Analysis of Worker Productivity with Time Study Method on Column Work Setiawati, Dwi Novi; Intari, Dwi Esti; Asyiah, Siti; Maddepunggeng, Andi; Ujianto, Rifky; Syahid, Mushab Abdu Asy; Damanik, Mariana Feronica; Dharmawan, Yoga
Jurnal Fondasi Vol 14, No 1 (2025)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62870/fondasi.v14i1.32143

Abstract

This research discusses the value of worker productivity in building column work, there are several factors that affect the value of worker productivity, the value of productivity will affect various aspects of construction projects, including completion time, cost, and quality, therefore the organizers of construction projects must know the value of worker productivity when doing work. The research was conducted by conducting field observations to obtain column work time which was then analyzed using the Time Study method to determine the value of worker productivity and work costs. The results showed that the productivity value of Pamulang University column work was obtained in column reinforcement work of 544.07 kg/OH, in column formwork work of 42.01 m2/OH, in column casting work of 57.05 m3/OH, and in formwork dismantling work of 170.38 m2/OH. Factors that hinder productivity in Pamulang University column work, namely in column reinforcement work is the number of workers, in column formwork work is the number of workers and the position of workers, in column casting work is the number of workers, and in column formwork dismantling work is the position of workers and the number of workers. The cost required per column in the Pamulang University Development project is Rp6,727,870.00.
Analysis of Construction Safety Management System Based on the Ministry of Public Works and Housing Regulation No.10 of 2021 (Case Study: Basement Construction Project of the Great Mosque of Serang City) Asyiah, Siti; Ujianto, Rifky; Asy Syahid, Mush'ab 'Abdu; Setiawati, Dwi Novi; Damanik, Mariana Feronica; Syarahbil, Syarahbil
Jurnal Fondasi Vol 14, No 1 (2025)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62870/fondasi.v14i1.32261

Abstract

The Indonesian Government through the Minister of Public Works and Housing has recently issued Regulation Number 10 of 2021 concerning guidelines for the Construction Safety Management System (SMKK). This regulation must be implemented during construction as it is part of project planning and control. The objectives of this research are to analyze the level of influence of PUPR Ministerial Regulation No.10 of 2021 on improving SMKK implementation in the basement construction project of the Great Mosque of Serang City, to identify hazards that can cause accidents in the construction work, and to determine control action plans to reduce the risk level of accidents in the Serang City Grand Mosque basement construction work. The conclusion is that PUPR Ministerial Regulation No. 10 of 2021 concerning SMKK has a significant impact. This regulation emphasizes the importance of work safety in construction projects, including the Serang City Grand Mosque basement construction. By using the Hazard Identification, Risk Assessment, Risk Control Determination, and Opportunity (IBPRP) method, potential hazards can be identified for each type of work. The identification of work risks assessed with low risk level is 23 types of work (32.41%), medium risk level is 39 types of work (54.92%), and high risk level is 9 types of work (12.67%) from a total of 71 work risks. From the analysis of risk control identification using the IBPRP table, one high-risk level work was selected, namely the first floor structure work with the sub-work of formwork dismantling and risk identification of scaffolding collapse. The risk controls identified are using support pipes to strengthen the scaffolding and installing 2-layer railings on the scaffolding, conducting toolbox meetings, safety induction, job training, and ensuring the scaffolding is safe to use, and using PPE (safety shoes, safety helmet, vest, long-sleeved work clothes, gloves, and full body harness).
Analysis of Time and Cost Acceleration with Crashing Method on Apartment Construction Project in Bekasi City Maddeppungeng, Andi; Asyiah, Siti; Intari, Dwi Esti; Ujianto, Rifky; Damanik, Mariana Feronica; Ashidiq, Alifian Taufiq
Jurnal Fondasi Vol 13, No 2 (2024)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62870/fondasi.v13i2.32711

