Articles
IMPLEMENTATION OF CHLB IN PERSONAL HYGIENE TREATMENT AND SCABIES EXAMINATION AT NAHDATUL ULAMA ISLAMIC BOARDING SCHOOL SITI AISYAH MARTAPURA
mahdalena, mahdalena;
Mahpolah, Mahpolah;
Ilmi, Bahrul;
Junaidi, Junaidi;
Irfai, Irfai;
Suroto, Suroto;
Khair , Abdul;
Barkinah , Tut;
Dewi Dwiyanti , Ratih;
Amperawati , Metty;
Nurhamidi , Nurhamidi; Faturrahman, Faturrahman
JURNAL RAKAT SEHAT (JRS) : Pengabdian Kepada Masyarakat Vol 1 No 1 (2022)
Publisher : UPPM Poltekkes Kemenkes Banjarmasin
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (734.984 KB)
|
DOI: 10.31964/jrs.v1i1.9
ABSTRACT Clean and Healthy Living Behavior (CHLB) is the main factor determining the health status of the pesantren community (boarding school leaders, ustadz/ustadzah, students, other employees at the pesantren). CHLB in Islamic boarding schools is a set of behaviors that are practiced on the base of awareness as a result of learning, which makes the pesantren community independently able to prevent disease, improve their health, and play an active role in creating a healthy environment. This community service activity expects female students to live clean and healthy behaviors, especially in personal hygiene care, dental and oral care and preventing scabies. The methods used are health services, education and health training. The results of community service activities through clinical symptom screening showed that 21 female students had clinical symptoms of scabies. Only a few Santriwati have a Clean and Healthy Lifestyle, because almost half of them still lack knowledge about personal hygiene. Many students have good dental and oral health care. For female students, to always maintain health and always carry out PHBS at all times, and immediately go to the health service for a health check if you experience clinical symptoms of scabies. Health workers should regularly, regularly provide health services and foster UKS in Islamic Boarding Schools, the health of the female students is always monitored.
BUDAYA BELAJAR SATU JAM BERSAMA BUKU SANTRI DI PONDOK PESANTREN SALAFIYAH-SYAFI`IYAH SUKOREJO SITUBONDO
Junaidi, Junaidi;
Hidayat, Afif
Ar-Risalah Media Keislaman Pendidikan dan Hukum Islam Vol 20 No 1 (2022): (April 2022)
Publisher : LPPM IAI IBRAHIMY GENTENG BANYUWANGI
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.69552/ar-risalah.v20i1.1339
Pesantren literacy, both reading, ethics, and writing culture must be appreciated as the first step in freeing the country from the constraints of poverty on the one hand and moral crisis on the other. Because in fact, the progress of a nation starts from a love of literacy that transforms into a culture of literacy that is deeply rooted through continuity every time. In this study focused pesantren literacy in the frame of a series of reading activities an sich. (1) Implementation of One Hour Activities with Books at Pondok Pesantren Salafiyyah Syafi'iyyah Sukorejo Situbondo as an effort to increase the reading interest of students who are guided directly by the Head of Room and the seniority of the room in collaboration with relevant pesantren stakeholders and the final result of the One Hour Activity With Books as a Santri Learning Culture at Pondok Pesantren Salafiyyah Syafi'iyah Sukorejo Situbondo is the birth of interest in reading sukorejo students on the one hand and the increase in the increase santri on the other side.
