Claim Missing Document
Check
Articles

Estimasi Risiko Kegagalan Dan Penentuan Umur Ekonomis Mesin Injeksi Plastik Dengan Menggunakan Metode Risk Based Maintenance (rbm) Dan Replacement Analysis Di Cv Xyz Mohammad Tajudin; Judi Alhilman; Endang Budiasih
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak CV XYZ merupakan perusahaan yang memproduksi spare part dari shockbreaker yaitu spring guide. Mesin yang digunakan CV XYZ untuk memproduksi spare part tersebut adalah mesin Injeksi Plastik. Mesin Injeksi Plastik memiliki peranan penting dalam mengolah bisi plastik polypropylene menjadi spring guide yang mendukung proses usaha dalam CV XYZ, apabila mesin tersebut mengalami kerusakan maka proses produksi akan berhenti dan akan menimbulkan kerugian. Untuk dapat menjaga atau mengembalikan mesin agar tetap beroperasi sesuai dengan fungsinya maka dapat dilakukan kegiatan maintenance oleh perusahaan. Metode maintenance yang digunakan dalam penelitian ini adalah Risk Based Maintenance (RBM) dan Replacement Analysis. Metode Risk Based Maintenance (RBM) digunakan untuk mengetahui nilai risiko kegagalan dari mesin Injeksi Plastik yang diterima perusahaan. Berdasarkan metode Risk Based Maintenance diperoleh nilai risiko sebesar Rp 439,313,212. Metode Replacement Analysis digunakan untuk menentukan kebijakan kapan mesin Injeksi Plastik harus dilakukan penggantian dan umur ekonomis dari mesin tersebut. Berdasarkan metode Replacement Analysis diperoleh kebijakan waktu penggantian dan umur ekonomis dari mesin Injeksi Plastik adalah 8 tahun lagi. Kata kunci: Mesin Injeksi Plastik, Maintenance, Risk Based Maintenance, Replacement Analysis Abstract CV XYZ is a company producing spare parts of the shockbreaker that is spring guide. The machine used CV XYZ to manufacture the spare part is the Plastic Injection machine. Plastic Injection machine has an important role in the processing of plastic pellets polypropylene into a spring guide that supports the business processes in CV XYZ, if the engine is damaged then the production process will stop and will be cause any harm. To be able to keep or restore the machine to continue to operate in accordance with its function then it can be done the activities of the maintenance by the company. The method of maintenance used in this study is a Risk Based Maintenance (RBM) and Replacement Analysis. Methods of Risk Based Maintenance (RBM) is used to determine the value of the risk of failure of the Plastic Injection machine received by the company. Based on the methods of Risk Based Maintenance obtained risk value of Rp 439,313,212. The method of Replacement Analysis is used to determine the policy of when the Plastic Injection machine to do the replacement and the economic life of the machine. Based on the method of Replacement Analysis obtained policy the time of replacement and the economic life of the Plastic Injection machine is 8 years old again. Keywords: Plastic Injection Machine, Maintenance, Risk Based Maintenance, Replacement Analysis
Usulan Retirement Age Dan Jumlah Maintenance Crew Optimal Pada Mesin Huron Di Pt.xyz Menggunakan Metode Dynamic Life Cycle Cost (dlcc) Dengan Simulasi Monte Carlo Hario Ardi Nugroho; Judi Alhilman; Endang Budiasih
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT.XYZ merupakan perusahaan industri manufaktur yang bergerak dalam pembuatan alat berat untuk militer maupun komersil. Salah satu peralatan untuk menunjang kegiatan produksi PT. XYZ adalah mesin Huron yang memproduksi komponen-komponen untuk excavator, kapal, dan alat berat lainnya. Mesin Huron ini memiliki frekuensi kerusakan terbesar. Hal ini disebabkan oleh beberapa faktor, termasuk umur mesin yang sudah tidak optimal atau tidak tepatnya jumlah maintenance crew untuk menangani mesin rusak. Pada penelitian ini untuk menentukan umur mesin optimal dan jumlah maintenance crew optimal dari mesin Huron, digunakan metode DLCC dengan simulasi Monte Carlo. Nilai LCC didapat dari penjumlahan sustaining cost dan acquisition cost. Failure Mode Effect and Analysis (FMEA) atau mode kegagalan digunakan untuk menentukan pengaruhnya terhadap pengoperasian sistem yang selanjutnya dicari nilai weibull shape factor (β) dan characteristic life () sebagai input untuk disimulasikan dengan Monte Carlo sehingga didapatkan mean time to failure (MTTF) prediction mesin Huron. Selanjutnya dianalisa future maintenance cost. Berdasarkan perhitungan DLCC, diperoleh total LCC optimal sebesar Rp. 