Abstract

In the implementation of construction projects, problems are often found, such as delays. One of the solutions is by accelerating. Acceleration is not only done to overcome delays, but can also be done if there is a special request from the owner. This study discusses the acceleration of time and cost using the crashing method in an apartment construction project in Bekasi City, which aims to determine the optimal time and cost of the three alternatives used. The work that is accelerated is some structural work that is on the critical path. Acceleration is carried out with three alternatives, namely the addition of working hours, the addition of labor, and the combination of additional working hours and additional labor. The results showed that with the alternative of adding working hours, the implementation time was 298 days at a cost of Rp. 140,751,032,332, obtaining a time efficiency of 5.7% and a cost efficiency of 0.42%. With the alternative of adding labor, the implementation time is 292 days at a cost of Rp. 140,092,976,595, 7.59% time efficiency and 0.89% cost efficiency are obtained. With the alternative of adding working hours and additional labor, the implementation time is 290 days at a cost of Rp. 139,912,527,724, 8.23% time efficiency and 1.02% cost efficiency are obtained. Then it can be concluded that the alternative with the most optimal time and cost is the combined alternative of adding working hours and adding labor.
Optimizing Time and Cost of Column Formwork Work in Multi-Story Buildings Through a Zoning System (Case Study: Multimedia Nusantara School Project) Dwi Novi Setiawati; Siti Asyiah; Rifky Ujianto; Mush'ab Abdu Asy Syahid; Ahmad Fauzan Ardiansyah
Jurnal Fondasi Vol 15, No 1 (2026)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62870/fondasi.v15i1.39591

Abstract

Construction activities generally use concrete as the main material, one of which is in reinforced concrete columns that function to withstand vertical loads and distribute them to the lower parts of the structure. In the Multimedia Nusantara School project, which was carried out independently, formwork work often faced the challenge of completing the project quickly and at a low cost. Therefore, this study was conducted to examine effective and efficient work methods that reduce costs while maintaining quality, namely through the application of a zoning system. In this study, the work area was divided into two scenarios, namely 1 work zone and 2 work zones, to see the differences in their effectiveness. In addition, the types of column formwork used consisted of two types of materials, namely fiberglass formwork and conventional formwork. The main objective of this study was to determine the optimal work zone division model and to analyze the relationship and role of the zoning system in the time and cost efficiency of column formwork work. This research method was carried out using a qualitative descriptive approach using project planning data. The analysis was carried out using Microsoft Excel software to analyze the implementation time and cost estimates. The results of the study indicate that the application of two zones is the most optimal model for column formwork work. The application of the zoning system directly affects the relationship between time efficiency and cost. The shorter the cycle time applied, the higher the implementation cost tends to be due to more intensive use of resources. Based on the analysis results, the model with 2 zones and a 7 day cycle is the most efficient option, as it can speed up completion time to 44 days with a total cost of Rp294,899,522.
Risk Analysis in Public–Private Partnership (PPP) Schemes for Infrastructure Development in Indonesia: A Case Study of the Serang–Panimbang Toll Road Project, Section 2 Siti Asyiah; Rifky Ujianto; Mush'ab 'Abdu Asy Syahid; Dwi Novi Setiawati; Annisa Rahman Tabrani Putri
Jurnal Fondasi Vol 15, No 1 (2026)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62870/fondasi.v15i1.39689

Abstract

The limited capacity of the State Budget (APBN) to finance infrastructure development has led to a significant funding gap that must be addressed. To overcome this challenge, the Government has adopted an alternative financing scheme known as Public–Private Partnership (PPP). PPP is defined as a collaborative arrangement between the Government and private entities in the provision of infrastructure aimed at serving public interests. This study aims to identify the risks associated with the implementation of the PPP scheme in the Serang–Panimbang Toll Road Project, Section 2, and to determine appropriate strategies for risk mitigation and response. The research employs a quantitative approach using descriptive analysis. Risk assessment is conducted by comparing the Severity Index and the Probability Index to determine the level of risk. The results show that the majority of identified risks fall into high and extreme categories, with 15 variables classified as extreme risk, 23 variables as high risk, and 1 variable as moderate risk. The most critical risks are related to land acquisition, project scope changes, limited working space, geological conditions, and permitting processes, particularly during the pre-construction and construction phases. Mitigation strategies emphasize the importance of contractual clarity, stakeholder coordination, technical investigation, and financial preparedness, with several risks requiring shared responsibility between the government and private sector. These findings highlight the importance of proactive and integrated risk management to improve the performance and sustainability of PPP-based infrastructure projects.
REVITALISASI SATUAN PENDIDIKAN SEKOLAH KHUSUS DI KABUPATEN LEBAK Rindu Twidi Bethary; Dwi Esti Intari; Rifky Ujianto; Woelandari Fathonah; Mush'ab 'Abdu Asy Syahid; Subekti Subekti; Bayu Krisna Wisnulingga; Iqbal Syaichurrozi
Civil Engineering for Community Development (CECD) Vol 5, No 1 (2026): Edisi April 2026
Publisher : Department of Civil Engineering Faculty of Engineering, Universitas Sultan Ageng Tirtayasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62870/cecd.v5i1.41315