فتوى عقد التأمين الصحي الإسلامي ومطابقته لمقصد حفظ النفس
Junaidi;
Imron Rosyadi;
Muhammad Arifin
al-Afkar, Journal For Islamic Studies Vol. 7 No. 1 (2024)
Publisher : Perkumpulan Dosen Fakultas Agama Islam Indramayu
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.31943/afkarjournal.v7i1.928
يبتلى الإنسان العديد من الأخطار والمصائب في حياته اليومية، وبالتالي يساهم التأمين في معالجة عواقب تلك المخاطر عندما تتحقق من خلال التعويض المدفوع للمتضررين. وخاصة المشاكل الصحية التي تعتبر من الاحتياجات الأساسية لكل فرد. فتكمن أعمال التأمين الصحي الإسلامي في مجال حفظ مصلحة النفس في الأمور التي تهدد الحياة أو تلف الأطراف التي تسبب الإعاقة أو الوفاة. وعلى ذلك لفت نظر الباحث للبحث والتحقيق في مفهوم عقد التأمين الصحي الإسلامي ومطابقته لمقصد حفظ النفس، دراسة مقارنة بين الفتاوى الصادرة عن الهيئة الشرعي الوطني لمجلس العلماء الإندونيسي (DSN-MUI) و القرار عن هيئة المحاسبة والمراجعة للمؤسسات المالية الإسلامية (AAOIFI). وسيتناول الباحث في هذا البحث عما يلي: ما العلاقة بين فتوى DSN-MUI وقرار AAOIFI بشأن التأمين الصحي ومقصد حفظ النفس؟، ما هو التكييف الأقرب إلى مقصد حفظ النفس؟. وهذا البحث بحث مكتبي، ينتهج فيه الباحث منهج الاستقرائي التحليلي. ومن أهم نتائج البحث التي توصل إليه الباحث: بين DSN-MUI وAAOIFI هناك علاقة قوية وهناك أوجه تشابه كثيرة بين الفتوى والقرار. بشكل ضمني أن فتوى DSN-MUI أقرب إلى مقصد حفظ النفس من AAOIFI.
Pengembangan Perangkat Pembelajaran Matematika Berbasis Penemuan Terbimbing Untuk Meningkatkan Kemampuan Pemecahan Masalah Matematis Peserta Didik Kelas VI SDN 02 Sitiung
Maizar, Maizar;
Junaidi, Junaidi;
Fatimah, Fatia
JEMS: Jurnal Edukasi Matematika dan Sains Vol 11, No 2 (2023)
Publisher : Universitas PGRI Madiun
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.25273/jems.v11i2.15901
Problem-solving abilities aim to increase students' analytical power in making decisions so as to help shape students' perceptions by seeing mathematics as an integrated part of life, but in reality students' problem-solving abilities are not yet optimal, one of the causes is the unavailability of learning tools that facilitate students students to improve their ability to solve mathematical problems. This study aims to produce learning tools based on the guided discovery model to improve students' problem-solving abilities in grade VI elementary school mathematics LKPD. This development research uses the Plomp model which consists of 3 stages, namely, preliminary, prototyping and assessment. The research subjects were students of class VI at SDN 02 Sitiung. Validation was carried out by experts in mathematics education, educational technology, and Indonesian. Practicality of learning tools seen from the results of practicality questionnaires on the implementation of learning, student and teacher questionnaires. Effectiveness is seen from the learning outcomes of students. The results of the analysis of the validity data indicate that the resulting guided discovery model-based learning tools have met the valid criteria in terms of content and construct. The learning tools are practical in terms of implementation, ease and time required, because the developed learning tools can be applied in mathematics learning activities. Learning tools have also been effective because they can improve learning outcomes. Based on these results, it can be concluded that the mathematics learning tools based on the guided discovery model for class VI Semester I that have been produced can be declared valid, practical and effective.
KAJIAN PENANGANAN KERUSAKAN STRUKTUR RIGID PAVEMENT MELAUI DESAIN ULANG TULANGAN BETON DAN WIREMESH (STUDI KASUS JALAN XYZ)
Junaidi, Junaidi;
Supriyadi, Supriyadi;
Wahyuni, Anis;
Mubarok, M. Rifqi
Bangun Rekaprima Vol. 9 No. 2 (2023): Oktober 2023
Publisher : Politeknik Negeri Semarang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.32497/bangunrekaprima.v9i2.5206