574,070,461 dengan umur mesin optimal adalah sembilan tahun dan jumlah maintenance crew optimal sebanyak satu orang. Berdasarkan hasil simulai Monte Carlo didapatkan nilai MTTF mesin Huron 391.7 jam dengan future maintenance cost yang harus dipersiapkan sebesar Rp. 270,710,759. Kata Kunci - Maintenance, Mean Time To Failure, Dynamic Life Cycle Cost, Monte Carlo Simulation, Failure Mode and Effect Analysis Abstract PT. XYZ is a manufacturing company that manufacturing in military and commercial heavy equipment products. One of the equipment used to support the production activities of PT. XYZ is a Huron MU 6 milling machine to fulfill every components needed for excavators, ships, and other heavy equipment. Huron Machine has the most frequent damage in PT. XYZ. It can be caused by several factors, including a machine that has exceeded its optimal limit. In determining optimal machine life and optimal maintenance crew of the Huron machine, in this study case is using DLCC with Monte Carlo simulation. LCC value is obtained from the sum of sustaining cost and acquisition cost. FMEA is used to identify the failure mode and determine its effect on system operation, then weibull shape factor (β) and scale factor / characteristic life ( ) are used as inputs to be simulated with monte carlo to obtained the probabilistic Huron engine's mean time to failure (MTTF) for further analyze getting future maintenance costs. Based on the calculation of DLCC, the smallest total LCC value obtained is Rp. 574,070,461 with optimal engine life is nine years and the optimal number of maintenance crew is one person. Based on the results of the Monte Carlo simulation, the value of the MTTF Huron engine is 391.7 hours with future maintenance costs which must be prepared in the amount of Rp. 270,710,759 Keywords – Maintenance, Mean Time To Failure, Dynamic Life Cycle Cost, Monte Carlo Simulation, Failure Mode and Effect Analysis
Analisis Total Biaya Minimal Pada Mesin CNC Milling PT. Sandy Globalindo Berdasarkan Metode Life Cycle Cost (LCC) Dengan Dynamic Maintenance Cost Triana Suryani; Fransiskus Tatas Dwi Atmaji; Endang Budiasih
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Maintenance adalah segala kegiatan yang bertujuan untuk menjaga peralatan dalam kondisi terbaik. Proses maintenance meliputi, pengetesan, pengukuran, penggantian, penyesuaian dan perbaikan. Maintenance terbagi menjadi 3 jenis, Preventive Maintenance, Predictive Maintenance, Breakdown Maintenance, Corrective Maintenance. Dengan melakukan perawatan serta pemeliharaan pada mesin dan fasilitas produksi, tentu memerlukan biaya. Dalam hal ini, biaya yang dikeluarkan pada saat perawatan dan pemeliharaan mesin secara terjadwal dan berkala. Untuk mengatasi biaya perawatan dan pemeliharaan yang terlalu besar, maka dilakukan pengendalian biaya dengan metode Life Cycle Cost dengan Dynamic Maintenance Cost. PT. Sandy Globalindo merupakan perusahaan swasta yang memproduksi beberapa produk spare part motor. Perusahaan ini beralamat di Jl. Gn. Satria No.2A, Pasirkaliki, Cimahi Utara, Kota Cimahi, Jawa Barat 4051. PT. Sandy Globalindo dalam usahanya memastikan mesin dapat beroperasi selama 24 jam tanpa permasalahan dalam jangka waktu yang ditentukan. PT. Sandy Globalindo memiliki kebijakan corrective dan preventife maintenance dalam mengatasi kerusakan mesin. Mesin CNC Milling merupakan salah satu dari beberapa mesin yang dimiliki oleh PT. Sandy Globalindo. Mesin ini memiliki frekuensi kerusakan yang tertinggi. Berdasarkan permasalahan yang ada akan dilakukan analisa total biaya minimal, umur optimal dan jumlah optimal maintenance set cew pada mesin CNC Milling PT. Sandy Globalindo dengan menggunakan metode Life Cycle Cost dengan Dynamic Maintenance Cost. Kata kunci: Maintenance, Mesin CNC Milling, Life Cycle Cost, Dynamic Maintenance Cost Abstract Maintenance is all activities that aim to keep the equipment in the best condition. The maintenance process includes testing, measurement, replacement, adjustment and repair. Maintenance is divided into 3 types, Preventive Maintenance, Predictive Maintenance, Breakdown Maintenance, Corrective Maintenance. By doing maintenance and maintenance on machinery and production facilities, it certainly requires a fee. In this case, the costs incurred during maintenance and maintenance of the machine are scheduled and periodic. To overcome the maintenance and maintenance costs that are too large, then cost control is