Tower Crane Productivity Analysis on Apartment Development Projects Maddeppungeng, Andi; Asyiah, Siti; Intari, Dwi Esti; Setiawati, Dwi Novi; Ujianto, Rifky; Gibran, Achmad
Jurnal Fondasi Vol 13, No 1 (2024)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/fondasi.v13i1.24841

Abstract

The development of infrastructure technology in Indonesia has seen a significant and rapid growth. Along with this advancement, the number of construction projects has also increased, thanks to the availability of advanced tools and equipment. In construction projects, it is crucial to adhere to the agreed-upon design and complete the work within the designated timeframe. This ensures that there are no setbacks or delays in the construction process. The objective of this study is to determine the types of Tower Crane heavy equipment used, assess the productivity of the Tower Cranes, and identify the optimal positioning for the Tower Cranes. This research was conducted on the Juanda-Bekasi Transpark Area Development Project. Based on the analysis results, it was found that the project utilizes three Tower Cranes of the C7030-12T type. Tower Crane 1 exhibited the highest productivity, with a value of 3326.3881 kg/hour. Tower Crane 3 had a productivity value of 3286.3825 kg/hour, while Tower Crane 2 had a productivity value of 2069.2752 kg/hour. The highest productivity value for Tower Crane 1 was recorded on September 28, at 4662.57 kg/hour. For Tower Crane 2, the highest productivity value was observed at 2919.52 kg/hour. Tower Crane 3 achieved its highest productivity value on September 8, at 5341.45 kg/hour. Among the three simulations conducted in this study, the optimal configuration for Tower Crane placement was obtained in the second simulation, which involved using two Tower Cranes.
Project Delay Analysis Using Fault Tree Analysis (FTA) Method And Failure Mode And Effect Analysis (FMEA) Method (Case Study of the Karian Rangkasbitung Dam Development Project) Maddeppungeng, Andi; Asyiah, Siti; Ujianto, Rifky; Akbar, Bagus Istigosah; Setiawati, Dwi Novi
Jurnal Fondasi Vol 12, No 1 (2023)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/fondasi.v12i1.19545

Abstract

The Karian Dam Project is one of a total of 48 dam construction strategic projects in Indonesia that have experienced delays. Based on Addendum 6, the Karian Dam Project is targeted for completion in March 2021. However, the Karian Dam Project experienced delays in several works. This study discusses the factors of delay, the location of the risk of delay, and the work item assistance that causes delays in the Karian Dam Project. The research method used in this study is a quantitativ. Data collection was carried out using questionnaires and interviews. The obtained data is then analyzed using the Fault Tree Analysis (FTA) method to find the source of risk that is the cause of the delay. The subsequent analysis uses the Failure Mode and Effect Analysis (FMEA) method to assess the risks that have been identified using the FTA method for risk capture. According to the findings, there are 47 potential sources of delay in the FTA method. After calculating the probability index, it is found that activity A9-1 (planning and implementation) has the highest probability index value of 4. The FMEA method obtains the highest value of the highest Risk Priority Number (RPN) there is R-42 (planning change) with an RPN value of 64, and on arrest risk using the search risk matrix, as many as 9 risks are at high risk (high risk).
Analysis of Knowledge and Ability of Building Construction Workers on Attitudes on Work Accident Risk Maddeppungeng, Andi; Ujianto, Rifky; Setiawati, Dwi Novi; Intari, Dwi Esti; Asyiah, Siti; Enjelina, Ella
Jurnal Fondasi Vol 13, No 1 (2024)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/fondasi.v13i1.24842