Jalan tol merupakan infrastruktur penting untuk melancarkan konektivitas dari satu tempat ke tempat lain serta mengurangi waktu perjalanan kendaraan. Salah satu jalan tol yang dalam tahap pembagunan di Indonesia adalah Jalan Tol XYZ. Proyek jalan tol ini terdiri dari pekerjaan slab on pile, pekerjaan timbunan, pekerjaan jembatan, pekerjaan perkerasan kaku (rigid pavement) dan perkerasan lentur (flexible pavement). Dalam pekerjaan perkerasan kaku, proyek ini terjadi permasalahannya itu terjadi keretakan perkerasan kaku yang berada diatas box culvert yang pada struktur bawahnya dilakukan perbaikan tanah menggunakan tiang pancang. Oleh karena itu, tulisan ini dilakukan untuk menganalisis faktor-faktor yang menyebabkan terjadinya keretakan tersebut serta mengusulkan solusi teknisnya sehingga hasilnya dapat digunakan untuk menjadi referensi dalam pekerjaan selanjutnya. Hasil analisis menunjukkan bahwa setelah proses pengecoran perkerasan kaku, tanah dasar di bawahnya masih mengalami penurunan sebesar 10 mm dan 6 mm. Akibatnya timbul keretakan pada struktur perkerasan kaku karena perbedaan penurunan dari box culvert yang diasumsikan tidak mengalami penurunan kembali dengan timbunan di sekitarnya yang masih mengalami penurunan. Hasil analisis juga menunjukkan bahwa desain perkerasan kaku menggunakan tulangan tunggal sehingga kapasitas beton (Mu) lebih kecil dari berat beton itu sendiri yang berakibat beton mengalami keretakan. Penanganan perbaikan yang diusulkan adalah plat beton bertulang yang awalnya menggunakan tulangan tunggal diubah menjadi tulangan ganda yang diletakkan pada daerah tarik dan tekan penampang beton agar mampu menahan gaya tekan yang timbul dari tanah dan dari beban lalulintas yang lewat. Selain itu juga ditambahkan tulangan wiremesh pada daerah tarik beton agar jika terjadi penurunan tanah masih mampu menahan beban tersebut.
KAJIAN DAYA DUKUNG PONDASI BORED PILE BERDASARKAN DATA N-SPT, DATA RENCANA DAN PDA TEST (Studi Kasus : Pembangunan Jalan Tol Yogyakarta ”“ Bawen Seksi 1 Paket 1)
Junaidi, Junaidi;
Supriyadi, Supriyadi;
Larasati, Novita;
Utama, Clara Arnindhita Sekar Wira Satya
Bangun Rekaprima Vol. 10 No. 1 (2024): April 2024
Publisher : Politeknik Negeri Semarang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.32497/bangunrekaprima.v10i1.5491
The bored pile foundation work at the locations of Kali Konteng, Sangu Banyu, and Kali Mataram in the Yogyakarta - Bawen Toll Road Construction Project Section 1 Package 1 exhibits differences in planned and actual (field) load-bearing capacity values. The aim of this study is to analyze the load-bearing capacity values of bored piles. This research utilizes secondary data in the form of planning data, PDA test results, and N-SPT data. Load-bearing capacity calculations are conducted using a conventional method with the Reese & Wright formula. The research findings reveal that the ultimate load-bearing capacity of cast-in-place concrete bored piles calculated based on N-SPT data using the Reese & Wright 1977 method is 1918.08 tons at the Kali Konteng location, 1532.34 tons at the Sangu Banyu location, and 1416.34 tons at the Kali Mataram location. Meanwhile, the planned load-bearing capacity at the Kali Konteng location is 1312.5 tons, at the Sangu Banyu location is 1175 tons, and at the Kali Mataram location is 1300 tons. At the abutment locations of Kali Konteng and Sangu Banyu, the load-bearing capacity values based on the PDA Test exceed the planned load-bearing capacity values but are smaller than the load-bearing capacity values calculated using the Reese & Wright method. Conversely, at the abutment location of Kali Mataram, the load-bearing capacity value determined by the PDA Test exceeds both the planned load-bearing capacity value and the load-bearing capacity value calculated using the Reese & Wright method.