carried out with the Life Cycle Cost method with Dynamic Maintenance Cost. PT. Sandy Globalindo is a private company that produces several motorbike spare parts. This company is located at Jl. Mr. Satria No.2A, Pasirkaliki, Cimahi Utara, Cimahi City, West Java 4051. PT. Sandy Globalindo in its effort to ensure the machine can operate for 24 hours without problems within the specified time period. PT. Sandy Globalindo has a corrective and preventife maintenance policy in dealing with engine damage. CNC Milling Machine is one of several machines owned by PT. Sandy Globalindo. This machine has the highest frequency of damage. Based on the existing problems, an analysis of the minimum total cost, optimal age and the optimal number of maintenance sets for the CNC Milling machine PT. Sandy Globalindo by using the Life Cycle Cost method with Dynamic Maintenance Cost. Keywords: Maintenance, Mesin CNC Milling, Life Cycle Cost, Dynamic Maintenance Cost
Analisis Nilai Daya Tarik Warranty Pendekatan Satu Dimensi Untuk Meminimalisasi Biaya Garansi Pada Produk Mesin Dryer 16kg Pemanas Lpg Di Pt Xyz Santy Agrasari; Endang Budiasih; Aji Pamoso
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Layanan purna jual diberikan oleh perusahaan sebagai strategi dalam memberikan pelayanan dan peningkatan kualitas produk kepada konsumen, yaitu garansi. Garansi diberikan berdasarkan keputusan kebijakan warranty yang sesuai. Warranty merupakan jaminan antara produsen dan konsumen bahwa produk tidak akan mengalami kegagalan selama rentang waktu tertentu. Daya tarik warranty terdiri dari tiga pengukuran antara lain masa warranty, biaya warranty, dan kebijakan warranty. Perhitungan biaya warranty dilakukan melalui pendekatan satu dimensi, hal ini dikarenakan objek penelitian yang digunakan adalah produk elektronik dimana pengukuran berdasarkan usia pemakaian produk. Uji distribusi yang terpilih menggunakan uji distribusi Weibull, dimana memiliki pola kerusakan yang tidak beraturan dan tidak dapat diprediksi. Banyaknya klaim konsumen yang diterima oleh PT XYZ pada produk Mesin Dryer 16Kg Pemanas LPG membuat perlu dilakukan peninjauan ulang mengenai pemberian masa warranty, biaya warranty, serta tindakan pemeliharaan pencegahan dengan tujuan dapat meminimalisasi biaya garansi yang dikeluarkan oleh perusahaan. Kata kunci: warranty, kebijakan satu dimensi, daya tarik warranty Abstract After-sales service is provided by the company as a strategy in providing and improving product quality to consumers, namely a guarantee. Product warranties are given after obtaining a decision on the appropriate warranty policy. Warranty is an assurance between producers and consumers that a product will not fail for a certain period of time. The warranty appeal consists of three measurements including warranty period, warranty costs, and warranty policies. We discuss about the three attractiveness of warranty with one-dimensional approach, the object of this research is electronic products, namely the product Mesin Dryer 16Kg Pemanas LPG in PT XYZ which counting by ages the product under warranty. The selected distribution test value is Weibull, which has an irregular and unpredictable pattern of damage. The number of consumer claims reveived by PT XYZ makes it necessary to review the provision of warranty period, warranty costs, and preventive maintenance measures with the aim of minimizing the warrnaty costs incurred by the company. Keywords: warranty, one-dimensional policy, attraction warranty
Usulan Kebijakan Perawatan Mesin Bartek Pada Proses Produksi Esgotado Dengan Menggunakan Metode Risk Based Maintenance (RBM) Muhammad Rayhan Islamy; Endang Budiasih; Aji Pamoso
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak ESGOTADO merupakan pabrik industri tekstil yang berada di kota Bandung dan sudah menjadi salah satu seller besar di Indonesia, banyak toko ataupun perusahaan ternama yang sudah menjadi customer tetap. Produk dari Esgotado adalah tas, baju, sepatu, dan celana tetapi yang paling unggul adalah tas. ESGOTADO memiliki 4 jenis mesin yaitu Mesin Bartek, Mesin Jahit, Mesin Sablon, dan Mesin Obras, mesin – mesin tersebut berfungsi untuk menjalankan seluruh proses produksi tetapi setiap mesin sering mengalami kerusakan yang tentunya mengakibatkan banyak kerugian untuk pabrik. Pada penelitian kali ini penulis memilih Mesin Bartek sebagai objek karena Mesin tersebut digunakan untuk seluruh proses produksi dan mempunyai tingkat kerusakan