Abstract

Construction work, especially building construction, has a high risk of work accidents, because it involves many elements. Now in building construction projects, the importance of knowledge about K3 and the ability of workers has become a basic need. Attitudes towards occupational safety also have an important role, because they can reflect the level of attention a person has to work safety aspects. The purpose of this study is to determine and analyze whether the knowledge and ability of building construction workers affect attitudes on accident risk. The approach applied is an associative approach. The population in this study is individuals involved in building construction, with the total population obtained is 44 respondents. Data is collected through the use of online questionnaires through the Google Form platform. After that, the data was analyzed using SEM-PLS 4.0 software. The results showed that there was a positive and significant influence between workers' knowledge of attitudes with a path coefficient value of 0.348. There is a positive and significant influence between the ability of workers to attitudes with a path coefficient value of 0.484. There is a moderate influence between workers' knowledge and ability on attitudes, as evidenced by the R2 value obtained 0.598.
Pedestrian Facility Needs Analysis at the Faculty of Engineering Campus, Sultan Ageng Tirtayasa University Ujianto, Rifky; Syahid, Mush'ab Abdu Asy; Intari, Dwi Esti; Budiman, Arief; Irlana, Zidan
Jurnal Fondasi Vol 13, No 1 (2024)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/fondasi.v13i1.24908

Abstract

This research discusses pedestrian facilities at the Faculty of Engineering Campus of Sultan Ageng Tirtayasa University located in Cilegon City, there are no adequate pedestrian facilities so it is necessary to analyze pedestrian facilities which aim to determine the type of pedestrian facilities used at the Faculty of Engineering Campus of Sultan Ageng Tirtayasa University and create a pedestrian facility design at the Faculty of Engineering Campus of Sultan Ageng Tirtayasa University. Analyzing the needs of this pedestrian facility uses guidelines from the Ministry of PUPR Regarding Technical Planning of Pedestrian Facilities in 2018 and to design pedestrian facilities using sketchup software. The result of this study is that the pedestrian facilities produced in the form of a pelican cross based on the formula  produces  on average with P = 79 people / hour, V = 8461 (vehicles / hour) then produce is (6 x )  and the effective width of the sidewalk inside the Faculty of Engineering Campus of Sultan Ageng Tirtayasa University is 1.5 meters, these results are adjusted to the 2018 Ministry of PUPR guidelines. 
Analysis of the Implementation of the Occupational Safety and Health (K3) System and the Implementation of Risk Management in the Cipunten Agung Hilir River Flood Handling Construction Project, Labuan District Maddeppungeng, Andi; Asyiah, Siti; Setiawati, Dwi Novi; Ujianto, Rifky; Priyatno, Yusup
Jurnal Fondasi Vol 12, No 1 (2023)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/fondasi.v12i1.19544

Abstract

Construction projects require working time specifications that need to be completed in a short time. But in practice, some interfere with the implementation. This study aims to determine whether the OHS system has been implemented in construction projects. The applications of risk management in construction projects. This study was conducted as part of the Shipunten Agung Hill River Flood Management Project in the Labuan District. The method used is the distribution of questions to be filled out by respondents who are involved in projects in the OHS Section. The type of research in this research is quantitative. Quantitative research is research that distributes surveys in the form of questionnaires to respondents and the data is processed to determine the correlation between the results of the data obtained. Processing data in this study using SPSS v.20 software to test simple linear regression analysis. The results showed that the K3 system had been applied to the project by 64.8%. The most dominant variable affecting the implementation of the OHS system and the application of risk management in construction projects is that signs/signs/information about the project have been installed around the project site with a coefficient value of 6,053 and the variable that has the lowest effect on the application of the OHS system and the application of risk management to the project. 
Implementasi kampung berwawasan lingkungan melalui penyebaran e-poster lingkungan hidup di Kelurahan Pajang Kota Tangerang Fathonah, Woelandari; Mina, Enden; Kusuma, Rama Indera; Wigati, Restu; Ujianto, Rifky; Budiman, Arief; Priyambodho, Bambang Adhi; Arum, Amalia Syarifah; Setiawati, Dwi Novi
Civil Engineering for Community Development (CECD) Vol 2, No 2 (2023): EDISI OKTOBER 2023
Publisher : Department of Civil Engineering Faculty of Engineering, Universitas Sultan Ageng Tirtayasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/cecd.v2i2.22072