Kajian Eksperimental Live Bed Scour Di Hilir Bed Sill Pada Sedimen Dasar Tidak Seragam
Junaidi, Junaidi;
Mahmudi, Wildana Latif;
Suroso, Suroso;
Sugiharto, Sugiharto
Bangun Rekaprima Vol. 4 No. 1 (2018): April 2018
Publisher : Politeknik Negeri Semarang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (732.309 KB)
|
DOI: 10.32497/bangunrekaprima.v4i1.1116
Proses gerusan terjadi pada kondisi clear water scour setelah tercapainya fase kesetimbangan (equilibrium) dimana dimensi lubang gerusan yang terjadi di hilir bangunan sangat bergantung pada waktu. Ada tiga tahap pembentukan lubang gerusan lokal, yaitu tahap awal yang cepat, tahap pembentukan, dan tahap akhir berupa perlambatan hingga mencapai kesetimbangan (equilibrium). Bentuk lubang gerusan sangat bergantung pada jarak antar bed sill. Ada dua bentuk lubang gerusan, yaitu bentuk quasi-parabolic dan spoon. Bentuk quasi-parabolic terjadi pada jarak yang pendek antar bed sill, sementara bentuk spoon terjadi pada jarak bed sill yang besar. Lapis armoring memiliki nilai diameter median (d50) yang makin besar dengan makin besarnya jarak interval antar bed sill. Fenomena gerusan di hilir bangunan hidraulik di alam terjadi pada kondisi banjir dimana juga terangkut material / butiran-butiran sedimen dari hulu. Penelitian ini dilakukan untuk mengamati perilaku gerusan di hilir bed sill pada kondisi adanya sedimen terangkut dari hulu bangunan (live bed scour) dengan material dasar saluran dari sedimen tidak seragam. Penelitian dilakukan di Laboratorium Hidraulika Jurusan Teknik Sipil Politeknik Negeri Semarang dengan menggunakan saluran terbuka / flume yang dilengkapi dengan sirkuit hidraulik, pintu, dan alat-alat ukur lainnya. Gerusan lokal di hilir bed sill pada kondisi live bed scour diteliti dengan melakukan serangkaian percobaan dimana material sedimen dasar tidak seragam digunakan dengan gradasi yang sama dengan sedimen yang disuplai dari hulu. Hasil penelitian menunjukkan bahwa kedalaman gerusan maksimum ys terbentuk secara cepat dan mencapai nilai mendekati kesetimbangan dalam waktu pendek (2 jam). Fase erosif jangka pendek secara jelas terbedakan dari fase jangka panjang berdasarkan profil pembentukan lubang gerusan terhadap waktu. Pada awal pengujian juga tampak bahwa kedalaman gerusan berkurang dengan meningkatnya debit aliran. Pengurangan kedalaman gerusan maksimum (ys) pada kondisi live bed scour dibanding pada kondisi clear water scour dapat diukur dari loncat morfologis a1. Nilai-nilai non dimensi rasio a1/Δ.D50 menegaskan bahwa persamaan yang digunakan dapat dipilih untuk a1/Δ.D50 hingga 9.0.Kata kunci: Gerusan, bed sill, live bed scour, equilibrium, flume.
KAJIAN KETERLAMBATAN PROYEK BERDASARKAN ANALISIS HARGA SATUAN PEKERJAAN PADA PROYEK PEMBANGUNAN JALAN LAYANG XYZ
Junaidi, Junaidi;
Supriyadi, Supriyadi;
Candradewi, Afhandani;
Pradikdya, Aldito Bayu
Bangun Rekaprima Vol. 9 No. 1 (2023): April 2023
Publisher : Politeknik Negeri Semarang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (387.259 KB)
|
DOI: 10.32497/bangunrekaprima.v9i1.4408
Infrastruktur di Indonesia berkembang sangat pesat, hal ini dilakukan dengan tujuan untuk menunjang kemajuan perekonomian di Indonesia.Salah satu infrastruktur yang dibangun yaitu Jalan Layang XYZ. Proyek ini memiliki nilai kontrak sebesar Rp. 149.394.103.000,- dan durasi pekerjaan selama 330 hari (46 minggu), dengan adanya batasan waktu dan biaya tersebut diperlukan pengendalian yang baik dan matang. Progress yang berjalan hingga penelitian ini dibuat telah mencapai minggu ke-37 dengan progress realisasi sebesar 71,847%, sedangkan progress rencana pada minggu ke-37 sebesar 80,422% dengan deviasi antara progress rencana dan progress realisasi sebesar -8,574%. Deviasi tersebut disebabkan oleh ketergantungan antara pekerjaan satu dengan yang lain yang sangat kompleks sehingga tidak jarang menyebabkan keterlambatan proyek dan pengendalian menjadi rumit. Berdasarkan hasil analisisdan pembahasan, dapat disimpulkan bahwa volume realisasi berdasarkan progress realisasi dan volume realisasi berdasarkan AHSP memiliki nilai yang sama, Hal ini menunjukan bahwa faktor-faktor keterbatasan lahan yang mempengaruhi efisiensi alat, padatnya volume lalu lintas di sekitar daerah lokasi proyeksehingga dapat menghambat mobilisasi alat, waktu operasi (waktu