paling tinggi diantara mesin lainnya. Fungsi Mesin Bartek adalah untuk mengunci jahitan pada bagian tertentu seperti saku atau daerah zipper. Pada penelitian kali ini penulis memfokuskan pengolahan data ke 3 komponen kritis yaitu Needle, Gigi Mesin Jahit, dan Sepatu Mesin Jahit. Dari hasil pengolahan data yang dilakukan dengan metode Risk Based Maintenance, Mesin Bartek memiliki risiko sebesar Rp 650.650.185 (5,721%). Risiko tersebut melewati kriteria penerimaaan perusahaan yaitu Rp 113.724.000 (1% pendapatan per tahun) maka dari itu diperlukannya Interval Perawatan. Interval Perawatan pada komponen Needle 315,36 jam, Sepatu Mesin Jahit 436,63 jam, dan Gigi Mesin Jahit 395,03 jam. Kata Kunci: Maintenance, Failure Mode Effect and Analysis, Risk Based Maintenance. Abstract ESGOTADO is a textile industry factory located in Bandung city. ESGOTADO has become one of the big sellers whose reach is all over Indonesia, many shops or well-known companies that become regular customers. Products from Esgotado are bags, clothes, shoes, pants but the most superior are bags. ESGOTADO has 4 types of machines that function to support the needs of the production process, However, at ESGOTADO there is also frequent damage to the engine which certainly can cause a lot of losses to the factory. In this study the author chose Bartek Machine as an object because this machine is used for all existing production processes and has the highest level of damage among other machines, the function of the Bartek Machine is to lock stitches in certain parts such as pocket or zipper area From the results of data processing carried out by the method of Risk-Based Maintenance the Bartek machine has a risk of Rp 650,650,185 (5.721%). These risks exceed the criteria for receiving the company, which is Rp. 113,724,000 (1% of income per year). The resulting maintenance interval is in the form of a restore task and discard task. The maintenance intervals in the Needle components are 315,36 hours, Sewing Machine Shoes are 436,63 hours and the Sewing Machine Gear is 395,03 hours. Keywords: Maintenance, Failure Mode Effect and Critical Analysis, Risk Based Maintenance.
Analisis Tingkat Efektivitas Mesin Cutting Pada Pabrik Pipa Menggunakan Metode Overall Equipment Effectiveness (OEE) Dengan Penerapan Total Productive Maintenance (TPM) Muhammad Irfan Syahputra Hadiyat; Endang Budiasih; Fransiskus Tatas Dwi Atmaji
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT XYZ merupakan salah satu industri manufaktur yang fokus memproduksi Pipa Baja dan Pipa Beton. Salah satu mesin yang digunakan pada lini produksi Pipa Baja adalah Mesin Cutting dengan frekuensi downtime terbanyak. Untuk mengatasi masalah tersebut, Total Productive Maintenance (TPM) merupakan metode yang relevan untuk diterapkan. Sebelum dilakukannya penerapan metode TPM, perlu dilakukannya analisis kondisi eksisting Mesin Cutting dengan menggunakan metode Overall Equipment Effectiveness (OEE) yang digunakan sebagai indikator tingkat efektivitas mesin. Berdasarkan hasil perhitungan menggunakan metode OEE diperoleh nilai sebesar 46,77% yang berarti nilai OEE pada Mesin Cutting belum mencapai nilai Standard World Class yaitu sebesar 85%. Faktor utama yang paling mempengaruhi rendahnya nilai OEE adalah Reduced Speed Loss dengan persentase kerugian sebesar 75,43% yang diperoleh dari perhitungan Six Big Losses. Penyebab kerugian tersebut dapat diidentifikasi menggunakan diagram fishbone pada faktor Reduced Speed Loss dengan mempertimbangkan empat faktor yaitu man, spare part, method dan machine. Setelah diketahui penyebab kerusakannya maka dapat dilakukan upaya penerapan Total Productive Maintenance untuk meningkatkan efektivitas Mesin Cutting dan mengurangi kerugian-kerugian yang terjadi pada mesin tersebut dengan melakukan empat tahap yaitu preparation, introduction, implementation dan consolidation & sustaining. Kata Kunci: Downtime, Total Produdctive Maintenance (TPM), Overall Equipment Effectiveness (OEE), Six Big Losses, Diagram Fishbone. Abstract PT XYZ is one of the manufacturing industries that focuses on producing Steel Pipes and Concrete Pipes. One of the machines used in the Steel Pipe production line is a Cutting Machine with the highest frequency of downtime. To overcome this problem, Total Productive Maintenance (TPM) is a relevant method to be applied. Prior to the implementation of the TPM method, it was necessary to analyze the existing conditions of Cutting