Abstract

Kebijakan strategis pemerintah dalam menyamaratakan dan meningkatkan kualitas sarana prasarana pada jenjang pendidikan dasar salah satunya diwujudkan melalui Program Revitalisasi Satuan Pendidikan pada sekolah luar biasa (SLB). Pengabdian kepada masyarakat melalui revitalisasi dengan tujuan utama memastikan bahwa revitalisasi infrastruktur SLB dilaksanakan secara tepat mutu, waktu, dan sasaran, serta mampu meningkatkan kapasitas teknis satuan pendidikan dalam mengelola pembangunan secara mandiri dan akuntabel. Kegiatan pengabdian masyarakat ini menerapkan pendekatan partisipatif dan berbasis solusi yang dilaksanakan SkhN 03 Lebak selama 6 bulan dimulai dari bulan Juli 2025 sampai dengan Desember 2025. Pengumpulan data dilakukan melalui wawancara dengan kepala sekolah, survei kondisi fisik bangunan, pengukuran dimensi bangunan serta analisa kesesuaian jadwal dan anggaran biaya. Melalui kegiatan pengabdian ini perguruan tinggi diharapkan dapat memberikan pendampingan yang profesional, akuntabel, dan tepat waktu kepada satuan pendidikan penerima bantuan. Sehingga menciptakan lingkungan belajar yang aman, nyaman, dan layak, sehingga berkontribusi positif terhadap peningkatan mutu pendidikan.
FOCUS GROUP DISCUSSION PENATAAN KONSEP WISATA DESA BUDAYA BERBASIS LOCAL ADVANTAGE KELURAHAN PABEAN KOTA CILEGON BANTEN Rifky Ujianto; Rama Indera Kusuma; Restu Wigati
JMM (Jurnal Masyarakat Mandiri) Vol 8, No 1 (2024): Februari
Publisher : Universitas Muhammadiyah Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31764/jmm.v8i1.19615