Abstract

Kampung berwawasan lingkungan merupakan bagian penting dari upaya pelestarian lingkungan dan pembangunan berkelanjutan. Salah satu cara untuk meningkatkan kesadaran lingkungan di tingkat desa adalah membagikan e-poster lingkungan hidup. Kegiatan ini bertujuan untuk menguraikan penerapan praktik kampung berwawasan lingkungan melalui penyebaran e-poster sehingga dapat meningkatkan kesadaran warga terhadap lingkungan. Kegiatan pengabdian ini dilakukan di Kelurahan Pajang, Kota Tangerang, Provinsi Banten. Metode yang digunakan adalah metode observasi (pengamatan langsung) di lapangan kemudian mendesain e-poster berkaitan dengan lingkungan hidup untuk dibagikan kepada warga setempat. Hasil dari kegiatan pengabdian adalah penyebaran e-poster cukup efektif terhadap peningkatan partisipasi masyarakat dalam upaya pelestarian lingkungan. Environmentally friendly villages are an important part of preserving the environment and sustainable development. One way to increase environmental awareness at the village level is to distribute environmental e-posters. This activity aims to explain the implementation of environmentally sound village practices through the distribution of e-posters to increase residents' awareness of the environment. This service activity occurred in Pajang Village, Tangerang City, Banten Province. The method used is the observation method (direct observation) in the field and then designing e-posters related to the environment to be distributed to residents. The result of the service activities is that the distribution of e-posters is quite effective in increasing community participation in environmental conservation efforts.
Rekomendasi Teknis Pemugaran Struktur dan Situs Heritage Makam Kapiten Cina Oey Kiat Tjin, Kota Tangerang Syahid, Mushab Abdu Asy; Subekti, Subekti; Darwis, Zulmahdi; Priyambodho, Bambang Adhi; Ujianto, Rifky; Baehaki, Baehaki
Civil Engineering for Community Development (CECD) Vol 3, No 1 (2024): Edisi April 2024
Publisher : Department of Civil Engineering Faculty of Engineering, Universitas Sultan Ageng Tirtayasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/cecd.v1i2.25033

Abstract

Pelindungan dan pengembangan struktur dan situs warisan budaya (heritage)  di Indonesia untuk kepentingan agama, pendidikan, dan pariwisata membutuhkan perhatian teknis demi mempertahankan keberlanjutan dan keberdirian wujud fisiknya. Artikel ini menjelaskan implementasi kepakaran disiplin ilmu rekayasa struktur-konstruksi dan arsitektur melalui pembantuan konsultasi praktik preservasi dan konservasi objek Cagar Budaya di Makam Kapiten Cina Oey Kiat Tjin di Kota Tangerang, Provinsi Banten. Kegiatan ini menghasilkan rekomendasi konseptual dan teknis sebagai landasan ilmiah sebelum pemugaran, meliputi penataan area makam, restorasi bangunan makam, dan rehabilitasi nisan. Metode observasi dan kunjungan lapangan melibatkan ekskavasi, dokumentasi, dan diskusi selaku narasumber kegiatan yang diselenggarakan Balai Pelestarian Kebudayaan Wilayah VIII Kemendikbudristek. Program ini akan bermanfaat untuk pemerintah daerah dan masyarakat umum selaku agen pelestari warisan budaya komunitas Cina Benteng di Kota Tangerang.
Sosialisasi pengetahuan kasus perundungan (bullying) pada anak sekolah dasar di Desa Cibuah Kusuma, Rama Indera; Mina, Enden; Fathonah, Woelandari; Wigati, Restu; Ujianto, Rifky; Abdurrohim, Abdurrohim; Aditya, Zulfan
Civil Engineering for Community Development (CECD) Vol 2, No 2 (2023): EDISI OKTOBER 2023
Publisher : Department of Civil Engineering Faculty of Engineering, Universitas Sultan Ageng Tirtayasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/cecd.v2i2.21822