Machines using the Overall Equipment Effectiveness (OEE) method which is used as an indicator of the level of machine effectiveness. Based on the calculation results using the OEE method obtained a value of 46.77%, which means that the OEE value on Cutting Machines has not reached the Standard World Class value of 85%. The main factor that most influences the low value of OEE is Reduced Speed Loss with a loss percentage of 75.43% obtained from the calculation of Six Big Losses. The causes of these losses can be identified using fishbone diagram on Reduced Speed Loss factors by considering four factors, namely man, spare parts, method and machine. After knowing the cause of the damage, efforts can be made to implement Total Productive Maintenance to improve the effectiveness of the Cutting Machine and reduce the losses that occur on the machine by carrying out four stages, namely preparation, introduction, implementation and consolidation & sustaining. Keywords : Downtime, Total Produdctive Maintenance (TPM), Overall Equipment Effectiveness (OEE), Six Big Losses, Fishbone Diagram
Analisis Efektivitas Mesin Bubut Pada PT. Smart Teknik Utama Menggunakan Metode Overall Equipment Effectiveness (OEE) Dan Reliability Availability Maintainability (RAM) Muhammad Ilham Z; Judi Alhilman; Endang Budiasih
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT. Smart Teknik Utama merupakan perusahaan yang begerak di bidang industri yang memproduksi produk Rodhing Point sebagai permintaan tahunan dari PT Len Indonesia. Mesin bubut adalah mesin yang digunakan untuk mengulir part dari rodhing sehingga mesin bubut harus memliki performansi yang bagus dan bekerja secara optimal. Maka kebijakan maintenance pada mesin bubut harus tepat. Metode yang digunakan yaitu Overall Equipment Effectiveness (OEE) Analysis untuk mengetahui kinerja dan tingkat efektivitas mesin. Serta faktor six big losses untuk mengetahui faktor apa yang menyebabkan nilai OEE rendah. Metode selanjutnya yaitu Reliability Availability Maintainability (RAM) Analysis pada sistem kritis mesin dan mengetahui nilai performance indicator di sistem kritis mesin. Berdasarkan OEE didapatkan nilai OEE sebesar 65,02%. Nilai OEE yang telah didapatkan belum mencapai kriteria standar yang telah ditetapkan oleh JIPM sebesar 85%. Berdasarkan six big losses, diketahui bahwa faktor yang paling berpengaruh terhadap penurunan efektivitas mesin bubut adalah faktor idling and minor stoppages sebanyak 25,75% dimana angka itu 69% dari kerusakan total sehingga mengakibatkan performa mesin menurun. Pada mesin bubut juga terdapat 3 sub sistem kritis yaitu headstock, leadscrew, dan toolpost. Masing-masing sub sistem memiliki R(t) = 200 jam yaitu, headstock 39%, leadscrew 99%, dan toolpost 95%, sedangkan untuk mencapai kondisi maintainability lebih dari 85% dibutuhkan M(t) = 5 jam. Nilai inherent availability system 99,81% dan operational availability system 94.08%. Kata Kunci : Reliability- Maintenance-Availability, Overall-Equipment-Effectiveness, Six-Big-Losses. Abstract PT. Smart Teknik Utama is a company engaged in the industry that manufactures Rodhing Point products where the company produces rodhing points as an annual request from PT Len Indonesia. Lathes are machines that are used to scroll parts of rodhing so that the lathe must have good performance and work optimally. So the maintenance policy on the lathe must be right. The method used is Overall Equipment Effectiveness (OEE) Analysis to determine the performance and level of engine effectiveness. And the six big losses factor to find out what factors cause low OEE values. The next method is Reliability Availability Maintainability (RAM) Analysis on the critical system of the engine and knowing the value of the performance indicator in the critical system of the engine. Based on the OEE overall equipment effectiveness method, the OEE value was 65.02%. The OEE value that has been obtained has not reached the standard criteria set by JIPM at 85%. Based on the six big losses, it is known that the factors that most influence the decrease in the effectiveness of the lathe are the idling and minor stoppages factors of 25.75% where the figure is 69% of the total damage resulting in decreased engine performance. In the lathe there are also 3 critical sub systems, namely headstock, leadscrew, and toolpost. Each sub-system has R (t) = 200 hours, namely 39% headstock, 99% leadscrew, and 95% toolpost, whereas to achieve maintainability conditions of more than 85% it takes M (t) = 5 hours. 99.81% inherent availability system value and 94.08% operational availability system. Keywords–Reliability-Maintenance-Availability, Overall-Equipment-Effectiveness, Six-Big-Losses
