitama Mohammad Nuh Muarif Fandhi A, Muarif Fandhi Muhamad Iqbal Muhammad Aminullah, Muhammad Muhammad Danang Nuralamsyah Muhammad Fadli Nasution Muhammad Fajri Nur Reimansyah Muhammad Fathul Faris Muhammad Manshur, Muhammad Muhammad Supono Kurniawan Mulyono, Aditya Eka Munawar Agus Riyadi Naipospos, Bonaventura Naipospos, Bonaventura Ananda Daniel Nasution, Ali Napiah Novita Siti Lestari Nugroho, Wisnu Dyan Oddy Permana Putra Sinaga, Oddy Permana Oka Danil Saputra Oni Bagus Pardomuan, Andre Parsada, Hamka Putra Perdana, Atha’ Dwira Pradana, Anindita Panji Pradipta Megantara Praptiandari Raras Puspitasari, Praptiandari Raras Pratama, Syahrizal Yudha Edhi Puguh Gambiro Putra, Dhamastya Adhi Putri Ade Riswanti R Rizal Isnanto R. Rizal Isnanto R. Sapto Hendri Boedi Soesatyo Raditya Naufal Fathoni Ragil Aji Prastomo Rahardian, Sekardwita Rahmadani, Taufik Reimansyah, Muhammad Fajri Nur Reza Dwi Imami Ridla Setya Nur Armina Rio Agung Prabowo Rio Agung Prabowo Risyandi, Deri Rizky Adi Nugraha Rizqi Prayogo Pangestu, Rizqi Prayogo Rofiq Cahyo Prayogo, Rofiq Cahyo Rosdiana Fajar Mardhika, Rosdiana Fajar Saktian, Farsa Adhy Sapto Nisworo Scenda Bernados Purba Seftalia, Tania Silvano, Kennaldo Soelistianto, Farida Arinie Sofyan Sofyan Solichudin Solichudin Sonya Fitri Situmorang, Sonya Fitri Sucron Handoko Sudjadi Sudjadi Sumardi . Supriyo Supriyo Susatyo Handoko Susdarminasari Taini TATI NURHAYATI Taufiq Rachmadi Putra Tejawijaya, Dennis Trias Andromeda Trio Bowo Setiyo Vega Pradana Rachim Wahyudi Wahyudi Wicaksono, Andika Dwi Winahyu, Raden Rara Kartika Kusuma Yoga Adi Candra, Yoga Adi Yonatan Riyaneka Putra Yosua Alvin Adi Soetrisno Yulyanto Adi Prabowo Yuslam Aditya Medikantoro, Yuslam Aditya Yusuf Yusuf Zulkarnain Zulkarnain