Abstract

Desa Cibuah berada di Kecamatan Warunggunung Kabupaten Lebak Provinsi Banten. Mata pencaharian penduduknya sebagian besar bergerak dalam sektor pertanian, perikanan, dan peternakan. Kegiatan Pendidikan yang ada di Desa Cibuah yaitu kelompok bermain (playgroup), TK, SD, SMP, dan SMA. Salah satu fenomena interaksi antar siswa di sekolah yang kadang dianggap lumrah oleh hampir seluruh manajemen sekolah ataupun masyarakat yaitu perundungan. Padahal, perundungan merupakan tindakan destruktif. Oleh karena itu, perlu dilakukan sosialisasi mengenai kategori tindakan-tindakan perundungan kepada masyarakat khususnya manajemen sekolah yang ada di Desa Cibuah. Sosialisasi ini dilaksanakan di SDN 1 Cibuah, dengan narasumber dari pihak BKKN Kabupaten Lebak. Kegiatan sosialisasi ini diharapkan dapat menumbuhkan perhatian masyarakat dan manajemen sekolah terhadap kegiatan perundungan sehingga dapat dicegah agar dapat menciptakan aktivitas kegiatan pendidikan yang kondusif. Cibuah Village is in Warunggunung District, Lebak Regency, Banten Province. Most of the population's livelihoods are in the agricultural, fishing, and livestock sectors. Educational activities in Cibuah Village are playgroups, kindergarten, elementary school, middle school, and high school. One phenomenon of interaction between students at school, which is sometimes considered normal by almost all school management and society, is bullying. Bullying is a destructive act. Therefore, it is necessary to disseminate information about the categories of bullying actions to the community, especially school management in Cibuah Village. This socialization was done at SDN 1 Cibuah with resource persons from the Lebak Regency BKKN. It is hoped that this socialization activity can raise the attention of the community and school management towards bullying activities so that they can be prevented to create conducive educational activities.
Pemanfaatan Bambu pada Hand Railing di Akses Wisata Curug Leuwi Jatatan Suzanti, Wiwien; Maddeppungeng, Andi; Ujianto, Rifky; Damanik, Mariana Feronica; Nabila, Firyaal; Nofiana, Tiara; Kurniawan, Feri
Civil Engineering for Community Development (CECD) Vol 3, No 2 (2024): Edisi Oktober 2024
Publisher : Department of Civil Engineering Faculty of Engineering, Universitas Sultan Ageng Tirtayasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/cecd.v3i2.29048

Abstract

Desa Bantarwangi merupakan desa disemenanjung Kabupaten Serang. Desa Bantarwangi memiliki luas wilayah sebesar 3099 ha desa di semenanjung Kabupaten Serang letaknya yang berdekatan dengan laut menjadi daya ikat masyarakat luas untuk melakukan kegiatan berlibur maupun rekreasi. Curug Leuwi Jatatan yang berada di Desa Bantarwangi tepatnya di Kampung Calung yang juga merupakan sumber kegiatan cuci kakus bagi warga Desa Bantarwangi. Potensi Desa yang kaya akan kawasan wisata sudah seharusnya diperhatikan oleh pemerintah maupun masyarakat terutama pada akses jalan dan fasilitasnya. Penting diperhatikan dalam hal ini adalah akses menuju Kawasan Curug Leuwi Jatatan dimana akses jalan yang terjal dan curam menjadi perhatian bagi civitas akademik. Berkolaborasi dengan mahasiswa Universitas Bina Bangsa berkontrubusi untuk masyarakat Desa Bantarwangi dengan membangun Hand Railing atau pagar tangan yang berbahan dasar bambu sebagai penunjang keselamatan pengunjung Curug Leuwi Jatatan menjadi tujuan pengabdian kepada masyarakat. Dengan menggunakan metode Plugin/ Bolt Connection yang merupakan sambungan batang yang saling bersilangan diharap pemanfaatan bambu ini dapat dirasakan oleh masyarakat maupun pengunjung. Semoga dengan adanya karya dari civitas akademik ini dapat bermanfaat dan menjadi bentuk karya yang alami dari alam untuk alam serta dirasakan oleh masyarakat maupun pengunjung Curug Leuwi Jatatan.
Analysis of Time and Cost Acceleration with Crashing Method on Apartment Construction Project in Bekasi City Maddeppungeng, Andi; Asyiah, Siti; Intari, Dwi Esti; Ujianto, Rifky; Damanik, Mariana Feronica; Ashidiq, Alifian Taufiq
Jurnal Fondasi Vol 13, No 2 (2024)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36055/fondasi.v13i2.29034