Analisis Total Biaya Dan Umur Mesin Menggunakan Metode Life Cycle Cost, Analisis Sensitivitas, dan Analisis Regresi Pada Seluruh Mesin Tower Di PT. Pikiran Rakyat Fajar Asyiraq Tilammura; Endang Budiasih; Fransiskus Tatas Dwi Atmaji
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT. XYZ adalah salah satu perusahaan yang terletak di Kota Bandung, Jawa Barat yang bergerak di bidang percetakan koran. Dalam proses produksinya, dibutuhkan 13 unit mesin untuk mampu menghasilkan produk jadi berupa koran. Mesin Tower merupakan salah satu jenis mesin yang terdapat pada lini produksi PT. XYZ. Mesin Tower terdiri atas 4 unit dengan nama Tower 1, Tower 2, Tower 3, Tower 4. Pihak perusahaan mengestimasi umur mesin akan mampu digunakan hingga 240 bulan atau 20 tahun. Namun pada rentang tahun 2016-2018 seluruh mesin tower total mengalami 1219 kali kerusakan. Jumlah kerusakan ini menjadi bahan perhatian untuk menganalisa Economic Replacement Time (ERT) seluruh mesin Tower. Untuk menentukan umur mesin (ERT) beserta total biayanya apakah masih sesuai dengan estimasi perusahaan, maka digunakan metode Life Cycle Cost (LCC). Kemudian untuk mencari pengaruh dari perubahan berupa kenaikan purchase price, penurunan operation cost, dan penurunan maintenance cost terhadap economic replacement time maka digunakan analisis sensitivitas yang kemudian dilanjutkan dengan analisis regresi untuk mendapatkan fungsi linier dari hasil perubahan variabel kenaikan purchase price, penurunan operation cost, dan penurunan maintenance cost terhadap ERT. Berdasarkan hasil perhitungan metode life cycle cost (LCC) maka didapatkan total nilai LCC terkecil adalah sebesar Rp. Rp. 95.990.741.336, dengan umur mesin optimal ialah 240 bulan. Dan berdasarkan hasil analisis regresi maka fungsi linier yang didapatkan adalah ERT = 240. Kata Kunci: Mesin Tower, Maintenance, Life Cycle Cost, Analisis Sensitivitas, Analisis Regresi. Abstract PT. XYZ is one of the companies that located in Bandung, West Java that engaged in printing newspapers. In the production process, it takes 13 engine units to be able to produce finished products in the form of newspapers. Tower machine is one of the machines that could be founded in the production line of PT. XYZ. Tower machines consist of 4 units with the names Tower 1, Tower 2, Tower 3, and the last is Tower 4. In 2016-2018, the demaged frequency of all tower machines is 1219. The amount of damage is the concern to analyze is it still same with the company estimation about the economic replacement time of the machine. To determine the ERT (Economic Replacement Time) and the total cost, Life Cycle Cost (LCC) method is used. Then to look for the effect of changes in the increase in purchase price, decrease in operation cost, and decrease in maintenance costs against ERT, sensitivity analysis is used, followed by regression analysis to obtain a linear function of the variable change in purchase price increase, decrease operation cost, and decrease cost of ERT. Based on the results of the calculation of the life cycle cost (LCC) method, the smallest total LCC value is obtained at Rp. 95.990.741.336, with optimal engine life of 240 months. And based on the results of the regression analysis, the linear function obtained is ERT = 240. Keywords: Tower Machine, Maintenance, Life Cycle Cost, Sensitivity Analysis, Regression Analysis
Usulan Penerapan Total Productive Maintenance (tpm) Untuk Meningkatkan Efektivitas Mesin Single Needle, Single Needle, Chain Stitch, Dan Zig Zag Menggunakan Metode Overall Equipment Effectiveness (OEE) Dan Overall Equipment Cost Loss (OECL) Di Pt. XYZ Fakhrul Razi Frima; Endang Budiasih; Judi Alhilman