Abstract

Abstrak: Penetapan Kelurahan Pabean sebagai desa budaya, berdasarkan surat keputusan Wali Kota Cilegon nomor 140/Kep.281-Dindik/2022, menjadi titik tolak untuk mengembangkan potensi wisata lokal di Kota Cilegon. Untuk itu diperlukan identifikasi potensi yang menonjol di kelurahan Pabean. Pertanian,perkebunan, industri rumah tangga,budaya lokal , wisata religi ,atraksi kesenian yang kemudian akan dipetakan dalam sebuah kegiatan focus groups discussion wisata desa budaya. Isu strategis dan permasalahan diharapkan dapat teridentifikasi dengan tepat melalui kegiatan pengabdian masyarakat sehingga destinasi desa budaya dapat diwujudkan. Metode pendekatan deskriptif kuantitatif, in depth interview, participatory mapping terhadap objek potensi desa dipetakan berdasarkan data dasar potensi budaya setempat dengan melibatkan unsur lembaga: Bappedalitbang, Dinas Pendidikan dan Kebudayaan, Dinas Perumahan dan Kawasan Permukiman, Camat, Lurah, LPPM Untirta, Kelompok Sadar Budaya (Pokdarbud), kelompok masyarakat, tokoh masyarakat dan tokoh pemuda serta PKK. Hasil keputusan disepakati dalam dokumen berita acara focus groups discussion (FGD) tanggal 11 September 2023 yang dihadiri 21 orang para pemangku kepentingan, dimana kegiatan FGD telah 100% selesai dilaksanakan.Abstract: The designation of Pabean Village as a cultural village, based on the Cilegon Mayor's decree number 140/Kep.281-Dindik/2022, is the starting point for developing local tourism potential in Cilegon City. For this reason, it is necessary to identify prominent potential in the Pabean sub-district. Agriculture, plantations, home industry, local culture, religious tourism, artistic attractions will then be mapped in a focus group discussion activity on cultural village tourism. It is hoped that strategic issues and problems can be identified correctly through community service activities so that cultural village destinations can be realized. Quantitative descriptive approach methods, in-depth interviews, participatory mapping of village potential objects are mapped based on basic data on local cultural potential by involving institutional elements: Bappedalitbang, Education and Culture Service, Housing and Settlement Area Service, Subdistrict Head, Village Head, LPPM Untirta, Cultural Awareness Group (Pokdarbud), community groups, community leaders and youth leaders as well as the PKK. The results of the decision were agreed in the focus group discussion (FGD) minutes document on September 11 2023 which was attended by 21 stakeholders, where the FGD activities had been 100% completed. 
Co-Authors Abdurrohim, Abdurrohim Aditya, Zulfan Ahmad Fauzan Ardiansyah Akbar, Bagus Istigosah Andi Maddeppungeng Annisa Rahman Tabrani Putri Arum, Amalia Syarifah Ashidiq, Alifian Taufiq Ashidiq, Alifian Taufiq Asy Syahid, Mush'ab 'Abdu Asyiah, Siti Asyiah, Siti Asyiah, Siti Asyiah, Siti Baehaki, Baehaki Bambang Adhi Priyambodho Bayu Krisna Wisnulingga Budiman, Arief Budiman, Arief Damanik, Mariana Feronica Damanik, Mariana Feronica Damanik, Mariana Feronica Damanik, Mariana Feronica Darwis, Zulmahdi Dharmawan, Yoga Dwi Esti Intari Dwi Novi Setiawati Dwi Novi Setiawati Enden Mina, Enden Enjelina, Ella Fahrus Sabri Fathonah, Woelandari Gibran, Achmad Graciela Febriyanti Zulfa Haryadi Haryadi Hendrian Budi Bagus Kuncoro Hendrian Budi Bagus Kuncoro Heri Kusharyanto Heri Mulyono Intari, Dwi Esti Intari, Dwi Esti Intari, Dwi Esti Intari, Dwi Esti Iqbal Syaichurrozi Irlana, Zidan Ivandhika Rizal Ardiansyah Kulsum Kulsum Kurniawan, Feri Maddeppungeng, Andi Maddeppungeng, Andi Maddeppungeng, Andi Maddepunggeng, Andi Mariana Feronica Damanik Marsa Fella Mina, Enden Mina, Enden Muhammad Abdullah Mush'ab 'Abdu Asy Syahid Mush'ab 'Abdu Asy Syahid Mushab Abdu Asy Syahid Nabila, Firyaal Ngakan Putu Purnaditya Ngakan Putu Purnaditya Nuniek Hermita Priyambodho, Bambang Adhi Priyambodho, Bambang Adhi Priyatno, Yusup Qurrotul Milania Rama Indera Kusuma Restu Wigati Restu Wigati Restu Wigati, Restu Rindu Twidi Bethary, Rindu Twidi Sarrobi Kamal Setiawati, Dwi Novi Setiawati, Dwi Novi Setiawati, Dwi Novi Setiawati, Dwi Novi Siti Asyiah Siti Asyiah Soedarsono Soedarsono Soelarso Soelarso, Soelarso Subekti Subekti Subekti, Subekti Suzanti, Wiwien Syahid, Mush'ab Abdu Asy Syahid, Mushab Abdu Asy Syahid, Mushab Abdu Asy Syarahbil, Syarahbil Tiara Nofiana Wigati, Restu Wigati, Restu