Abstract

In the implementation of construction projects, problems are often found, such as delays. One of the solutions is by accelerating. Acceleration is not only done to overcome delays, but can also be done if there is a special request from the owner. This study discusses the acceleration of time and cost using the crashing method in an apartment construction project in Bekasi City, which aims to determine the optimal time and cost of the three alternatives used. The work that is accelerated is some structural work that is on the critical path. Acceleration is carried out with three alternatives, namely the addition of working hours, the addition of labor, and the combination of additional working hours and additional labor. The results showed that with the alternative of adding working hours, the implementation time was 298 days at a cost of Rp. 140,751,032,332, obtaining a time efficiency of 5.7% and a cost efficiency of 0.42%. With the alternative of adding labor, the implementation time is 292 days at a cost of Rp. 140,092,976,595, 7.59% time efficiency and 0.89% cost efficiency are obtained. With the alternative of adding working hours and additional labor, the implementation time is 290 days at a cost of Rp. 139,912,527,724, 8.23% time efficiency and 1.02% cost efficiency are obtained. Then it can be concluded that the alternative with the most optimal time and cost is the combined alternative of adding working hours and adding labor.
Co-Authors Abdurrohim, Abdurrohim Aditya, Zulfan Ahmad Fauzan Ardiansyah Akbar, Bagus Istigosah Andi Maddeppungeng Annisa Rahman Tabrani Putri Arum, Amalia Syarifah Ashidiq, Alifian Taufiq Ashidiq, Alifian Taufiq Asy Syahid, Mush'ab 'Abdu Asyiah, Siti Asyiah, Siti Asyiah, Siti Asyiah, Siti Baehaki, Baehaki Bambang Adhi Priyambodho Bayu Krisna Wisnulingga Budiman, Arief Budiman, Arief Damanik, Mariana Feronica Damanik, Mariana Feronica Damanik, Mariana Feronica Damanik, Mariana Feronica Darwis, Zulmahdi Dharmawan, Yoga Dwi Esti Intari Dwi Novi Setiawati Dwi Novi Setiawati Enden Mina, Enden Enjelina, Ella Fahrus Sabri Fathonah, Woelandari Gibran, Achmad Graciela Febriyanti Zulfa Haryadi Haryadi Hendrian Budi Bagus Kuncoro Hendrian Budi Bagus Kuncoro Heri Kusharyanto Heri Mulyono Intari, Dwi Esti Intari, Dwi Esti Intari, Dwi Esti Intari, Dwi Esti Iqbal Syaichurrozi Irlana, Zidan Ivandhika Rizal Ardiansyah Kulsum Kulsum Kurniawan, Feri Maddeppungeng, Andi Maddeppungeng, Andi Maddeppungeng, Andi Maddepunggeng, Andi Mariana Feronica Damanik Marsa Fella Mina, Enden Mina, Enden Muhammad Abdullah Mush'ab 'Abdu Asy Syahid Mush'ab 'Abdu Asy Syahid Mushab Abdu Asy Syahid Nabila, Firyaal Ngakan Putu Purnaditya Ngakan Putu Purnaditya Nuniek Hermita Priyambodho, Bambang Adhi Priyambodho, Bambang Adhi Priyatno, Yusup Qurrotul Milania Rama Indera Kusuma Restu Wigati Restu Wigati Restu Wigati, Restu Rindu Twidi Bethary, Rindu Twidi Sarrobi Kamal Setiawati, Dwi Novi Setiawati, Dwi Novi Setiawati, Dwi Novi Setiawati, Dwi Novi Siti Asyiah Siti Asyiah Soedarsono Soedarsono Soelarso Soelarso, Soelarso Subekti Subekti Subekti, Subekti Suzanti, Wiwien Syahid, Mush'ab Abdu Asy Syahid, Mushab Abdu Asy Syahid, Mushab Abdu Asy Syarahbil, Syarahbil Tiara Nofiana Wigati, Restu Wigati, Restu