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT. XYZ merupakan perusahaan industri manufaktur yang bergerak dibidang garment atau pakaian. Diantara mesin yang dipakai dalam satu line produksi, diantaranya menggunakan mesin single needle, single needle chain stitch, dan zig zag. Mesin tersebut merupakan mesin yang memiliki jumlah kerusakan paling tinggi pada Januari 2017 hingga Desember 2018. Kerusakan tersebut bisa menyebabkan rendahnya tingkat efektivitas mesin, maka diperlukan analisis untuk mengetahui penyebabnya menggunakan metode Overall Equipment Effectiveness (OEE) dan Overall Equipment Cost Loss (OECL). Berdasarkan perhitungan OEE tersebut dari bulan Januari 2017 hingga Desember 2018, didapatkan nilai OEE untuk mesin single needle sebesar 30,84%, untuk mesin single needle chain stitch sebesar 30,90%, dan untuk mesin zig zag sebesar 20,94%. Nilai tersebut belum mencapai Standar World Class yang telah ditetapkan sebesar 85%. Dan faktor Six Big Losses ketiga mesin tersebut yang menjadi penyebab rendahnya efektivitas mesin tersebut adalah faktor reduced speed loss dengan nilai untuk mesin single needle 78,45%, mesin single needle chain stitch 78,76%, dan untuk mesin zig zag 78,39%. Setelah itu dianalisis menggunakan metode Overall Equipment Cost Loss disetiap mesin tersebut, untuk nilai OECL pada mesin single needle sebesar Rp. 20.534.195.320, untuk mesin single needle chain stitch sebesar Rp. 20.419.669.919, dan pada mesin zig zag memiliki nilai Rp. 19.228.397.497. Kata kunci : Overall Equipment Effectiveness (OEE), Overall Equipment Cost Loss (OECL), Downtime, Efektivitas. Abstract PT. XYZ is a manufacturing industry company engaged in garment or clothing. Among the machines used in one production line, including using single needle machines, single needle chain stitch, and zig zag. The machine is the machine that has the highest amount of damage in January 2017 to December 2018. The damage can cause low levels of engine effectiveness, so analysis is needed to find out the cause using the Overall Equipment Effectiveness (OEE) and Overall Equipment Cost Loss (OECL) methods. Based on the OEE calculation from January 2017 to December 2018, the OEE value for single needle machines is 30.84%, for single needle chain stitch machines is 30.90%, and for zig zag machines is 20.94%. This value has not reached the World Class Standard which has been set at 85%. And the factors of the Six Big Losses of the three machines that are the cause of the low effectiveness of the machine are the reduced speed loss factor with the value of single needle machine 78.45%, single needle chain stitch machine 78.76%, and for the zig zag machine 78.39% . After that, it was analyzed using the Overall Equipment Cost Loss method in each machine, for the OECL value on the single needle machine Rp. 20,534,195,320, for a single needle chain stitch machine of Rp. 20,419,669,919, and the zig zag machine has a value of Rp. 19,228,397,497. Keywords: Overall Equipment Effectiveness (OEE), Overall Equipment Cost Loss (OECL), Downtime, Effectivity.
Usulan Interval Waktu Dan Estimasi Biaya Perawatan Mesin Cylinder Unit 2 Dengan Menggunakan Metode Reliability Centered Maintenance (RCM) (Studi Kasus : PT KLM) Muhammad Ilham Maulana; Endang Budiasih; Judi Alhilman
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT KLM merupakan perusahaan yang bergerak dalam bidang produksi kertas board yang biasa disebut dengan Coated Duplex Board (CDB) dengan variasi gramatur mulai dari 250 gsm hingga dengan 500 gsm. Produk kertas yang dihasilkan harus memenuhi kepuasan konsumen dan pengolahannya dilakukan sesuai standar dan ketentuan yang telah ditetapkan perusahaan. Mesin yang digunakan menggunakan sistem paralel dan proses produksi yang digunakan adalah sistem kontinyu sehingga jika terjadi kerusakan salah satu atau beberapa mesin akan menghambat proses produksi yang telah ditargetkan sehingga berdampak pada kerugian. Oleh karena itu, keandalan dari setiap mesin perlu diperhatikan untuk mendapatkan performansi kinerja mesin yang baik. Menurut data historis dari tahun 2013 hingga tahun 2017, mesin Cylinder unit 2 memiliki kerusakan mesin paling banyak yaitu 31 kali kerusakan. Dalam penelitian ini digunakan metode Reliability Centered Maintenance untuk menentukan kebijakan perawatan sesuai dengan karakteristik mesin, meminimasi biaya perawatan, dan menentukan labor force cost yang optimal. Berdasarkan hasil penelitian diperoleh empat scheduled on condition task, interval waktu perawatan adalah 23 hari dengan estimasi total biaya perawatan sebesar Rp 1.167.241.427,63 per tahun dan labor force cost menghemat sebesar 16,67% dari Rp 207.360.000,00 per tahun. Kata Kunci: Reliability Centered Maintenance, Biaya Perawatan, Labor Force Cost, Mesin Cylinder Abstract PT KLM is a company engaged in paper board production, commonly referred to as Coated Duplex Board (CDB) with a variety of grammage range from 250 gsm to 500 gsm. The resulting paper products must meet customer