siklus) alat berat yang dibutuhkan operator lebih lama dari yang direncanakan, serta penurunan jam efektif kerja karena pekerja membutuhkan waktu persiapan untuk melaksanakan pekerjaanmenjadi faktor penyebab terjadinya deviasi antara kurva S rencana dengan kurva S realisasi. Faktor-faktor lain penyebabterjadinya keterlambatan berdasarkan hasil wawancara di lapangan antara lain; a) keterlambatan dalam penyediaan alat berat launcher untuk erection girder yang mengakibatkan mundurnya pelaksanaan pekerjaan erection girder serta pekerjaan pemancangan oprit jalan layang sebelah barat, b) perubahan design konstruksi dikarenakan jenis kontrak pada proyek ini merupakan design and built di mana kondisi lokasi yang telah ditetapkan pada kontrak tidak dijelaskan secara spesifik sehingga terdapat perbedaan kondisi dengan realita di lapangan, serta c) perubahan pada gambar kerja karena menyesuaikan kondisi di lapangan, sehingga dalam pelaksanaannya menyebabkan pekerjaan konstruksi menjadi terhambat
OPTIMALISASI PEMANFAATAN LIMBAH PECAHAN BATA UNTUK MENINGKATKAN KETERAMPILAN BATU DI KELURAHAN NGADIRGO KOTA SEMARANG
Wicaksono, Teguh Mulyo;
Wasino, Wasino;
Mukhlisin, Muhammad;
Supriyadi, Supriyadi;
Sudarmono, Sudarmono;
Junaidi, Junaidi;
Sukoyo, Sukoyo;
Suwarno, Anung;
Mahmudi, Wildana Latif;
Abdillah, Rifqi Aulia
Bangun Rekaprima Vol. 10 No. 1 (2024): April 2024
Publisher : Politeknik Negeri Semarang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.32497/bangunrekaprima.v10i1.5467
2022 is the beginning of offline learning after the Covid-19 pandemic. where previously learning was carried out online including practicums. One of the practicums carried out in the Semarang State Polytechnic Civil Engineering department is the masonry practicum which is carried out for semester 1 students. With the offline masonry practicum, the practicum will leave behind brick fragments that can no longer be used. These broken bricks will usually be thrown away at the end of each semester after all the practicums have been carried out. the proportion of brick fragments to intact bricks usually reaches 30% to 40%. The construction workers come from the Ngadirgo community, they learn building work autodidactically based on experience. With the continued development of BSB, there are quite a lot of employment opportunities, including development workers. Techniques and methods of masonry work that comply with construction standards can increase the ability of craftsmen to become skilled workers so that it is hoped that they can improve the welfare of the community around Ngadirgo sub-district, Mijen sub-district. Ngadirgo sub-district currently has a village cemetery which is located in Ngadirgo hamlet RW 2, in this cemetery there is no coffin house which is used to store death equipment including the coffin which is currently still entrusted to one of the residents' house. With the existence of coffin house products made from brick masonry in the village cemetery area.
PRIORITAS PEMELIHARAAN JALAN BERBASIS TREATMENT PRIORITY INDEX (TPI) DI JALAN PERKERASAN ASPAL
Pangesti, Rendy Dwi;
Sulistiawati, Baiq Heny;
Wahyono, Herry Ludiro;
Junaidi, Junaidi;
Goro, Garup Lambang
Bangun Rekaprima Vol. 10 No. 1 (2024): April 2024
Publisher : Politeknik Negeri Semarang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.32497/bangunrekaprima.v10i1.5473
The increase in the number of vehicles and economic growth in the city of Semarang puts significant pressure on road infrastructure. So it is necessary to prioritize maintenance on several road sections. This research uses the Treatment Priority Index (TPI) approach to identify road repair priorities in Tembalang District, Semarang City. Data on road conditions and daily traffic volume are variables in the TPI analysis and the data is analyzed using the Provincial District Road Management System (PKRMS). The results of the TPI analysis obtained road sections with critical conditions, especially Telumpak (TPI: 26.2) and Salak (TPI: 25.7). These sections require immediate repairs to ensure the safety and comfort of road users. This research provides a basis for information for policy makers to allocate resources efficiently, ensure sustainable road infrastructure, and support effective mobility in Semarang City, especially in Tembalang District.