satisfaction and processing is carried out according to the standards and conditions set by the company. The machine uses a parallel system and the production process uses a continuous system so that if there is damage to one or several machines it will inhibit the production process that has been targeted so that it has an impact on losses. Therefore, the reliability of each machine needs to be considered to get a good machine performance. According to historical data from 2013 to 2017, the Cylinder machine unit 2 has the most machine damage, which is 31 times damage. In this study the Reliability Centered Maintenance method is used to determine maintenance policy according to machine characteristics, minimize maintenance costs, and determine the optimal labor force cost. Based on the research results obtained four scheduled on condition tasks, the maintenance time interval is 23 days with an estimated total maintenance cost of Rp 1,167,241,427.63 per year and labor force cost saves 16.67% from Rp 207,360,000.00 per year. Keywords: Reliability Centered Maintenance, Maintenance Cost, Labor Force Cost, Cylinder Machine
Co-Authors Addini, Haya Anuaryska Adi Riyanto Agung Firman Yusra Ahmad Suhaili Ahmad Suhaili Aji Pamoso Albertus Thio Kurnianto Aldila Candra Kusumaningrum Amalina, Yenny Nurul Aman Santoso Annisa Azmi Anugrah Ricky Wijaya Ariqa Radhwa Arvindha Ramaditya Ati, Laras Auliawati Auliawati, Auliawati Aviv, Muhammad Ayudita Oktafiani Baiq Asma Nufida Baiq Asma Nufida Baiq Asma Nufida Benny Satria Wahyudi Benny Satria Wahyudi Bina Wiraty Hasibuan Bonny Timutiasari, Bonny Brian Anggriawan Cahyono, Randi Wujud Dava Rizki Prayoga Dedek Sukarianingsih Dena Aprima Diputra Dhofar Shafarrizqullah Separman Dian Hayyu Rana Muna Dida Diah Damayanti Din Syamsuddin hasibuan Dio Taqiy Asyrof Donni Arisugewo Donny Verryrianto Sidabutar Dzakir, Daffa Mukhtar E. Effendy Effendy Effendy Erma Yulianingtyas Fadhilawardani, Ilma Fajar Asyiraq Tilammura Fakhrul Razi Frima Fariza Anizarini Fauziatul Fajaroh Fididio Agoeng Pamboedi Fitrachman, Naufal Aqiel Fransiskus Tatas Dwi Atmaji Giofaldi, Derri Azhar Grahesa Adri Putra Hafiz Radyastuti Hamim Thohari Mahfudhillah Hario Ardi Nugroho Harits Dzulyaddain Harwinvania Fauzia I Wayan Dasna Ida Purwami Ihsan Mahdi Wiragunanto Ilma Ade Restantri Intan Adzani Yunus Intifadhah, Arianne Deapati Irawati , Mimien Henie Iriawati, Mimien Henie Irsyad, Farrel Asyrofil Jayawarsa, A.A. Ketut Judi Alhilman Judi Alhilman Judi Alhilman Judi Alhilman Judi Alhilman Judi Alhilman, Judi Judy Alhilman Jusniar . Kensya Fadli Agustiant Putra Lalu Galeh Inggil Fatristya Latief Setiawan Luqman Arrezha Faiz Dirgantara Madya, Gelar Aditya Marina Yustiana Lubis Marzuq, Achmad Barik Mawadatur Rohmah Mawadur Rohmah Mentari Arie Dian Safitri Mimien H. I Al-Muhdhar Mimien Henie Irawati Mohammad Badar Mohammad Tajudin Mohammad Tajudin Muhammad Bangkit Hidayanto Muhammad Hamdan Muhammad Ilham Maulana Muhammad Ilham Z Muhammad Irfan Syahputra Hadiyat Muhammad Kamal Fikri Muhammad Rayhan Islamy Muhammad Rifki Fadil Muhammad Su’aidy Muntholib Murman Dwi Prasetio Murni Dwi Astuti Naufal Muhammad Iqbal Navi`a, Isna Jihan Noni Asmarisa Nopendri Nopendri Nopia, Popy Nur Hikmah Nurdinintya Athari Supratman Oktri Anggo Prayoga, Dava Rizki Prima Hutama Putra Abdi Purwami, Ida Putra Fajar Alam Putri Rahma Muliawati Putri Wahyuning Tyas Putty Aisya Rachmatul Baety Redi Ahmad Putra Nuranto Rena Amelia Revy Desfriansyah Riyadhi, Yovandi Rizal, Khoirul Rizki Suryo Wibowo Riztan Anggitya Sihombing Rofinda Gita Aini Rumengan, Riko Febrian RUSLY HIDAYAH S Susilowati Safi’isrofiyah Safi’isrofiyah Salsabilla, Annisa Maulidina Santy Agrasari Sari, Nilam Putri Siddiq, Abdullah Hasbi Silmi Nur Inayah Siti Khusnaini Puji Astuti Siti Marfuah, Siti SRI RAHAYU Sri Rahayu Srini M Iskandar Srini Murtinah Iskandar, Srini Murtinah Subandi Subandi Sueb Sueb, S Sugani, Sandika Lafaldi Suhadi Ibnu Suhadi Ibnu Suhadi Ibnu Suhadi, S Suharti Sumari Sumari Surjani Wonorahardjo Suryati Suryati Suryati Suryati Susilowati Susilowati Susilowati Susilowati Susilowati Susilowati Sutari, Wiyono Sutrisno Sutrisno Syarif, Muhamad Iqbal Syavira Ramadianti Taryana, Galih Purnama Tatang Mulyana Terrin Eliska Triana Suryani Try Hartiningsih Umarella, Rafif Fadhlurrahman Wiyono Wiyono wiyono Wulan Ratia Ratulangi Yahmin Yahmin Yeyek Ihdal Umam Yuko Tsukada Yulisya Zuriatni Yusran Khery Yusran Khery Yusran Khery, Yusran Yustiana, Marina Zul Arffan